Railroad Tunnels Sample Clauses

Railroad Tunnels. The installation of Cable in Railroad tunnels shall be avoided whenever possible, by the installation of Cable over Railroad tunnels within Railroad Rail Corridor. Where such installation over the tunnel is not reasonably possible, and after specific written approval by Railroad's Engineer, Cable shall be laid or installed within existing conduits or ducts, where available and in usable condition, or within suitable conduit (nonflammable, inert material pipe) installed by Utility on the floor level of the tunnel, at a point farthest away as practical from the nearest operated rail or track.
AutoNDA by SimpleDocs

Related to Railroad Tunnels

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Roads All roads necessary for the full utilization of the Improvements for their intended purposes have been completed and/or the necessary rights-of-way therefor have been acquired by the Governmental Authority having or exercising jurisdiction over such matters or have been dedicated to public use and accepted by such Governmental Authority and all necessary steps have been taken by Borrower and such Governmental Authority to assure the complete use thereof.

  • Parking Throughout the Lease Term, Tenant shall have the exclusive right to use, free of charges, the number of parking spaces set forth in Section 12 of the Summary, which parking spaces constitute the entirety of the parking under the Building and the adjacent surface parking, being all of the parking in the Project. Tenant shall comply with the Parking Rules and Regulations which are in effect on the date hereof, as set forth in the attached Exhibit D and all reasonable modifications and additions thereto which are prescribed from time to time for the orderly operation and use of the Parking Areas by Landlord, and/or Landlord’s Parking Operator (as defined below); provided that such modifications or alterations do not effect Tenant’s use of or access to the Parking Areas. Landlord specifically reserve the right to change the size, configuration, design, layout, of the Parking Areas, and Tenant acknowledges and agrees that Landlord may, without incurring any liability to Tenant and without any abatement of Rent under this Lease, from time to time, temporarily close-off or restrict access to the Parking Areas, so long as Tenant retains access to the number of parking spaces set forth in Section 12 of the Summary. Landlord may delegate its responsibilities hereunder to a parking operator (the “Parking Operator”) in which case the Parking Operator shall have all the rights of control attributed hereby to Landlord. Any parking tax or other charges imposed by governmental authorities in connection with the use of such parking shall be paid directly by Tenant or the parking users, or, if directly imposed against Landlord, Tenant shall reimburse Landlord for all such taxes and/or charges within thirty (30) days after Landlord’s demand therefor. The parking rights provided to Tenant pursuant to this Article 23 are provided solely for use by Tenant’s own personnel visitors and invitees and such rights may not be transferred, assigned, subleased or otherwise alienated by Tenant without Landlord’s prior approval, except in connection with an assignment of this Lease or sublease of the Premises made in accordance with Article 14 above.

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Parking Area All Common Area (except sidewalks and service delivery facilities) now or hereafter designated by Landlord for the parking or access of motor vehicles, including roads, traffic lanes, vehicular parking spaces, landscaped areas and walkways, and including any parking structure constructed during the Term. Landlord and/or its successors may, by written notice to Tenant, elect in their sole discretion to increase and/or decrease the Parking Area from time to time during the Term for any reason whatsoever (including without limitation an election by Landlord and/or its successors in their sole discretion to make changes to the buildings situated in the Project, and/or to subdivide, sell, exchange, dispose of, transfer, or change the configuration of all or any portion of the Parking Area from time to time), so long as such changes to the Parking Area do not reduce the number of parking spaces available for Tenant's use below the minimum requirements set forth in PARAGRAPH 37 for a period of sixty (60) consecutive days or more. No such subdivision, sale, exchange, disposition, transfer, or change to the configuration of all or any portion of the Parking Area shall cause the Parking Area to be increased or decreased unless and until Landlord has given Tenant written notice of such increase or decrease.

  • Site The Generating Facility is located on approximately 10 acres with an address of 0000 Xxxxx Xxxxxx Xxxxxx in Xxxxxx Tree, San Bernardino County in California. The centroid of the solar array is 34.1383°N, -116.2262°W. The site is dedicated to the Generating Facility use only.

  • Elevators Landlord shall provide passenger elevator service during normal business hours to Tenant in common with Landlord and all other tenants. Landlord shall provide limited passenger service at other times, except in case of an emergency.

  • Transportation Reasonable transportation costs incurred in connection with the transportation of employees and material necessary for Operations.

  • Parking Facilities All parking areas now or hereafter made available by Landlord for use by tenants, including, without limitation, open-air parking, parking decks and parking areas under or within the Building, whether reserved, exclusive, non-exclusive or otherwise.

Time is Money Join Law Insider Premium to draft better contracts faster.