Blowout and Fire Hazards Sample Clauses

Blowout and Fire Hazards. (a) The CONTRACTOR shall maintain certification of well control equipment and shall maintain said equipment in good operating condition during operations hereunder, and shall use all reasonable means to prevent fire or blowout and to protect the WELL. The CONTRACTOR shall deploy the blowout prevention equipment as instructed by the OPERATOR on all strings of casing during the DRILLING SERVICES and shall keep and maintain such equipment in good operating condition. The CONTRACTOR shall examine and test all blowout prevention devices in accordance with OPERATOR'S instructions and OPERATOR'S approved test procedures.
AutoNDA by SimpleDocs
Blowout and Fire Hazards. (a) Periodic Maintenance and Inspection of the subsea well control system components shall be conducted at least every five years in accordance with API 53, 4th edition, Nov 2012. Contractor shall provide evidence of original equipment manufacturer certification (OEM) and/or independent third party re-certification of subsea BOP stacks and other well control equipment, within the last five years in order to verify and document that the well control equipment’s condition and properties are within the specified acceptance criteria, specific recognised codes and standards including but not limited to API 53. Contractor shall maintain certification of well control equipment and shall maintain said equipment in good operating condition during the Term, and shall use all reasonable means to prevent fire or blowout and to protect the Well. Contractor shall deploy the BOP equipment as instructed by Operator on all strings of casing during the Drilling Services and shall keep and maintain such equipment in good operating condition in accordance with manufacturers’ requirements. Contractor shall examine and test all blowout prevention devices in accordance with Operator’s instructions and Operator’s approved test procedures. Test results shall be noted on the relevant test report sheets in addition to the approved IADC-API Daily Drilling Reporting system. The BOP annular rubbers shall be inspected by an Operator provided independent Third Party or supplier to a minimum API 53 standard prior to the Commencement Date. In the event that the inspection is satisfactory the BOP shall be tested to close on a 3.1/2” drill pipe effectively. If the test is satisfactory the BOP shall be deemed to be accepted. If it fails the test then the replacement parts are to Contractor’s account. All BOP actions resulting from the BOP inspection must be closed out to the satisfaction of Operator and Contractor prior to every deployment. Electronic and/or hard copies of all applicable standards and specifications, relative to the well control equipment shall be readily available. Drawings showing ram space out and bore of the BOP stack and drawing of the choke manifold showing the pressure rating of the components shall be posted on the rig floor and maintained up to date. A P&ID of the BOP control system shall be maintained on file at the rig. In the event that BOP is used for non-routine work during the Contract, i.e. well control, stripping through, then Operator shall pay for replaceme...
Blowout and Fire Hazards. (a) The CONTRACTOR shall maintain certification of well control equipment and shall maintain said equipment in good operating condition during operations hereunder, and shall use all reasonable means to prevent fire or blowout and to protect the WELL. The CONTRACTOR shall deploy the blowout prevention equipment as instructed by the OPERATOR on all strings of casing during the DRILLING SERVICES and shall keep and maintain such equipment in good operating condition. The CONTRACTOR shall examine and test all blowout prevention devices in accordance with OPERATOR'S instructions and OPERATOR'S approved test procedures. Test results shall be noted on the relevant test report sheets in addition to the IADC-API Daily Drilling Report Form. The BOP stack and rubbers shall be inspected by an independent third party or supplier prior to the COMMENCEMENT DATE. In the event that the inspection is satisfactory the BOP shall be tested to close on a 3 1/2" drill pipe effectively. If the test is satisfactory the BOP shall be deemed to be accepted. If it fails the test then the replacement parts are to CONTRACTOR'S account.

Related to Blowout and Fire Hazards

  • Hazards The Tenant shall not undertake, or permit his/her family or guests to undertake, any hazardous acts or do anything that will increase the project's insurance premiums. Such action constitutes a material non-compliance. If the unit is damaged by fire, wind, or rain to the extent that the unit cannot be lived in and the damage is not caused or made worse by the Tenant, the Tenant will be responsible for rent only up to the date of the destruction. Additional rent will not accrue until the unit has been repaired to a livable condition.

  • Environmental Hazards (a) Except for matters described in Section 18(b), Borrower shall not cause or permit any of the following:

  • Insurance, Subcontractor's Public Liability and Property Damage The Contractor shall require each of its subcontractors to secure and maintain during the life of the subcontract, insurance of the type specified in this Contract, or, the Contractor may insure the activities of its subcontractors in the Contractor’s policy, as specified in this Contract.

