Site Specific Conditions of Approval Sample Clauses

Site Specific Conditions of Approval. 1. Construct Xxxxxx Park Xxxx with two 11-foot travel lanes, 4-foot wide bike lanes, (30-feet of pavement) and 3-foot wide gravel shoulders within minimum 50-feet of right-of-way as terrain allows. IF constructed in phases, the first phase is limited to Phase 1 and 2 or 34 lots/building permits as shown in the preliminary plat below; and should be constructed from approximately 230-feet east of the corner, extending beyond the first access a minimum of 50-feet.
AutoNDA by SimpleDocs
Site Specific Conditions of Approval. 1. The walking path from the proposed development to Amity Road will require a 20-foot-wide water main easement, which shall be free from any permanent structures or encumbrances.
Site Specific Conditions of Approval. 1. To meet the City to and through policy, developer shall be required to continue a sewer main extension from manhole SSMH C1 to the eastern property boundary and install a cleanout for future extension.
Site Specific Conditions of Approval. 1.1 Sewer must connect to the north through Rogue River Ave and not from the south. This is a different sewer shed.
Site Specific Conditions of Approval. 1.1 Extend 8" water main to area of hydrant and then install the 6" lateral and hydrant. See mark up on sheet C-3.0. This would also allot the fire line and water meter runs to be shorter.
Site Specific Conditions of Approval. 1.1 Since the 6-plex’s to the east and west will not be individually owned lots, have a single meter come off of W Chair lift for each individual building instead of extending a water main down the common driveway.
Site Specific Conditions of Approval. 1.1 A streetlight plan will be required for the development of this property.
AutoNDA by SimpleDocs

Related to Site Specific Conditions of Approval

  • Specific Conditions If applicable, specific conditions required after a risk assessment will be included in Exhibit G. Grantee shall adhere to the specific conditions listed therein.

  • Conditions of Use CLIENT acknowledges that its use of the Site is subject to and conditioned upon the following terms and agrees that TAILGATE GUYS may exercise any of the remedies set forth herein for CLIENTS failure to comply:

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • BASIC CONDITIONS The State shall have no obligation to disburse money for the Project under this Grant Agreement until the Grantee has satisfied the following conditions:

  • General Conditions Costs Construction Manager is entitled to receive payment for the actual cost of the allowable General Conditions items incurred after receipt of a Notice to Proceed with Construction from the Owner through Substantial Completion of the Project plus thirty (30) calendar days. Construction Manager is not entitled to reimbursement for General Conditions Costs incurred before receipt of the Notice to Proceed. General Conditions Costs incurred after Substantial Completion must be approved in advance by the Owner. Allowable General Conditions items are identified below and by attached exhibit. These items shall be included in the General Conditions cost amount shown as a line item in the Guaranteed Maximum Price Proposal and as detailed on the schedule of values. Items not specifically included below or in the exhibit will not be allowed as a General Condition costs.

Time is Money Join Law Insider Premium to draft better contracts faster.