Examples of Project Meeting in a sentence
Project Schedule progress updates shall be provided at each bi-monthly Project Meeting and the Project Schedule progress updates submitted at these meetings are not to be considered as Project Schedule revisions or as a submittal for a Project Schedule revision.
Work accomplished since the previous Project Meeting, off-site fabrication problems, product delivery problems, proposed changes, and other circumstances which might delay progress of the Work.
Safety Committee’s weekly report must be submitted to the Project Controller in every Project Meeting.
As a result of these meetings the Contractor shall generate IT Project Meeting Minutes and Action Items (CDRL A002) C.3.1.3 The Contractor shall operate standardized, compliant, secure and optimized networks, workstations, applications and computing infrastructure, including maintenance scheduling, routine user interface and support, engineering and logistics, configuration management, security compliance and overall Information Technology project management support.
The minimum Project Meeting and Preconstruction Conference agenda requirements are detailed below.
Post copies in the Project Meeting Room and temporary field office.
Weekly Project Meeting and Look-Ahead Schedule: At the weekly project meetings, the contractor shall provide the Engineer with a detailed, Look-Ahead Schedule.
Present item or items requiring clarification/verification at Project Meeting for discussion.
If it is determined that item or items do not require RFI submittals, the Engineer shall include the determination of the clarification/verification within the Project Meeting Report.
A final goal, as included by Mr. Miller in his notes, was to determine: “How far can we take this project legally to deny it?” 407 BLM Follow-Up Notes from Imperial Project Meeting of February 22 and 23, 1999 at 1 (Feb.25, 1999) [Ex. 183].408 See BLM Notes from Imperial Project Meeting of February 22 and 23, at 1 (Feb.