Systems Startup and New Equipment/Systems Commissioning Sample Clauses

Systems Startup and New Equipment/Systems Commissioning. In support of DCAMM’s third-party commissioning agent, the CONTRACTOR shall conduct performance testing of each element and total system of the installed New Equipment/Systems in accordance with the procedures specified in the commissioning plan developed in accordance with Section 22.2 Design Deliverables and Submittals prior to issuance of a Final ECM Acceptance Notice. Testing shall be designed to determine if the New Equipment/Systems are functioning in accordance with both its published specifications and the requirements of the Contract.
AutoNDA by SimpleDocs
Systems Startup and New Equipment/Systems Commissioning. CONTRACTOR shall conduct a thorough and systematic performance test of each element and total system of the installed New Equipment/Systems in accordance with the procedures specified in Schedule B-5: Commissioning/M&V and prior to Substantial Completion of each ECM as specified herein. Testing shall be designed to determine if the New Equipment/Systems are functioning in accordance with both its published specifications and the requirements of this Contract, and to determine if all associated building systems, subsystems or components are functioning properly within the new integrated environment.

Related to Systems Startup and New Equipment/Systems Commissioning

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Equipment and Software Requirements In order to view and retain electronic communications that we make available to you, you must have: • A PC or other device with an Internet browser that has “cookies” enabled and supports 128 bit encryption • An Internet connection • An email address • A PDF viewer (such as Adobe Reader) • A printer or computer with sufficient electronic storage space All communications shall be delivered to the last address we have on file for you. These notices will be sent through electronic delivery (email) and will be considered delivered the same day as sent. If you have opted out of electronic delivery, communications sent to you through the United States Postal Service are considered delivered 5 business days after the postmark date. It is your responsibility to notify the Custodian of any email address change or residential address change. We will not be held liable for any losses or damages if you have not provided Custodian with the most current address information. The electronically signed copy of this document should be considered equivalent to a printed hard copy form. It is considered a true and complete record of the document, admissible in arbitration and/or administrative hearings or proceedings. Your electronic signature on the Application and other electronic forms such as the Investment Direction are considered valid and the same as if the paper form or Application were signed.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • AIN Selective Carrier Routing for Operator Services, Directory Assistance and Repair Centers 4.3.1 BellSouth will provide AIN Selective Carrier Routing at the request of <<customer_name>>. AIN Selective Carrier Routing will provide <<customer_name>> with the capability of routing operator calls, 0+ and 0- and 0+ NPA (LNPA) 555-1212 directory assistance, 1+411 directory assistance and 611 repair center calls to pre-selected destinations.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

Time is Money Join Law Insider Premium to draft better contracts faster.