Product Water Delivery Ramp-Up Period Sample Clauses

Product Water Delivery Ramp-Up Period. Without limiting the BWS’s rights under subsections (G) (BWS Right to Adjust the Water Delivery Guarantee) and (H) (Extraordinary Flow Rate Change) of this Section with respect to Flow Rate adjustments, the BWS intends to begin the introduction of Product Water into the BWS Water System at the start of the Operation Period with a ramp-up of the Flow Rate from the Facility to monitor and assess if the Product Water is causing any material change to the quality of the water in the BWS Water System or in BWS’s customers’ uses or is likely to cause detrimental impacts to the BWS Water System or customers’ assets, as further described in Schedule 11 (General Operations and Maintenance Requirements). The DBOM Contractor shall coordinate with the BWS during such ramp-up period to adjust the Flow Rate for Product Water as directed by the Board of Water Supply, City and County of Honolulu Kalaeloa Seawater Desalination Facility Design-Build-Operate-Maintain Project Service Agreement Article 12 - Performance ​ BWS in accordance with Schedule 11 (General Operations and Maintenance Requirements) and this subsection. For purposes of determining the Chemicals Element payable pursuant to Section 15.4 (Fixed Component), adjustments of the Flow Rate directed by the BWS during the ramp-up period pursuant to this subsection shall be treated as if such adjustments are being made pursuant to subsection (G) (BWS Right to Adjust the Water Delivery Guarantee) of this Section.
AutoNDA by SimpleDocs

Related to Product Water Delivery Ramp-Up Period

  • Delivery Location The Aircraft shall be located at the agreed Delivery Location;

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Delivery Schedule The scheduled months of delivery of the Aircraft are listed in the attached Table 1. Exhibit B describes certain responsibilities for both Customer and Boeing in order to accomplish the delivery of the Aircraft.

  • Warranty Period The warranties set forth in Clauses 12.1.1 and 12.1.2 shall be limited to those defects that become apparent within **** after Delivery of the affected Aircraft (the “Warranty Period”).

  • Supplier Selection If Customer selects a seat or galley supplier that is not on the Boeing recommended list, such seat or galley will become BFE and the provisions of Exhibit A, Buyer Furnished Equipment Provisions Document, of the AGTA will apply.

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Delivery Pressure Seller shall be required to deliver or cause delivery of the Gas to the Point of Delivery and for delivering such Gas at a pressure sufficient to effect such delivery. Notwithstanding anything to the contrary herein, Seller shall have the right but not the obligation to install compression to effect deliveries of Gas hereunder.

  • Designated Equipment; Designated Locations The System and the Data Access Services shall be used and accessed solely on and through the Designated Configuration at the offices of the Fund or the Fund Accountants in Xxxxxxxxx, Xxxxxxxx xx Xxxxxx Xxxxx, Xxxxxxxx (“Designated Locations”).

  • Benchmark Unavailability Period Upon the Borrower’s receipt of notice of the commencement of a Benchmark Unavailability Period, the Borrower may revoke any pending request for a SOFR Borrowing of, conversion to or continuation of SOFR Loans to be made, converted or continued during any Benchmark Unavailability Period and, failing that, the Borrower will be deemed to have converted any such request into a request for a Borrowing of or conversion to Base Rate Loans. During a Benchmark Unavailability Period or at any time that a tenor for the then-current Benchmark is not an Available Tenor, the component of Base Rate based upon the then-current Benchmark or such tenor for such Benchmark, as applicable, will not be used in any determination of Base Rate.

Time is Money Join Law Insider Premium to draft better contracts faster.