Report to work definition

Report to work means on the job at the appointed time and able to perform the work assigned. "Reporting to work" has a similar meaning;
Report to work means that the employee filling a permanent full-time position reports to the
Report to work means that the employee filling a permanent full-time position reports to the business' zone establishment on a regular basis.

Examples of Report to work in a sentence

  • Report to work upon dismissal from jury duty if dismissal occurs during the employee’s regular working hours.

  • Full Day Closure Report to work OR use personal leave hours Do NOT report to work – School day will be required to be made up at a later date.

  • Report to work with any measurable amount of prohibited substances in their system.

  • It is the County’s policy that each employee who performs safety-sensitive duties shall do the following:• Participate in mandatory training about the effects and consequences of prohibited drug and alcohol use on personal health, safety, and the work environment; and• Participate in the controlled substances and alcohol testing program; and• Report to work without the presence of any controlled substance, or alcohol above a0.02 blood alcohol concentration, in her or his body.

  • Report to work with any measurable amount of a controlled substance, intoxicant or illegal drug in their system.

  • Report to work, regular schedule; if unable to get in, arrive late, etc.

  • APPENDIX C: DEFINITIONS‌ Definitions: ON-DUTY TIME shall be defined as: Report to work until return to base station or parkout after completion of assigned movement.

  • Report to work with mindset to abide by physical distancing processes.

  • Employees are expected to observe the following standards of conduct:• Recognize and respect the rights of students, parents, other employees, and members of the community.• Maintain confidentiality in all matters relating to students and coworkers.• Report to work according to the assigned schedule.• Notify their immediate supervisor in advance or as early as possible in the event that they must be absent or late.

  • During emergency school closings, when administrative offices are open, unit members may choose one of the following options: • Report to work as scheduled.


More Definitions of Report to work

Report to work. Day Summary 21 1. Elementary – The 186 days upon which elementary employees are expected to report to work 22 include the following: 23 a. Two (2) building days prior to the first day of the student school year (or rescheduled at 24 the building level for later in the school year with advance notice to building staff as 25 determined by the School Leadership Team). One (1) of these building days is a 26 professional learning day (PLD) included in the 183-day base contract and one (1) of these 27 building days is within the three (3) supplemental contract days included in the PLE 28 contract. 29 b. Four (4) half-days on student instructional days for District professional learning 30 equivalent to two (2) PLDs. These four (4) days are within the 183-day base contract. 31 c. Two (2) half-days on student instructional days and four (4) full days outside student 32 instructional days for family engagement (see Article VII, Section 6). The two (2) half-days 33 and two (2) of the four (4) full days are within the 183-day base contract. The other two 34 (2) full days are within the three (3) supplemental contract days included in the PLE 35 contract. 36 d. 174 full student instructional days. 37 2. Middle School – The 186 days upon which middle school employees are expected to report 38 to work include the following: 1 a. Two (2) building days prior to the first day of the student school year (or rescheduled at 2 the building level for later in the school year with advance notice to building staff as 3 determined by the School Leadership Team). One (1) of these building days is a 4 professional learning day (PLD) included in the 183-day base contract and one (1) of these 5 building days is within the three (3) supplemental contract days included in the PLE 6 contract. 7 b. Four (4) half-days on student instructional days for District professional learning 8 equivalent to two (2) PLDs. These four (4) days are within the 183-day base contract. The 9 calendar committee in Article VII, Section 6, will schedule two (2) half-days back-to-back 10 to facilitate secondary student schedules on those half-days that balance instructional 12 c. Four (4) full days outside student instructional days for family engagement (see Article

Related to Report to work

  • Statement of Grievance shall name the grievant(s) involved, the facts giving rise to the grievance, the provision(s) of the Agreement alleged to be violated, and the remedy (specific relief) requested.

  • Progress Report means the report similar in form and content to that attached hereto as Appendix III.

  • Expedited review means an examination, in accordance with

  • QAP shall have the meaning set forth in Clause 11.2;

  • Progress Reports The Progress Reports as required by the individual Task Work Orders issued pursuant to this Agreement. Responsible: Responsible or Responsibility means the financial ability, legal capacity, integrity and past performance of Contractor and as such terms have been interpreted relative to public procurements. See NYS Finance Law § 163(1)(c).

  • Progress Report Form means UN Women’s standard form for progress reports attached to this Agreement.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Annual Work Plan means each work plan approved by the Association under Section I.C of Schedule 2 to this Agreement for inclusion in the Project.

  • Development Report means a written account of Licensee’s progress under the Development Plan having at least the information specified on Appendix B to this Agreement, and shall be sent to the address specified on Appendix B.

  • health and safety specification means a site, activity or project specific document prepared by the client pertaining to all health and safety requirements related to construction work;

  • Delegate List/Report means a list submitted by the Contractor indicating the names of designated Attendees who have made reservations under the Program’s room block.

  • Timeline means the list of critical dates and actions included in the Introductory Materials.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Sustainability Report the annual non-financial disclosure report prepared in accordance with the Standard for Sustainability Reporting publicly reported by the Borrowers and published on an Internet or intranet website to which each Bank and the Administrative Agent have been granted access free of charge (or at the expense of the Borrowers).

  • Annual Statement of Compliance As defined in Section 3.13.

  • Compliance Statement is that certain statement in the form attached hereto as Exhibit B.

  • health and safety file means a file, or other record containing the information in writing required by these Regulations "health and safety plan" means a site, activity or project specific documented plan in accordance with the client's health and safety specification;

  • Trial preparation record means any record that contains information that is specifically compiled in reasonable anticipation of, or in defense of, a civil or criminal action or proceeding, including the independent thought processes and personal trial preparation of an attorney.

  • GLJ Report means the independent engineering reserves evaluation of certain oil, NGL and natural gas interests of the Company prepared by GLJ dated February 11, 2022 and effective December 31, 2021.

  • Submittals means all shop drawings, diagrams, illustrations, brochures, schedules, samples, and other data which are prepared by the Contractor, a Subcontractor, manufacturer, Supplier, or distributor, which illustrate how specific portions of the Work shall be fabricated or installed.

  • service delivery and budget implementation plan means a detailed plan approved by the mayor of a municipality in terms of section 53(1) (c) (ii) for implementing the municipality’s delivery of municipal services and its annual budget.

  • MI Reporting Template means the form of report set out in the Annex to Framework Schedule 8 (Management Information) setting out the information the Supplier is required to supply to the Authority;

  • ESDM Report means the Emission Summary and Dispersion Modelling Report prepared in accordance with the Procedure Document by Envision Compliance and dated July 3, 2007 submitted in support of the application, and includes any amendments to the ESDM Report listed in Schedule A and all up-dated ESDM Reports prepared as required by the Documentation Requirements conditions of this Certificate.

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • Concurrent review means utilization review conducted during

  • Geotechnical report or "geotechnical analysis" means a scientific study or evaluation conducted by a qualified expert that includes a description of the ground and surface hydrology and geology, the affected land form and its susceptibility to mass wasting, erosion, and other geologic hazards or processes, conclusions and recommendations regarding the effect of the proposed development on geologic conditions, the adequacy of the site to be developed, the impacts of the proposed development, alternative approaches to the proposed development, and measures to mitigate potential site-specific and cumulative geological and hydrological impacts of the proposed development, including the potential adverse impacts to adjacent and down-current properties. Geotechnical reports shall conform to accepted technical standards and must be prepared by qualified professional engineers or geologists who have professional expertise about the regional and local shoreline geology and processes.