Impacts on Local Air Quality Sample Clauses

Impacts on Local Air Quality. The project infrastructure route is located in a predominantly settled area where the main air pollution activities include industrial activities and vehicle movements along the road. During site visit activities, dust emissions by trucks were observed. During the construction phase, the main sources of air pollution will be soil excavations which raise particular particulate matter (dust) within the Project AoI. More so, transportation of Project materials and equipment will be associated with dust emissions along the access roads especially on murram roads. In addition, exhaust emissions from the construction equipment and machinery are expected to include CO2, NO2, SO2 and volatile organic compounds, since most of them will be powered by diesel/ petrol engines. However, these will be in very small quantities since light construction activities are expected, mainly associated with the preparation of the foundations and pipeline excavation. Given the location of the proposed Project Site and the localised nature of dust emissions, the main receptors of this impact will be the construction workers, other road users and some nearby settlements and institutions, including health centres and schools. Mitigation/Management Measures • Spraying water on soil before excavation and periodic access road wetting to reduce nuisance dust levels. • Visual inspection of dust pollution from roads and the construction site and appropriate intervention if dust levels are high. • Speed restriction of construction vehicles to a speed of 30 km/h or less on the site and on the access roads to the site. • Maintenance and servicing of machines and engines off-site. • Refuelling from authorised fuel stations. • Grievance procedure for dust complaints. • The use of appropriate Personal Protective Equipment (PPE) such as dust masks, in particular, for construction workers. • All construction materials will be transported in designated trucks which will be covered.
AutoNDA by SimpleDocs

Related to Impacts on Local Air Quality

  • Indoor Air Quality The Employer shall ensure a healthful air quality and attempt to ensure comfortable air temperature in buildings it owns and in space that it leases.

  • Air Quality To the extent applicable, Consultant must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Consultant shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel-powered engine. Consultant shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Consultant, its subconsultants, or others for whom Consultant is responsible under its indemnity obligations provided for in this Agreement.

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.

  • Water Quality 8.1. The Supply shall comply with the quality standards imposed by the Act and the Water Quality Regulations, PROVIDED ALWAYS that where a particular standard is the subject of a legal instrument accepted or issued by the Secretary of State or the Chief Inspector of Drinking Water under the provisions of the Act or the Water Quality Regulations, compliance with the terms of the relevant legal instrument shall be deemed to be compliance with the relevant quality standard imposed by the Act or the Water Quality Regulations (as the case may be), in which case the Water Company shall provide the New Appointee with a certified copy of any such authorised departure or undertaking. Each party undertakes to keep the other party fully informed of any discussions which take place at any time hereafter with the Secretary of State for the proposed issue of a legal instrument and of the outcome thereof.

  • Cooperation on forestry matters and environmental protection 1. The aims of cooperation on forestry matters and environmental protection will be, but not limited to, as follows: (a) establishing bilateral cooperation relations in the forestry sector; (b) developing a training program and studies for sustainable management of forests; (c) improving the rehabilitation and sustainable management of forest with the aim of increasing carbon sinks and reduce the impact of climate change in the Asia-Pacific region; (d) cooperating on the execution of national projects, aimed at: improving the management of forest plantations for its transformation for industrial purposes and environmental protection; (e) elaborating studies on sustainable use of timber; (f) developing new technologies for the transformation and processing of timber and non-timber species; and (g) improving cooperation in agro-forestry technologies. 2. To achieve the objectives of the Article 149 (Objectives), the Parties may focus, as a means of cooperation and negotiations on concluding a bilateral agreement on forestry cooperation between the two Parties. Such collaboration will be as follows: (a) exchanges on science and technology as well as policies and laws relating the sustainable use of forest resources; (b) cooperation in training programs, internships, exchange of experts and projects advisory; (c) advice and technical assistance to public institutions and organizations of the Parties on sustainable use of forest resources and environmental protection; (d) facilitating forest policy dialogue and technical cooperation under the Network of Sustainable Forest Management and Forest Rehabilitation in Asia- Pacific Region, initiated at the 15th Asia Pacific Economic Cooperation (APEC) Meeting; (e) encouraging joint studies, working visits, exchange of experiences, among others; and (f) others activities mutually agreed.

  • Fire, Life Safety, and Accessibility Codes The following codes, in the versions approved by the Georgia State Fire Marshal/Fire Safety Commissioner and Department of Human Resources, shall be used. The Design Professional will designate any additional codes or special modifications in the Supplementary General Conditions.

  • Power Quality Neither the facilities of Developer nor the facilities of Connecting Transmission Owner shall cause excessive voltage flicker nor introduce excessive distortion to the sinusoidal voltage or current waves as defined by ANSI Standard C84.1-1989, in accordance with IEEE Standard 519, or any applicable superseding electric industry standard. In the event of a conflict between ANSI Standard C84.1-1989, or any applicable superseding electric industry standard, ANSI Standard C84.1-1989, or the applicable superseding electric industry standard, shall control.

  • NMHS Governance, Safety and Quality Requirements 3.1 Participates in the maintenance of a safe work environment.

  • EMHS Governance, Safety and Quality Requirements 4.1 Participates in the maintenance of a safe work environment.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

Time is Money Join Law Insider Premium to draft better contracts faster.