Examples of On-Site Management in a sentence
Full Time On-Site Project Management Staff Full/Part Time On-Site Management Staff Project Manager(s) Project Executive Assistant Project Manager(s) Commissioning Coordinator Superintendent(s) CPM Scheduler Assistant Superintendent(s) Quality Control Managers Safety Coordinator/Assistant(s) Cost Estimator(s) / Change / Data Mgmt.
The FSMC met criteria: Experience of On-Site Management Company Staff.
Eligible uses of O&M subsidy include operating expenses for: • On-Site Management: Operations and maintenance costs directly associated with operating the building.
For On-Site Management, Aramark’s proposed candidate stood out as being the strongest.
Complete the following training in accordance with the reference citations: Hazardous Material Specialist (Reference 29 CFR 1910.120(q)(6)(iv)), On-Site Management and Supervisor (Reference 29 CFR 1910.120(e)(4)), and the On-Scene Incident Commander (Reference 29 CFR 1910.120(q)(6)(v)).
On-Site Management Office Hours: • The Amenities Center is staffed Monday through Friday.
They would have previously received First Responder Operations level training.The On-Site Management and Supervisory training to which you refer is intended for on-site management personnel who are directly responsible for clean-up operations.
B.3.1.2 On-Site Management Provide and maintain a fully equipped office on-site to perform all required Design- Builder duties. Maintain full-time, on-site construction supervision and provide daily inspections, quality control, monitoring, coordination of various trades, record drawings, and daily work log. Provide general safety and signage and posting for the project and see that each subcontractor prepares and submits adequate safety program and monitoring throughout the project.
Is it necessary for our plant management to be trained as "On-Site Management and Supervisors" if their involvement is telling the contractor to "clean up the problem?"These management personnel would be responsible for arranging the contract, monitoring contract expenditures and monitoring procedures followed by the contractor to insure general compliance with OSHA and other regulations.
A copy of any material to be distributed or posted shall be filed with the On-Site Management Office at the same time it is distributed or posted, or the closest preceding weekday if distribution or posting is planned for a weekend.