Examples of Train 6 in a sentence
It is the expectation that Akron shall achieve this upgrade by modifying Train 6 to include a step feed mode.
Akron shall construct this upgrade by modifying secondary treatment Train 6 to include a step feed mode, replacing/modifying and covering the Train 6 final settling tanks launders, modifying all final settling tanks by removing the domed covers, and reconstructing the aeration influent flume as described in Section 4.2.1 of Akron’s June 8, 2009 No Feasible Alternative (“NFA”) Addendum as may be modified after the Updated NFA and NFA Supplement required in Attachment A.
After modifying Train 6 to include a step feed mode and optimizing performance of this train, Akron shall conduct a stress test (s) of Train 6 in step feed mode to determine the maximum capacity of this train, and shall use the results of the stress test(s) to prepare a report summarizing the performance of Train 6 in step feed mode.
Maximum electrical brake force for Green Train (6 cars) is limited to 228 kN (for lower speeds) or the tractive power (for higher speeds).
In the event Train 6 Debt is incurred, the Borrower shall provide to the Senior Facility Agent a copy of any report from the Independent Engineer and any other consultant that the Holders of such Train 6 Debt are entitled to receive.
In the event Train 6 Debt is incurred, the Borrower shall provide to the Common Security Trustee and each Secured Debt Holder Group Representative a copy of any report from the Independent Engineer and any other consultant that the Holders of such Train 6 Debt are entitled to receive.
U.S. EPR FSAR Table 8.3-3 lists 480 V AC Load Centers 35BFB, 35BFC, and 35BFD for Train 5, and 480 V AC Load Centers 36BFB, 36BFC, and 36BFD for Train 6.
These 480 V AC Load Centers are replaced in the site-specific design with 6.9 kV Switchgear 35BBE and 35BBF for Train 5 and 6.9 kV Switchgear 36BBE and 36BBF for Train 6.
This Change order captures the cost impacts associated with the additional testing required to support analysis, resulting remediation work throughout Train 6 ISBL and the piles and tension connectors added to the following Train 6 ISBL areas: A01, B01, D01, F01, G01, H01, K01, L01 and N02.
In accordance with Section 6.1 of the Agreement ( Change Orders Requested by Owner), the Parties agree this change order reflects Contractor’s cost to perform an electrical study and revise the design to incorporate GTG grid modifications into the Train 6 design to allow for operation as a single 13.8 kV power grid.