Relevant Construction Event definition

Relevant Construction Event means a Construction Event:
Relevant Construction Event means a Construction Event: (a) of which no Producer acting in accordance with a reasonable and prudent standard and having made all due and careful enquiries would have been aware, and of which the Producer was not aware, at the Agreement Date; and (b) which renders the development, completion, construction, conversion, installation or commissioning of the Facility to meet the Installed Capacity Estimate uneconomic. Required Authorisation means, in relation to each Party and at any time, each authorisation, licence, accreditation, permit, consent, certificate, resolution, clearance, exemption, order confirmation, permission or other approval of or from any competent authority required at such time to enable the relevant Party to perform and comply with its obligations under the LCHA and the other LCHA documents and, in the case of the Producer, for the Project.

Examples of Relevant Construction Event in a sentence

  • The parts of the CFD which are relevant to this guidance are the definitions of “Installed Capacity”, “Initial Installed Capacity Estimate”, “Installed Capacity Estimate”, “Final Installed Capacity” and Conditions 5, 6 and 7 (Adjustments to Installed Capacity Estimate: Relevant Construction Event, Adjustments to Installed Capacity Estimate: Permitted reduction and Final Installed Capacity; Maximum Contract Capacity).

  • Please refer to Conditions 5 and 6 of the Conditions (Adjustments to Installed Capacity Estimate: Relevant Construction Event and Adjustments to Installed Capacity Estimate: Permitted reduction).

  • For example, the IC cannot be less than the Required Installed Capacity (“ RIC”) due to the Generator not having sufficient transmission or distribution capacity (adjustments to the ICE are limited to those related to Permitted reduction and Relevant Construction Event (“RCE”) – see sections 4 and 5 below).

  • This strategy included a didactic letter for its operationalization at local levels and was directed to the reduction of breeding sites for mosquitoes and Dengue cases. In addition, there were technical and financial contributions for the design, development and reproduction of information and education materials in fighting the Dengue epidemic. Due to tropical storm Ida, a number of shelters were enabled, with a majority of the refugees being women and children.

  • Any RCE Notice shall be irrevocable and, if the Installed Capacity Estimate is reduced pursuant to this Condition 555 (Adjustment to Installed Capacity Estimate: Relevant Construction Event), the Generator may not subsequently increase the Installed Capacity Estimate.

  • If a Generator considers a Relevant Construction Event has occurred it must give LCCC a notice (an “ RCE Notice”), at least three months before the Longstop Date (the “RCE Deadline”).

  • No adjustment to the Strike Price shall be made solely as a result of a reduction to the Installed Capacity Estimate pursuant to this Condition 555 (Adjustment to Installed Capacity Estimate: Relevant Construction Event).

  • Thus, in order to include B in our discussion of element depletions in Sec- tion 5.1, we derive the relevant parameters here.

  • Executive shall give the Executive’s Notice as soon as practicable, but no later than the earlier of (i) 10 business days after Executive first obtains actual knowledge of such IRS Claim or (ii) five business days before the IRS Claim Deadline; provided, however, that any failure to give such Executive’s Notice shall affect the Company’s obligations under this Article only to the extent that the Company is actually prejudiced by such failure.

  • This guidance document has been prepared by Low Carbon Contracts Company Ltd (" LCCC") to support Generators in delivering the requirements of the Contract for Difference ("CFD") (which is comprised of the CFD Standard Terms and Conditions and the CFD Agreement, as published by the Department of Energy & Climate Change on 29 August 2014), specifically in relation to a Relevant Construction Event (“RCE”).

Related to Relevant Construction Event

  • Original construction ’ shall mean the first or initial construction

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the project, and (ii) the cumulative payments made by the developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • FX Disruption Event ' means the occurrence of any event on any day or any number of consecutive days as determined by the Calculation Agent in its sole and reasonable discretion that affects the Issuer’s currency hedging (if any) with respect to the Products.

  • Application Event means the occurrence of (a) a failure by Borrowers to repay all of the Obligations in full on the Maturity Date, or (b) an Event of Default and the election by Agent or the Required Lenders to require that payments and proceeds of Collateral be applied pursuant to Section 2.4(b)(iii) of this Agreement.

  • Construction Period means the period commencing from the Appointed Date and ending on the date of the Completion Certificate;

  • Loan Event of Default means any of the events specified in Section 5.1 of the Loan Agreement, provided that any requirement for the giving of notice, the lapse of time, or both, or any other condition, event or act has been satisfied.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Foreign construction material means a construction material other than a domestic construction material.