Tenant Construction Requirements. Except as otherwise provided for herein, Tenant shall make no additions, alterations or improvements to the Premises, or improvements constructed thereon, without the prior written approval of the Department, which approval shall not be unreasonably withheld, conditioned or delayed. Tenant acknowledges and agrees that it shall not be deemed unreasonable for the Department or County to withhold consent to any improvements determined to be a potential hazard to air navigation by the Department, County or FAA or which would be inconsistent with applicable federal laws or regulations, or FAA orders, advisory circulars or other similar guidance documents. Any such additions, alterations or improvements shall be made in accordance with the construction requirements contained herein and as established by the Department. All improvements constructed or placed on the Premises, including drainage and landscaping, shall be of attractive construction and first-class design, shall comply with any and all applicable governmental laws, regulations, rules and orders shall follow standard construction methods, and shall be constructed in accordance with the requirements of this Article. Notwithstanding the foregoing, additions, alterations or improvements to interior improvements to the Premises that do not require a building permit, such as interior painting and replacement of flooring, and replacement of damaged exterior landscaping with the same landscaping materials, shall not require the Department’s prior approval.
AutoNDA by SimpleDocs

Related to Tenant Construction Requirements

  • Construction Requirements a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.

  • Installation Requirements 7.8 We (if we install the System) or our contractor (if we procure a contractor to install the System) must:

  • Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the internal laws of the State of New York.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • During Construction Upon request of the Owner the Contractor shall submit written proposals for unit prices to be applied in the event Change Order Work is authorized by the Owner to be performed under Case (b).

  • Design Requirements 9.2.1. Metal liner The compressive stress in the liner at zero pressure and 15 °C shall not cause the liner to buckle or crease.

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.