Base Energy Rates Sample Clauses

Base Energy Rates. EC Savings will be calculated using the Base Energy Rates or Actual Energy Rates for that meter, whichever results in greater EC Savings. Actual Energy Rates will be calculated at the end of each Measurement Period using utility billing information for that Measurement Period and using the same methodology as was employed to determine the base energy rate in the Report. The Base Energy Rates listed here are to be increased each Measurement Period on a cumulative basis by five percent (5.0%) beginning on the first anniversary of the M&V Commencement Date and continuing on the first day of each Measurement Period thereafter. Table H-5 Base Energy Rates ECM Location $ per kWh $ per Therm PV-01 Xxxx Xxxxx High School - 515 kW solar parking canopy Xxxx Xxxxx High School $0.1476 N/A PV-02 Xxxx Xxxxx High School - 116 kW solar on rooftop of Math/Science Building Xxxx Xxxxx High School $0.1476 N/A L-01 Interior and Exterior LED Lighting Upgrades All Locations (Except Auditorium Lighting) $0.1775 N/A L-02 Auditorium Lighting and Controls Upgrade Xxxx Xxxxx High School $0.1590 N/A ATTACHMENT I MAINTENANCE SERVICES EQUIPMENT AND FACILITIES COVERED Chevron Energy Solutions will perform preventive maintenance services (“Maintenance Services”) as set forth in this Attachment I with respect to Generating Facilities being constructed on Manhattan Beach USD’s property at the following Project Locations: Facility Location Xxxx Xxxxx High School 0000 Xxxxxxx Xxxx., Xxxxxxxxx Xxxxx, Xx 00000
AutoNDA by SimpleDocs
Base Energy Rates. EC Savings will be calculated using the Base Energy Rates or Actual Energy Rates for that meter, whichever results in greater EC Savings. Actual Energy Rates will be calculated at the end of each Measurement Period using utility billing information for that Measurement Period and using the same methodology as was employed to determine the base energy rate in the Recommendations. The Base Energy Rates for each Project Location and Measurement Period shall be as shown in Table E-3 below. Table E-3: Base Energy Rates Measurement Period Xxxxxx WWTP ($/kWh) Xxxxx Xxxxxx Regional WRF ($/kWh) Well 24 ($/kWh) Well 27 ($/kWh) Well 29 ($/kWh) Well 32 & Booster Station ($/kWh) Well 33 - RESBCT ($/kWh) 1 0.0948 0.0948 0.1853 0.1655 0.1132 0.1154 0.0748 2 0.1005 0.1005 0.1964 0.1754 0.1200 0.1223 0.0792 3 0.1066 0.1066 0.2082 0.1859 0.1272 0.1296 0.1321 4 0.1130 0.1130 0.2207 0.1971 0.1348 0.1374 0.1400 5 0.1197 0.1197 0.2339 0.2089 0.1429 0.1456 0.1484 6 0.1269 0.1269 0.2479 0.2215 0.1515 0.1544 0.1573 7 0.1345 0.1345 0.2628 0.2348 0.1606 0.1636 0.1668 8 0.1426 0.1426 0.2786 0.2488 0.1702 0.1735 0.1768 9 0.1512 0.1512 0.2953 0.2638 0.1804 0.1839 0.1874 10 0.1602 0.1602 0.3130 0.2796 0.1913 0.1949 0.1986 11 0.1698 0.1698 0.3318 0.2964 0.2027 0.2066 0.2106 12 0.1800 0.1800 0.3517 0.3142 0.2149 0.2190 0.2232 13 0.1908 0.1908 0.3728 0.3330 0.2278 0.2321 0.2366 14 0.2023 0.2023 0.3952 0.3530 0.2415 0.2461 0.2508 15 0.2144 0.2144 0.4189 0.3742 0.2560 0.2608 0.2658 16 0.2273 0.2273 0.4440 0.3966 0.2713 0.2765 0.2818 17 0.2409 0.2409 0.4706 0.4204 0.2876 0.2931 0.2987 18 0.2554 0.2554 0.4989 0.4456 0.3049 0.3106 0.3166 19 0.2707 0.2707 0.5288 0.4724 0.3231 0.3293 0.3356 20 0.2869 0.2869 0.5605 0.5007 0.3425 0.3490 0.3557 ATTACHMENT F MAINTENANCE SERVICES EQUIPMENT AND FACILITIES COVERED ENGIE Services U.S. will perform preventive maintenance services (“Maintenance Services”) as set forth in this Attachment F with respect to Generating Facilities being constructed on District’s property at the following Project Locations: Site Name Site Address City State Zip Code XXXXXX WWTP 00000 Xxxxxxx Xx Xxxxxx Xxx Xxxxxxx XX 00000 NEW REGIONAL PLANT 00000 Xxxxxx Xxxxxxx Xx Xxxxxx Xxx Xxxxxxx XX 00000 WELL 24 65100-1/0 Xxxxxxx Xxxx Desert Hot Springs CA 92240 WELL 27 00000 Xxxxxx Xx Xxxxxx Hot Springs CA 92240 WELL 29 00000 Xxxxxxxx Xx Xxxxxx Xxx Xxxxxxx XX 00000 WELL 32 00000 Xxxxxx Xxxxxxx Xx Xxxxxx Xxx Xxxxxxx XX 00000 WELL 33 00000 Xxxxxx Xxxxxxx Xx Xxxxxx Xxx Xxxxxxx XX 00000 Capital...
