Enabling Works onsite to Complete Installation Sample Clauses

Enabling Works onsite to Complete Installation. Advance planning to determine the extent of various expertise required on site to complete enabling works is a key factor in creating efficiencies and avoiding delays. ➢ Electrical expertise, civil expertise and automation expertise were required to varying degrees at each of the sites and the availability of this expertise proved a challenge at some sites. In addition, coordination between and availability of various trades and expertise can lead to unforeseen delays. Engaging a general contractor with all these skills is a possible solution to gain efficiencies onsite, however adequate advance planning is a prerequisite. ➢ The complexity of installation of the MCU as a control device was referenced by a number of demonstration site manager and this issue requires further consideration. The installation of the device as a monitoring system only is a potential solution. Moreover, in countries where low-cost systems are desired, the INNOQUA system may be installed without a MCU. ➢ Power security in certain countries (India and Tanzania) is a significant issue and despite provision of new infrastructure to provide a dedicated power supply to the INNOQUA system the frequent power outages required a dedicated back up supply. Where requirement for power can be designed out i.e. gravity feeds replace pump feeds this would be advantageous. ➢ Potential theft, vandalism and trespassing are all elements that require consideration in design in particular at community-based installations where access is not on private property with restricted access. Also, in the case of theft and vandalism, in economically disadvantaged areas. ➢ Suitable and secure access to the top of the lumbrifilter is required for maintenance and initial setup and in most cases at the demonstration sites this was provided by a proprietary access platform purchased locally which can add considerable expense. ➢ The initial filling of the lumbrifilter with granular and active layer substrate is a considerable undertaking by hand and consideration should be given to this aspect of the system in the design of the system. ➢ The insulation arrangement provided at the Irish and Scottish demonstration sites presented some difficulties as the outer aluminium skin was not robust in transportation and tended to separate from the heavier inner plastic tank. In addition, the design did not prevent rainwater ingress to the insulation. Design of a tank with integrated insulation is preferred or underground ins...
AutoNDA by SimpleDocs
Enabling Works onsite to Complete Installation. Planning required to determine the various expertise needed (mech, elect etc) to avoiding delays and create efficiencies. ✓ ✓ Availability and coordination of expertise (mech, elect, etc) can be avoided by engaging a general contractor for install. ✓ ✓ Installation of the the MCU as a control device requires further consideration. ✓ ✓ ✓ The installation of the device as a monitoring system only is a potential solution ✓ ✓ ✓ Lack of power security for pump operation is an issue in some regions – gravity fed solution would avoid dependency ✓ ✓ ✓ Risk of theft, vandalism and trespassing require consideration esp. in Community installations where access is not restricted ✓ ✓ Suitable and secure access to the top of the lumbrifilter (when above ground) is required this could be integrated to design ✓ ✓ ✓ Filling of the lumbrifilter with granular/active layer material can be a very physical undertaking requiring further consideration ✓ ✓ ✓ Table 7-2 (continued) Mapping Lessons from Site Installation and Initial Setup Site Installation and Initial Setup Commercial Offering D6.4 Product Design D6.2 Site Suitability D6.2 I, O, M Protocols D6.2 The insulated lumbrifilter tank outer aluminium shell was not robust in transportation – this requires design consideration ✓ ✓ Insulated lumbrifilter tank outer shell not water tight at pipe opes/lid and lid not robust - requires design consideration ✓ ✓ Design of a tank with integrated insulation is preferable ✓ ✓ Pipe insulation where required due to extreme weather should be fitted before arrival on site as more efficient. ✓ Avoiding the need for pumps would provide considerable advantages particularly where power supply is uncertain ✓ ✓

