Pothole Patching Sample Clauses

Pothole Patching. Remove debris and clean area to be resurfaced, prepare hole with tack material; fill with #404 hot asphalt and compact; feather and taper all edges; seal edges with asphaltic concrete tack. Cost Per Ton October 1, 2015 through September 30, 2016 $ October 1, 2016 through September 30, 2017 $ October 1, 2017 through September 30, 2018 $
AutoNDA by SimpleDocs
Pothole Patching. Pothole Patching provides for the application of an asphalt-based patching compound to fill potholes and provide a smooth running surface. The estimated quantities involved in this section are for bidding purposes only. The quantity may be extended, reduced or deleted at the discretion of the Contract Manager, with no change in unit price. The contractor shall submit, to the Contract Manager, product performance specifications for the pothole patching materials proposed to be used. No application shall be performed until the material has been approved by the Contract Manager. The Contractor shall implement the appropriate traffic control. Pothole preparation, material application and curing shall be in accordance with the manufacturer’s recommendations and to the satisfaction of the Contract Manager.

Related to Pothole Patching

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • CLEC Provided Splitter – Line Sharing 3.4.1 Freedom may at its option purchase, install and maintain central office POTS splitters in its collocation arrangements. Freedom may use such splitters for access to its customers and to provide digital line subscriber services to its customers using the High Frequency Spectrum. Existing Collocation rules and procedures and the terms and conditions relating to Collocation set forth in Attachment 4- Central Office shall apply.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Provisioning of Line Sharing and Splitter Space 3.2.1 BellSouth will provide ONS with access to the High Frequency Spectrum as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.