System Design and Configuration Sample Clauses

System Design and Configuration. Section 5.1 Hub Distribution Centers Licensee shall build at minimum a 750 MHz hybrid fiber/coaxial two-way cable system (“HFC System”) capable of delivering 108 channels of Video Programming with three (3) hub distribution centers, one (1) of which shall be located in Boston and shall be designated the System headend. The hybrid fiber/coaxial cable system shall be constructed throughout the entire City of Boston in accordance with the construction schedule in Section 3.2. The Licensee shall install fiber optic lines to nodes which shall initially have capacity to provide service to an average of fifteen hundred (1,500) homes. The configuration of the nodes shall be “scalable” to service an average of five hundred (500) homes per node. Connections between the nodes and Subscribers may include coaxial cable.
AutoNDA by SimpleDocs
System Design and Configuration. The System Design and Configuration phase involves designing and developing the Cityworks solution to meet the requirements of the County’s user department as communicated by the County Project Team participants during the configuration workshops. Tasks in this phase include Cityworks configuration efforts, development of standard reports and dashboards, ensuring alignment with legacy data migrations. The outcome of this phase is a Cityworks solution that is fully configured and is ready for User Acceptance Testing (UAT) in Phase 3.
System Design and Configuration. A. Section 5.1 Hub Distribution Centers shall be stricken in its entirety and replaced with the following:

Related to System Design and Configuration

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • System Description The DLCS is a network consisting of devices which are remotely controlled over RF transmission equipment by the PowerCAMPTM Software or equivalent. CL&P shall have access to the PowerCAMP™ LMS (as defined below) via the web interface. The PowerCAMPTM LMS shall include the software and hardware necessary to manage the Control Devices installed at the End-use Equipment at Participating Facilities. The PowerCAMPTM LMS includes AER’s PowerCAMPTM Server and PowerCAMPTM Suite, networking equipment, and third party software. PowerCAMPTM LMS Hardware

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • Maintenance and Support Services As long as you are not using the Help Desk as a substitute for our training services on the Tyler Software, and you timely pay your maintenance and support fees, we will, consistent with our then-current Support Call Process:

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Specification and Service Levels The Specification sets out the Services that the Contractor has undertaken to provide. The Specification includes Service Levels setting out particular levels of service that the Contractor has undertaken to meet.

  • Functionality Customer is entitled to additional functionality previously purchased or bundled with the software if available in the version or update released on or after the start date of the Agreement. Customer acknowledges that certain functionality in current and previous software versions may not be available in future upgrades. Added functionality may require additional paid services (clinical and technical) to configure and support.

  • LAYOUT OF WORK The Contractor shall lay out its Work from base lines and benchmarks indicated on the Drawings, and shall be responsible for verification of all measurements in connection with the layout. The Contractor shall furnish all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the Work. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by Princeton University until authorized to remove them. If such marks are destroyed by the Contractor or through its negligence before their removal is authorized, Princeton University may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor. CLAUSE C15 NOISE

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

Time is Money Join Law Insider Premium to draft better contracts faster.