ROUTINE OPERATION, MAINTENANCE, & MONITORING (OM&M Sample Clauses

ROUTINE OPERATION, MAINTENANCE, & MONITORING (OM&M. The scope of work shall be structured to facilitate operation of the systems within regulatory guidelines, while maintaining the composition of the LFG at a level to support continuous operation of the flares, where present, and the LFGES, and to meet OC Waste & Recycling requirements. The scope shall also be designed to minimize the possibility of subsurface fires at the sites while achieving continued compliance with the SCAQMD Rule 1150.1, Articles 5 and 6 of Subchapter 4 of Chapter 3 of 27CCR, subpart WWW of 40 CFR 60, and site operating permits. Monitoring frequencies stated below are minimum requirements; more frequent monitoring may be required based on the results of data evaluation. More frequent monitoring, subject to OC Waste & Recycling approval, shall be directed by the OC Waste & Recycling Project Manager by issuance of a non-routine OM&M task order. Routine OM&M shall be accomplished by performing the following:
AutoNDA by SimpleDocs

Related to ROUTINE OPERATION, MAINTENANCE, & MONITORING (OM&M

  • Routine Maintenance Services PM1.03.2-1 Respond immediately to restrict all access to Highway Crossing Infrastructure, as directed by the Province.

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

  • MONITORING OF OPERATION AND MAINTENANCE 19.1 Monthly status reports During Operation Period, the Concessionaire shall, no later than 7 (seven) days after the close of each month, furnish to the Authority and the Independent Engineer a monthly report stating in reasonable detail the condition of the Bus Terminal including its compliance or otherwise with the Maintenance Requirements, Maintenance Manual, Maintenance Programme and Safety Requirements, and shall promptly give such other relevant information as may be required by the Independent Engineer. In particular, such report shall separately identify and state in reasonable detail the defects and deficiencies that require rectification.

  • Operating and Maintenance Manuals 58.1 If “as built” Drawings and/or operating and maintenance manuals are required, the Contractor shall supply them by the dates stated in the Contract Data.

  • Routine Maintenance (i) CRC shall be responsible for Routine Maintenance when necessary or desirable to maintain the Shared Assets in a safe operating condition, and to permit and facilitate (A) the performance by CRC of its obligations pursuant to this Agreement, and (B) the use of Shared Assets by the Operators in accordance with this Agreement.

  • System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.

  • Support and Maintenance Services Information about Teradici’s support and maintenance for the Licensed Product may be found at xxxxx://xxxx.xxxxxxxx.xxx.

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.

  • Site Maintenance The authorized area shall be maintained in a neat, clean, and safe condition, free of any solid waste, debris, or litter, except as specifically authorized herein.

  • Operation and Maintenance 17.1 O&M obligations of the Concessionaire

Time is Money Join Law Insider Premium to draft better contracts faster.