System Protection and Other Control Requirements Sample Clauses

System Protection and Other Control Requirements. Developer shall provide, install and test relay protection systems at the Merchant Transmission Facility to interface with those systems installed by Connecting Transmission Owner at the West 49th Street Substation.
AutoNDA by SimpleDocs
System Protection and Other Control Requirements. The Connecting Transmission Owner shall provide, install and test relay protection systems associated with the control and protection of the transmission expansion to interface with those systems installed by Connecting Transmission Owner at the 345 kV Ramapo Facility. SERVICE AGREEMENT NO. 2216 APPENDIX D SECURITY ARRANGEMENTS Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. SERVICE AGREEMENT NO. 0000 XXXXXXXX X COMMERCIAL OPERATION DATE Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Re: 345kV Ramapo Interconnection Dear __________________: On [Date] Orange and Rockland Utilities, Inc. has completed Trial Operation. This letter confirms that O&R commenced Commercial Operation of the Transmission Facility, effective as of [Date plus one day]. Thank you. [Signature] Orange and Rockland Utilities, Inc. 000 Xxxx Xxxxx 00 Xxxxxx Xxxxxx, XX 00000 E-1 SERVICE AGREEMENT NO. 2216 APPENDIX F ADDRESSES FOR DELIVERY OF NOTICES AND XXXXXXXX
System Protection and Other Control Requirements. Developer shall provide, install and test relay protection systems associated with the control and protection of the transmission expansion to interface with those systems installed by Connecting Transmission Owner at the Astoria Annex345kV GIS Substation.
System Protection and Other Control Requirements. 9.7.4.1 System Protection Facilities 9.7.4.2 9.7.4.3 9.7.4.4 9.7.4.5 9.7.4.6
System Protection and Other Control Requirements. For the requirements under Article 9.7.4, the Interconnection Customer shall design and operate the Large Generating Facility in accordance with this LGIA and the ANPP Switchyard Hassayampa Interconnection Agreement, and in the event of a conflict shall follow the higher standard set by either agreement. In the event of a conflict, the Parties and SRP shall use Good Utility Practice and Reasonable Efforts to reach a mutual understanding to resolve the issue.
System Protection and Other Control Requirements. The Parties acknowledge and agree that certain Interconnection Customer System Protection Facilities have been installed and are in service as of the Effective Date and that all provisions of this Article 9.7.4, excluding design- and installation-related provisions, shall apply to such System Protection Facilities. To the extent that System Protection Facilities are installed after the Effective Date, the provisions of this Article 9.7.4 shall fully apply to such System Protection Facilities.
System Protection and Other Control Requirements. 9.6.4.1 Reserved.
AutoNDA by SimpleDocs
System Protection and Other Control Requirements. This Interconnection Agreement does not require the installation of any additional system protection or other control equipment. APPENDIX D SECURITY ARRANGEMENTS Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. APPENDIX E COMMERCIAL OPERATION DATE Orange and Rockland Utilities, Inc. 000 Xxxx Xxxxx 00 Xxxxxx Xxxxxx, Xxx Xxxx 00000 Attn. Vice President-Operations Re: Sugarloaf Interconnection Dear : On [Date] Consolidated Edison Company of New York, Inc. has completed Trial Operation. This letter confirms that Con Edison commenced Commercial Operation of the Transmission Facility, effective as of [Date plus one day]. Thank you. [Signature] APPENDIX F ADDRESSES FOR DELIVERY OF NOTICES AND XXXXXXXX
System Protection and Other Control Requirements. FERC Electric Tariff Generator Interconnection Agreement (GIA) ATTACHMENTS 92.0.0
System Protection and Other Control Requirements 
Time is Money Join Law Insider Premium to draft better contracts faster.