Reliable Energy Landscape Project Sample Clauses

Reliable Energy Landscape Project. The objective of the Reliable Energy Landscape Project is to reduce the current gap between energy demand and supply, by lowering energy use through piloting household investments in energy efficiency, switching to cost-effective non-electricity sources of heating, and reducing barriers to IPP entrants to the market. The proposed Activities under this Project include:
AutoNDA by SimpleDocs
Reliable Energy Landscape Project. The fact that demand for electricity significantly outstrips supply in Kosovo is the identified problem. Household electricity demand is mainly driven by household demand for outputs like lighting, heating, cooling, and cooking. Investments in energy efficiency are made to produce the same level of output from a reduced number of units of energy input. The Reliable Energy Landscape Project will address two root causes and barriers to investment: the general lack of consumer awareness of energy saving measures and their benefits, and for poor households, the lack of ability to pay for them. The proposed approach to address these root causes involves a mix of awareness raising, incentive piloting (to make investments affordable to the poor), regulatory support, and technical assistance/capacity building. The objective of the Reliable Energy Landscape Project is to reduce the current gap between energy demand and supply, by lowering energy use through piloting household investments in energy efficiency, switching to cost-effective non-electricity sources of heating, and reducing barriers to IPP entrants to the market. As a pilot, this Project also aims to create knowledge. As such, results beyond this objective in the logic are notional and not to be causally claimed by this Project. They are what is logically expected to happen if the pilot were to be scaled. The adoption of energy efficiency investments by consumers should reduce overall electricity demand in Kosovo, thereby reducing the stress on the grid (especially in winter, when demand is very high) leading to a reduction in outages and cost savings for businesses that currently must pay for expensive mitigation measures. Reducing overall demand will also decrease the total number of days each year that demand exceeds supply, when imports of relatively expensive electricity is required. This will reduce the overall cost of electricity, and would be reflected, compared to the counterfactual, in a lower tariff or taxes. Potential barriers to women’s activity in the labor market are a critical cross-cutting risk that might impact the ability to deliver benefits, in particular economic and employment opportunities in a largely male-dominated sector. The proposed approach to addressing this is through designing a set of incentives to boost women’s employment and entrepreneurship in the sector, directly tied to the economic opportunities that the project is likely to provide. The Project logic below also sho...
Reliable Energy Landscape Project. This Project may be evaluated through a combination of impact and performance evaluation methods. To meet MCC’s requirement of an independent evaluation, the independent evaluator cannot influence project design. While the PIE and District Heating Metering Activities are planned to include a formative evaluation, the independent evaluator will have to be a separate entity. However, both the formative and the independent evaluator can share data and MCC M&E staff will provide technical assistance to both aspects. The evaluation will include a process study, assessing the fidelity of implementation to the original design, and setting the stage for the assessment of results further down the logical chain. Performance evaluation methods may be used to assess results beyond the project objective, making use of quantitative data from the Kosovo energy sector as a whole. The questions that will guide the design of the evaluation may include: • Do households consume less electricity as a result of the Project? This links to the following indicators in Schedule A to Annex I: Household Electricity Consumption • Does a reduction in household electricity demand reduce the incidence of peak demand outstripping electricity supply, and subsequent power outages and import of power? This links to the following indicators in Schedule A to Annex I: Supply & Demand Gap, Load Factor, System Average Interruption Frequency Index, Imported Power. Evaluation: Transparent and Accountable Governance Project. This Project is expected to be evaluated through a performance evaluation, incorporating quantitative data where feasible. The evaluation will include a process study, assessing the fidelity of implementation to the original design, and setting the stage for the assessment of results further down the logical chain. The questions that will guide the design of the evaluation may include: • To what degree does the Government pay attention to or consume analyses done by non- government entities and whether that factors into any policy decision-making? This links to the following indicator in Schedule A to Annex I: Data-driven policy process (judicial & environmental) • Does the availability and of publically available data change the perception of Government function and performance within the judicial and environmental sectors? This links to the following indicators in Schedule A to Annex I: Public perception based on UNDP Pulse Survey (judicial & environmental), Public perception ...

Related to Reliable Energy Landscape Project

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Utility Infrastructure During the term of this Agreement, Company will have the right to receive water, sanitary sewer, electric, storm drainage, telecommunication and data services at the Premises.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.

  • Network Resource Interconnection Service (check if selected)

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

Time is Money Join Law Insider Premium to draft better contracts faster.