  • Insurance and Fingerprint Requirements Information Insurance If applicable and your staff will be on TIPS member premises for delivery, training or installation etc. and/or with an automobile, you must carry automobile insurance as required by law. You may be asked to provide proof of insurance. Fingerprint It is possible that a vendor may be subject to Chapter 22 of the Texas Education Code. The Texas Education Code, Chapter 22, Section 22.0834. Statutory language may be found at: xxxx://xxx.xxxxxxxx.xxxxx.xxxxx.xx.xx/ If the vendor has staff that meet both of these criterion: (1) will have continuing duties related to the contracted services; and (2) has or will have direct contact with students Then you have ”covered” employees for purposes of completing the attached form. TIPS recommends all vendors consult their legal counsel for guidance in compliance with this law. If you have questions on how to comply, see below. If you have questions on compliance with this code section, contact the Texas Department of Public Safety Non-Criminal Justice Unit, Access and Dissemination Bureau, FAST-FACT at XXXX@xxxxx.xxxxx.xx.xx and you should send an email identifying you as a contractor to a Texas Independent School District or ESC Region 8 and TIPS. Texas DPS phone number is (000) 000-0000. See form in the next attribute to complete entitled: Texas Education Code Chapter 22 Contractor Certification for Contractor Employees

  • Fixtures and Fittings 16.1 The property is sold together with any buildings or other improvements thereon and to the extent as it lies. Upon the same terms and conditions ventilated in clause 7 above (which terms are incorporated herein by reference, but appropriately adapted to what is pertinently described herein), neither the Seller nor the Property Practitioner assume any liability in respect of the condition, usability, serviceability or possible state of disrepair of any of the buildings or improvements thereon, nor in respect of any of the fixtures and fittings therein, including stoves and whatever assets are sold in terms of this agreement, all of it in the condition as it currently lies.

  • Standard Hazard and Flood Insurance Policies For each Mortgage Loan (other than a Cooperative Loan), the Master Servicer shall maintain, or cause to be maintained by each Servicer, standard fire and casualty insurance and, where applicable, flood insurance, all in accordance with the provisions of this Agreement and the related Servicing Agreement, as applicable. It is understood and agreed that such insurance shall be with insurers meeting the eligibility requirements set forth in the applicable Servicing Agreement and that no earthquake or other additional insurance is to be required of any Mortgagor or to be maintained on property acquired in respect of a defaulted loan, other than pursuant to such applicable laws and regulations as shall at any time be in force and as shall require such additional insurance. Pursuant to Section 4.01, any amounts collected by the Master Servicer, or by any Servicer, under any insurance policies maintained pursuant to this Section 9.16 or any Servicing Agreement (other than amounts to be applied to the restoration or repair of the property subject to the related Mortgage or released to the Mortgagor in accordance with the applicable Servicing Agreement) shall be deposited into the Collection Account, subject to withdrawal pursuant to Section 4.02. Any cost incurred by the Master Servicer or any Servicer in maintaining any such insurance if the Mortgagor defaults in its obligation to do so shall be added to the amount owing under the Mortgage Loan where the terms of the Mortgage Loan so permit; provided, however, that the addition of any such cost shall not be taken into account for purposes of calculating the distributions to be made to Certificateholders and shall be recoverable by the Master Servicer or such Servicer pursuant to Section 4.02.

  • Nuclear Hazard This Exclusion 7. pertains to Nuclear Hazard to the extent set forth in M. Nuclear Hazard Clause under Section I – Conditions.

  • Windstorm or hail This peril does not include loss to the property contained in a building caused by rain, snow, sleet, sand or dust unless the direct force of wind or hail damages the building causing an opening in a roof or wall and the rain, snow, sleet, sand or dust enters through this opening. This peril includes loss to watercraft and their trailers, furnishings, equipment, and outboard engines or motors, only while inside a fully enclosed building.

  • Contractor’s Pollution Liability Insurance If specified in Schedule A, the Contractor shall maintain, or cause the Subcontractor doing such Work to maintain, Contractors Pollution Liability Insurance covering bodily injury and property damage. Such insurance shall provide coverage for actual, alleged or threatened emission, discharge, dispersal, seepage, release or escape of pollutants (including asbestos), including any loss, cost or expense incurred as a result of any cleanup of pollutants (including asbestos) or in the investigation, settlement or defense of any claim, action, or proceedings arising from the operations under this Contract. Such insurance shall be in the Contractor’s name and list the City as an Additional Insured and any other entity specified in Schedule A. Coverage shall include, without limitation, (a) loss of use of damaged property or of property that has not been physically injured, (b) transportation, and (c) non-owned disposal sites.

  • Flood If any of the Improvements are located in an area identified by the Federal Emergency Management Agency (or any successor to that agency) as a “Special Flood Hazard Area,” flood Insurance in the amount required by Lender.

Time is Money Join Law Insider Premium to draft better contracts faster.