Changes in Operation and Maintenance Standards Sample Clauses

Changes in Operation and Maintenance Standards. 5.2.2.1 The Department shall have the right to adopt at any time, and Developer acknowledges it must comply with, all changes and additions to, and replacements of, the Technical Volumes relating to the O&M Work. Without limiting the foregoing, the Parties anticipate that from time to time after the Effective Date, the Department will adopt Non-Discriminatory O&M Changes that will apply to the O&M Work. Developer shall be responsible for keeping itself informed of any Non- Discriminatory O&M Changes to the Manuals and Guidelines. For any other changed, added or replacement standards, criteria, requirements, conditions, procedures, specifications and other provisions to the Technical Volumes, the Department shall provide written notice to Developer, whereupon they shall constitute amendments, and become part, of the Technical Volumes. Non-Discriminatory O&M Changes that encompass matters that are addressed in the Technical Volumes as of the Effective Date shall replace and supersede inconsistent provisions of such Technical Volumes.
AutoNDA by SimpleDocs

Related to Changes in Operation and Maintenance Standards

  • Operation and Maintenance 17.1 O&M obligations of the Concessionaire

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

  • Maintenance Standards Unless otherwise authorized by the CRC Board, the General Manager shall prepare and submit to the CRC Board proposals (including the Program Maintenance plan submitted pursuant to Section 5(b)) for the performance of such Routine Maintenance and Program Maintenance as is reasonably necessary to keep and maintain the Shared Assets substantially in their condition as of the date of this Agreement. If the CRC Board fails either to approve or disapprove by majority vote any such proposal within 45 days after it was submitted to the CRC Board, the disagreement over the propriety or need for any of the Routine Maintenance or Program Maintenance included in such proposal may be submitted by either Operator for resolution by binding arbitration pursuant to Section 13.

  • Operations and Maintenance Pursuant to Section 10.5 of this Agreement, Developer shall pay the reasonable expenses (including overheads) for the operation, maintenance, repair and replacement of Transmission Owner’s Attachment Facilities and incremental operating and maintenance expenses incurred in association with System Upgrade Facilities, if and to the extent provided for under Attachment S. For Transmission Owner’s Attachment Facilities, such expenses are calculated as follows:

  • MONITORING OF OPERATION AND MAINTENANCE 19.1 Monthly status reports During Operation Period, the Concessionaire shall, no later than 7 (seven) days after the close of each month, furnish to the Authority and the Independent Engineer a monthly report stating in reasonable detail the condition of the Bus Terminal including its compliance or otherwise with the Maintenance Requirements, Maintenance Manual, Maintenance Programme and Safety Requirements, and shall promptly give such other relevant information as may be required by the Independent Engineer. In particular, such report shall separately identify and state in reasonable detail the defects and deficiencies that require rectification.

  • General Maintenance The LLC will establish and maintain a Capital Account for each Member. A Member’s Capital Account balance (“Capital Account Balance”) will be:

  • Operating and Maintenance Manuals 58.1 If “as built” Drawings and/or operating and maintenance manuals are required, the Contractor shall supply them by the dates stated in the Contract Data.

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.

  • Support and Maintenance Services Information about Teradici’s support and maintenance for the Licensed Product may be found at xxxxx://xxxx.xxxxxxxx.xxx.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.