Related to Enabling Works onsite to Complete Installation

  • Removal of Improvements Except as otherwise expressly agreed to by Lessor and Lessee, Lessee shall have the right to remove all Tank Farm Assets and other improvements, fixtures, equipment, materials, supplies and personal property installed by Lessee from the Premises upon the termination or expiration of this Lease, but in no event later than the date that is 120 days following the expiration or termination of this Lease (the “Removal Date”) and Lessor shall provide Lessee with access to the Premises at reasonable times until expiration of the Removal Date for the purpose of removing such items. Lessee shall provide Lessor with written notice of its election to remove the Tank Farm Assets and other improvements, fixtures, equipment, materials, supplies and personal property from the Premises at least 60 days prior to the expiration of the Lease. If Lessee elects to remove the Tank Farm Assets and Improvements from the Premises after such removal Lessee shall restore any damage to the Premises and clean the Premises so as to eliminate therefrom any accumulation (other than any de minimis and non-hazardous accumulation) of foreign substances, materials, or debris, in addition to any Environmental Cleanup that may be required under Article 10. Lessee shall pay Lessor pro rata Rent (based on the amount of Rent applicable during the last month prior to the termination or expiration) through the date of Lessee’s complete removal of all such items. During the period of such removal and clean-up, all terms and conditions of this Lease, including, the indemnity and insurance provisions shall continue in full force and effect. If Lessee elects not to remove all of the Tank Farm Assets and Improvements from the Premises on or before the Removal Date, and provided that such facilities are in good working condition at the expiration of the Term (ordinary wear and tear excepted) then, such Tank Farm Assets and Improvements shall be deemed permanently abandoned to Lessor’s sole ownership, and Lessor may remove and dispose of such facilities in any manner which Lessor may deem appropriate, without any liability whatsoever to Lessee. If Lessee elects not to remove all of the Tank Farm Assets and Improvements from the Premises on or before the Removal Date and such facilities are not in good working condition at the expiration of the term (ordinary wear and tear excepted), or Lessee fails to so remove any or all of the Tank Farm Assets and Improvements from the Premises before the Removal Date, then, in addition to all rights and remedies available at law or in equity, without any prior notice, Lessor may (but shall be under no obligation), at Lessor’s option, deem such Tank Farm Assets and Improvements to be permanently abandoned to Lessor’s sole ownership, and Lessor may remove and dispose of such facilities in any manner which Lessor may deem appropriate, without any liability whatsoever to Lessee, and Lessee shall reimburse Lessor for all costs of such removal and disposal upon demand from Lessor. If requested by Lessor, Lessee shall execute any and all documents necessary to evidence that title to the Tank Farm Assets and Improvements that Lessee does not remove by the Removal Date is in Lessor and to extinguish and remove any cloud or potential cloud on the title to the Premises and/or such facilities created by Lessee.

  • ALTERATIONS & IMPROVEMENTS Tenant shall not make any alterations, additions or improvements or do any type of construction to the Property without first obtaining Landlord's written consent. Unless prior written agreement is reached between Tenant and Landlord, any such alterations, additions, improvements or construction shall become part of the Property and shall remain at the expiration of Tenant's Lease term. If Landlord approves of alterations, additions, improvements or construction in writing and Tenant intends to use contractors to undertake such work, the contractors must first be approved in writing by Landlord. Tenant must also place any funds to cover the amount of any alterations, additions, improvements or construction in an escrow account approved by Landlord before the commencement of the work. Landlord shall designate the times and manner of the work being done, exclusively.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Installation, Inspection, and Maintenance The Contractor is responsible for installation and maintenance of the BMPs as a part of its Bid. The Design Professional shall obtain the services of a qualified testing laboratory to inspect the BMPs in accordance with the permits, the costs of such inspections to be borne by the Owner. In the event of Abnormal Weather Conditions or force majeure, the Contractor shall be compensated for re-installation of BMPs at established Unit Prices.

  • Access Rights for implementation Access Rights to Results and Background Needed for the performance of the own work of a Party under the Project shall be granted on a royalty-free basis, unless otherwise agreed for Background in Attachment 1.

  • Disbursements for Site Improvements All payments made by the OPWC for site improvements or other work shall be made directly to the Contractor that performed the work and originated the invoice, unless the request is for disbursement to the Recipient.

  • Filing Systems and Equipment A complete and comprehensive catalog of filing systems including vertical and lateral files, bookcases, mobile cabinets and freestanding file cabinets.

  • Removal of Equipment and Materials Within 30 days after completion of the requirements of this contract, PURCHASER shall remove from the areas of operations, and other property owned or controlled by STATE, all equipment, materials, and other property PURCHASER has placed or caused to be placed thereon that is not to become the property of STATE. It is agreed that any such equipment, materials, and other property that are not removed within 30 days, shall become the property of STATE and may be used or otherwise disposed of by STATE without notice or obligation to PURCHASER or to any party to whom PURCHASER may transfer title. Nothing in this section shall be construed as relieving PURCHASER from an obligation to clean up and to burn, remove, or dispose of debris, waste materials, and such, in accordance with the provisions of this contract. PURCHASER shall indemnify STATE for expenses as a result of cleanup, removal or disposal of debris, waste materials, and such.

  • CONSTRUCTION AND IMPROVEMENTS Concessionaire shall not affix, alter, or erect any permanent or temporary equipment, structures, buildings, or additions to the Concession Premises without first obtaining the prior written approval of Department.

Time is Money Join Law Insider Premium to draft better contracts faster.