Base Energy Rates. EC Savings will be calculated using the Base Energy Rates or Actual Energy Rates for that meter, whichever results in greater EC Savings. Actual Energy Rates will be calculated at the end of each Measurement Period using utility billing information for that Measurement Period and using the same methodology as was employed to determine the base energy rate in the Recommendations. The Base Energy Rates listed here are to be increased each Measurement Period on a cumulative basis by five percent (5%) beginning on the first anniversary of the M&V Commencement Date and continuing on the first day of each Measurement Period thereafter. Table E-3: Base Energy Rates Location Electricity Rate ($/kWh) Camarillo Heights STEM Academy 0.2300 Dos Caminos ES 0.2455 La Mariposa School 0.2407 Las Colinas MS 0.2232 Las Xxxxx XX 0.2364 Los Primeros School of Sciences & Arts 0.2358 Monte Vista MS 0.2385 Pleasant Valley School of Engineering and Arts 0.2247 Rancho Xxxxx XX 0.2399 Santa Xxxx Technology Magnet School 0.2368 Tierra Xxxxx ES 0.2377 ATTACHMENT F MAINTENANCE SERVICES EQUIPMENT AND FACILITIES COVERED ENGIE Services U.S. will perform preventive maintenance services (“Maintenance Services”) as set forth in this Attachment F with respect to Generating Facilities being constructed on Pleasant Valley SD’s property at the following Project Locations: Site Name Site Address City County State Zip Code Camarillo Heights STEM Academy 00 Xxxxxxxx Xxxxx Xxxxxxxxx Xxxxxxx XX 00000 Dos Caminos Elementary School 0000 Xxxxxx Xxx Xxxxxxxxx Xxxxxxx XX 00000 La Mariposa 4800 Xxxxxx Xxxxxx Xxxxxxxxx Xxxxxxx CA 93012 Las Colinas Middle School 0000 Xxxxxxxxxx Xx. Xxxxxxxxx Xxxxxxx CA 93012 Las Xxxxx Elementary School 00 X Xxxxx Xx Xxxxxx Xxxxxxxxx Xxxxxxx CA 93010 Los Primeros School of Arts & Science 0000 Xxxxxxx Xxx Xxxxxxxxx Xxxxxxx CA 93010 Monte Vista Middle School 000 Xxxxxxx Xx. Xxxxxxxxx Xxxxxxx XX 00000 Pleasant Valley School of Engineering and Arts 000 Xxxxxx Xxx Xxxxxxxxx Xxxxxxx XX 00000 Rancho Rosal School 0000 Xxxxxxx Xxxx Xxxxxxxxx Xxxxxxx XX 00000 Santa Xxxx Technology Magnet School 00000 Xxxxx Xxxx Xx. Camarillo Ventura CA 93012 Tierra Xxxxx Elementary School 0000 Xxxxxxxxx Xx. Camarillo Ventura CA 93012 Capitalized terms used in this Attachment F and not defined in the Contract, have the meanings set forth below:
Base Energy Rates. EC Savings will be calculated using the Base Energy Rates or Actual Energy Rates for that meter, whichever results in greater EC Savings. Actual Energy Rates will be calculated at the end of each Measurement Period using utility billing information for that Measurement Period and using the same methodology as was employed to determine the base energy rate in the Recommendations. The Base Energy Rates listed here are to be increased each Measurement Period on a cumulative basis by eight percent (8%) for electricity and three percent (3%) for gas, beginning on the first anniversary of the M&V Commencement Date and continuing on the first day of each Measurement Period thereafter. Table E-7: Base Energy Rates ECM Location Electricity Rate ($/kWh) Gas Rate ($/Them) 1 Tulare LHD 0.1602 - 2 Tulare LHD 0.1464 - ATTACHMENT F MAINTENANCE SERVICES EQUIPMENT AND FACILITIES COVERED ENGIE Services U.S. will perform preventive maintenance services (“Maintenance Services”) as set forth in this Attachment F with respect to Generating Facilities being constructed on District’s property at the following Project Locations: Site Name Site Address City County State Zip Code Evolutions Gym 0000 X Xxxxxxxxxx Xxx Xxxxxx Xxxxxx XX 00000 Capitalized terms used in this Attachment F and not defined in the Contract, have the meanings set forth below:
Base Energy Rates. EC Savings will be calculated using the Base Energy Rates or Actual Energy Rates for that meter, whichever results in greater EC Savings. Actual Energy Rates will be calculated at the end of each Measurement Period using utility billing information for that Measurement Period and using the same methodology as was employed to determine the base energy rate during the Assessment. The Base Energy Rates listed here are to be increased each Measurement Period on a cumulative basis by five percent (5%) beginning on the first anniversary of the M&V Commencement Date and continuing on the first day of each Measurement Period thereafter. Table E-3: Base Energy Rates Location Electricity Rate ($/kWh) Adult Learning Center 0.2398 Xxxxxx Elementary School 0.2252 Cottonwood Creek School 0.2367 District Office 0.2275 Dublin Elementary School 0.2388 Dublin High School 0.2257 Fallon Middle School 0.2276 Xxxxxxxxxxx Elementary School 0.2329 Xxxxx Xxxxxxxxx Elementary School 0.2379 Xxxx Xxxxx Elementary School 0.2433 Xxxx Elementary School 0.2367 Xxxxxx Elementary School 0.2336 Xxxxx Middle School 0.2278 ATTACHMENT F MAINTENANCE SERVICES

