Design of the Off-Site Electrical Facilities Sample Clauses

Design of the Off-Site Electrical Facilities. Within sixty (60) days of the execution of this Annexation Agreement, the City in cooperation with the Developer and the Developer’s engineer’s shall at Developer’s sole expense (i) design or cause the design of the off-site extension of the City Electrical System to serve the intended development thereon (the “Off-Site Electric System”), which includes but is not limited to poles, conduits, pull boxes, switch gear, primary wiring and electrical transformer, and (ii) as soon as reasonably practicable thereafter, issue, or cause to be issued, all necessary permits for the construction of same.
AutoNDA by SimpleDocs

Related to Design of the Off-Site Electrical Facilities

  • Toilet Facilities The Employer provides the Contractor access to toilet facilities. Temporary chemical toilets are provided by the Contractor where deemed necessary.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Laundry Facilities SF State University assumes no responsibility in the use of laundry equipment or for lost items.

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • Network Facilities At the time of termination, the Transmission Provider and the Interconnected Entities shall keep in place any portion of the Interconnection Facilities that the Transmission Provider deems necessary for the safety, integrity and/or reliability of the Transmission System. Otherwise, Transmission Provider may, in its discretion, within 30 days following termination of Interconnection Service, require the removal of all or any part of the Interconnection Facilities.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • CONSTRUCTION OF THE BUS TERMINAL 12.1 Obligations prior to commencement of construction Prior to commencement of Construction Works, the Concessionaire shall:

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Parking Facilities Alamo Colleges District shall make the existing parking facilities at the rented Facility available for the vehicular traffic and parking necessitated by the Organization’s Use of the rented Facility, on a non-exclusive basis, as specified at Exhibit A. MAXIMUM CAPACITY. Organization anticipates approximately the number of participants stated at Exhibit A and agrees to inform Alamo Colleges District of any significant changes five (5) business days in advance of a Use. Organization shall not admit a larger number of persons than can safely and freely move about the Facility. Alamo Colleges District shall notify Organization of the recommended capacity of the Facility and all decisions of Alamo Colleges District concerning questions arising under this Paragraph shall be final.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

Time is Money Join Law Insider Premium to draft better contracts faster.