Installed Capacity Estimate definition

Installed Capacity Estimate means the Generator’s estimate of the Installed Capacity from time to time, being the Initial Installed Capacity Estimate as may be adjusted pursuant to Condition 5 (Adjustment to Installed Capacity Estimate: Relevant Construction Event), Condition 6 (Adjustment to Installed Capacity Estimate: Permitted reduction) and Clause 6.5 (Turbine reallocation);
Installed Capacity Estimate means the Generator's estimate of the Installed Capacity from time to time, being the Initial Installed Capacity Estimate as may be adjusted pursuant to Condition 5 (Adjustment to Installed Capacity Estimate: Relevant Construction Event), Condition 6 4 Drafting note: This shall be either (a) the capacity notified by the Delivery Body in the Generator’s FiT CfD Application as the capacity in megawatts, or (b) if the Allocation Round in which the Generator is participating requires them to submit a sealed bid, then the capacity for which successful allocation has taken place under the Allocation Round.
Installed Capacity Estimate means the Generator’s estimate of the Installed Capacity from time to time, being

Examples of Installed Capacity Estimate in a sentence

  • A reference to capacity means the Initial Installed Capacity Estimate (IICE).

  • The parts of the CFD which are relevant to this guidance are the definitions of “Installed Capacity”, “Initial Installed Capacity Estimate”, “Installed Capacity Estimate”, “Final Installed Capacity” and Conditions 5, 6 and 7 (Adjustments to Installed Capacity Estimate: Relevant Construction Event, Adjustments to Installed Capacity Estimate: Permitted reduction and Final Installed Capacity; Maximum Contract Capacity).

  • Please refer to Conditions 5 and 6 of the Conditions (Adjustments to Installed Capacity Estimate: Relevant Construction Event and Adjustments to Installed Capacity Estimate: Permitted reduction).

  • By the MDD projects are permitted up to a 25% reduction, which then becomes the Installed Capacity Estimate (ICE).

  • Once the RCE Supporting Information is received, LCCC will review it and respond to the Generator within ten (10) Business Days, specifying whether LCCC considers that an RCE has or has not happened and whether LCCC accepts or does not accept the RCE-Adjusted Installed Capacity Estimate (a “ Further RCE Response Notice”).

  • This guidance has been prepared by Low Carbon Contracts Company Ltd (“ LCCC”) to support Generators in delivering the requirements of the Contract for Difference (“CFD”), specifically regarding the Installed Capacity (“IC”), the Initial Installed Capacity Estimate (“IICE”), Installed Capacity Estimate (“ICE”) and the Final Installed Capacity (“FIC”).

  • For both delivery and operations, the CfD has strict requirements around the capacity of a project.Delivery of capacityThe CfD sets out clear requirements on the delivery of the Initial Installed Capacity Estimate (IICE), with the aim to ensure that capacity is achieved in line with budget allocation.

  • Condition 6 “Adjustments to Installed Capacity Estimate: Permitted reduction” sets out the process to reduce the IC by giving notice (the “ ICE Adjustment Notice”) prior to the Milestone Delivery Date (“MDD”) where the Generator considers that the IC will be lower than the IICE.

  • An onshore Facility with an Initial Installed Capacity Estimate (“IICE”) of 160 MW has before the Milestone Delivery Date (“MDD”) adjusted the Installed Capacity Estimate (“ICE”) to 120 MW (the Revised ICE).Consequentially, the Required Installed Capacity (“RIC”) is 114MW, being 95% of the Revised ICE.

  • This strategy included a didactic letter for its operationalization at local levels and was directed to the reduction of breeding sites for mosquitoes and Dengue cases. In addition, there were technical and financial contributions for the design, development and reproduction of information and education materials in fighting the Dengue epidemic. Due to tropical storm Ida, a number of shelters were enabled, with a majority of the refugees being women and children.


More Definitions of Installed Capacity Estimate

Installed Capacity Estimate means the Generator's estimate of the Installed Capacity from time to time, being 4 Drafting note: This shall be either (a) the capacity notified by the Delivery Body in the Generator’s FiT CfD Application as the capacity in megawatts, or (b) if the Allocation Round in which the Generator is participating requires them to submit a sealed bid, then the capacity for which successful allocation has taken place under the Allocation Round.
Installed Capacity Estimate means the Producer’s estimate of the Installed Capacity from time to time, being the Initial Installed Capacity Estimate as may be adjusted pursuant to the occurrence of any Relevant Construction Event and/or permitted reduction.

Related to Installed Capacity Estimate

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Contract Capacity has the meaning set forth in Section 3.1(f).

  • Nameplate capacity means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the United States Department of Energy standards.

  • Power Plant means a facility for the generation of

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.