Related to Base Energy Rates

  • Hourly Rates Effective: January 1, 2015 CLASSIFICATION FULL-TIME EMPLOYEES PART-TIME EMPLOYEES Base 14% benefit HOURLY Base 14% benefit HOURLY Base 14% benefit HOURLY Start Rate 6 months 1 year Start Rate in lieu Start Rate 920 hrs in lieu 920 hrs 1840 hrs in lieu 1840 hrs Food Service Worker 19.94 20.08 20.37 Reg 19.94 2.79 22.73 20.08 2.81 22.89 20.37 2.85 23.22 29.91 30.12 30.56 OT 32.70 32.93 33.41 Laundry Aide 19.38 19.53 19.82 Reg 19.38 2.71 22.09 19.53 2.73 22.26 19.82 2.77 22.59 29.07 29.30 29.73 OT 31.78 32.03 32.50 Housekeeping Aide 20.72 20.87 21.01 Reg 20.72 2.90 23.62 20.87 2.92 23.79 21.01 2.94 23.95 31.08 31.31 31.52 OT 33.98 34.23 34.46 Health Care Aide 20.72 20.87 21.01 Reg 20.72 2.90 23.62 20.87 2.92 23.79 21.01 2.94 23.95 31.08 31.31 31.52 OT 33.98 34.23 34.46 Clothing Clerk 20.72 20.87 21.01 Reg 20.72 2.90 23.62 20.87 2.92 23.79 21.01 2.94 23.95 31.08 31.31 31.52 OT 33.98 34.23 34.46 Xxxx 21.48 21.63 21.77 Reg 21.48 3.01 24.49 21.63 3.03 24.66 21.77 3.05 24.82 32.22 32.45 32.66 OT 35.23 35.48 35.71 R.P.N. 25.21 25.39 25.59 Reg 25.21 3.53 28.74 25.39 3.55 28.94 25.59 3.58 29.17 37.82 38.09 38.39 OT 41.35 41.64 41.97 Rehabilitation Assistant 21.31 21.41 21.63 Reg 21.31 2.98 24.29 21.41 3.00 24.41 21.63 3.03 24.66 31.97 32.12 32.45 OT 34.95 35.12 35.48 Maintenance Person 20.72 20.87 21.01 Reg 20.72 2.90 23.62 20.87 2.92 23.79 21.01 2.94 23.95 31.08 31.31 31.52 OT 33.98 34.23 34.46 P1 Plumber 0.00 0.00 26.01 Reg 26.01 3.64 29.65 39.02 OT 42.66 Recreation Programmer 21.43 21.55 21.76 Reg 21.43 3.00 24.43 21.55 3.02 24.57 21.76 3.05 24.81 32.15 32.33 32.64 OT 35.15 35.35 35.69 Notes: - Part-time hourly rate = full-time rate plus 14% -Part-time overtime rate = 1/2 full-time rate plus part-time hourly rate COUNTY OF RENFREW

  • MWBE Utilization Plan A. In accordance with 5 NYCRR § 142.4, Bidders are required to submit a completed Utilization Plan on Form MWBE 100 with their bid.

  • Overhead Rates The Engineer shall use the provisional overhead rate indicated in Attachment E. If a periodic escalation of the provisional overhead rate is specified in Attachment E, the effective date of the revised provisional overhead rate must be included. For lump sum contracts, the overhead rate remains unchanged for the entire contract period.

  • Service Rates The rates for services provided to a specific child by the Provider shall be set forth in the PSO for the child. The Provider may not increase the rate for any service described in a PSO during the term of the PSO unless the PSO provides for an automatic rate increase option, in which case the rate may only be increased in the initial month of the Buyer’s fiscal year and must be agreed to in writing by the Buyer. The provider is required to have all services and rate information entered and up-to-date in the Service Fee Directory by the beginning of the contract year. The Provider shall provide to the Buyer written notice of any planned rate increase (90 days) prior to the initial month of the Buyer’s next fiscal year. Such written notice shall contain the justification for the increase and shall be submitted in triplicate to the Buyer’s Children’s Services Act Manager.

  • Hourly Rate (A) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the contract by the number of direct labor hours performed. Fractional parts of an hour shall be payable on a prorated basis.

  • Pay Rates Unit members must have been on an active status for a minimum of six

Time is Money Join Law Insider Premium to draft better contracts faster.