Pressure and Temperature Sample Clauses

Pressure and Temperature. Minimum delivery pressure at the Entry Point ____ psig Maximum delivery pressure at the Entry Point ____ psig Minimum delivery temperature at the Entry Point ___ º F Maximum delivery temperature at the Entry Point ___ º F
AutoNDA by SimpleDocs
Pressure and Temperature. Air density at the time of the test shall not deviate by more than ± 7.5 per cent from the reference conditions, P = 100 kPa and T = 293.2 K. Regulation No. 83 page 74 4. VEHICLE PREPARATION 1/
Pressure and Temperature. Because Sunoco controls certain variables which directly impact steam pressure and temperature, including feed water pressure, feed water temperature, load (steam flow rate), and the condensing station operation, Haverhill cannot be held unilaterally responsible for the pressure or temperature of the Steam delivered under this Agreement. However, Haverhill acknowledges that its HRSGs are designed to provide steam at four hundred sixty (460) PSIG and produce Steam at saturation temperature. To the extent that Steam pressure or temperature fall outside the reasonably optimal range for the operation of the Chemical Plant and the Coke Plant (Phase I), the Parties shall cooperate and take all such commercially reasonable steps necessary to reasonably optimize Steam pressure and/or temperature; provided, however, that in no event shall such commercially reasonable steps include the incurrence of a capital expense or materially increase the cost of operating the Chemicals Plant or the Coke Plant (Phase I) without corresponding economic adjustments to this Agreement which would require the consent of both Parties.

Related to Pressure and Temperature

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Meters 7.1.1 For installation of Meters, Meter testing, Meter calibration and Meter reading and all matters incidental thereto, the SPD and SECI shall follow and be bound by the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, the Grid Code, as amended and revised from time to time.

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Technical Specifications 1. A procuring entity shall not prepare, adopt or apply any technical specification or prescribe any conformity assessment procedure with the purpose or effect of creating an unnecessary obstacle to trade between the Parties.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Tolerances 1. If a non-originating material used in the production of a product does not satisfy the requirements set out in Annex 3-B, the product shall be considered as originating in a Party, provided that:

  • Tolerance Average net mass of cement packed in bags in a sample shall be equal to or more than 50kg. If and as desired by the Engineer-in-Charge, the number of samples to be checked for net mass of cement per bag, in a given number of bags shall be as given below: 100 to 150 bags : 20 sample 150 to 280 bags : 32 sample 281 to 500 bags : 50 sample 501 to 1200 bags : 80 sample 1201 to 3200 bags : 125 sample 3201 and above : 200 sample The bags in a sample shall be selected at random. B- Sand (Fine Aggregate)

  • DELIVERY PRESSURE Xxxxxx agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 20 pounds per square inch gauge, and not less than 5 pounds per square inch gauge, at the "Point of Delivery". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side of the "Delivery Point".

Time is Money Join Law Insider Premium to draft better contracts faster.