Phase A Project Affordable Housing Sample Clauses

Phase A Project Affordable Housing. Developer will restrict all of the apartment units in the Phase A Project (except for two manager’s units) as affordable housing (“Affordable Units”). The income levels of the Phase A Affordable Units will be at the extremely low to low income levels, with an average income level of no greater than 43 percent of Area Median Income. The rent levels of the Phase A Affordable Units will be in accordance with the requirements of the City’s Inclusionary Housing Ordinance, Municipal Code Chapter 8.68, and state density bonus law requirements. Developer and City will enter into and record prior to issuance of building permits a Regulatory Agreement, which sets forth the affordable housing obligations and other requirements for operation of the Phase A Project and Affordable Units. The term of the Regulatory Agreement will be 55 years from the date of issuance by City of a Certificate of Occupancy for the Phase A Project. Upon occupancy of the Phase A Project, Developer shall fully furnish, at its sole cost and expense, a minimum of 41 units for homeless persons, at-risk of becoming homeless persons, and persons with special needs with necessary and appropriate appliances, furniture, and basic kitchenware/dishes.
AutoNDA by SimpleDocs

Related to Phase A Project Affordable Housing

  • Affordable Housing The Owner covenants with the Council as follows:-

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Projects The Annexes attached hereto describe the specific projects and the policy reforms and other activities related thereto (each, a “Project”) that the Government will carry out, or cause to be carried out, in furtherance of this Compact to achieve the Objectives and the Compact Goal.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • PROPERTY IMPROVEMENTS Improvements placed on National Forest System land at the direction of either of the parties, shall thereupon become property of the United States, and shall be subject to the same regulations and administration of the Forest Service as other National Forest improvements of a similar nature. No part of this instrument shall entitle the cooperator to any share or interest in the project other than the right to use and enjoy the same under the existing regulations of the Forest Service.

  • PROFESSIONAL DEVELOPMENT AND EDUCATIONAL IMPROVEMENT A. The Board agrees to implement the following:

  • The Project The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part.

  • Development of the Property Except as modified by this Agreement, the Development and the Property will be developed in accordance with all applicable local, state, and federal regulations, including but not limited to the City’s ordinances and the zoning regulations applicable to the Property, and such amendments to City ordinances and regulations that that may be applied to the Development and the Property under Chapter 245, Texas Local Government Code, and good engineering practices (the “Applicable Regulations”). If there is a conflict between the Applicable Regulations and the Development Standards, the Development Standards shall control.

Time is Money Join Law Insider Premium to draft better contracts faster.