Stormwater site plan definition

Stormwater site plan means the comprehensive report containing all of the technical information and analysis necessary for the city to evaluate a proposed new development or redevelopment for compliance with stormwater requirements.
Stormwater site plan means the comprehensive report containing all of the technical information and analysis necessary for regulatory agencies to evaluate a proposed new development or redevelopment project for compliance with stormwater requirements. Contents of the stormwater site plan will vary with the type and size of the project and individual site characteristics. It includes a construction
Stormwater site plan means the comprehensive report containing all of the technical

Examples of Stormwater site plan in a sentence

  • A Stormwater site plan must be submitted with the Site Construction Permit application(s).

  • Stormwater site plan technical memorandum – prepare a brief preliminary stormwater design memo to document stormwater management requirements for the preferred stormwater treatment facilities.

  • Stormwater site plan review staff are trained in low impactdevelopment.

  • To get around this, we transform our 2-dimensional problem into two 1- dimensional problems, and here is the first of them:[ ]Lemma 10.2. There exists A ∈ B X such that G A separates points in each orbit of a comeager G-invariant set D, i.e. for each x ∈ D, the restriction of the coding map f⟨A⟩ to x G is one-to-one.

  • The document will be recorded shortly, and the township now has legal authority to use the road that is on both theirs and the township’s property.• Zoning Hearing Board - Two applications will be presented: Pleasant Acres re-use as a senior living facility; Stormwater site plan review for a steep slope zone.

  • A Stormwater site plan has been prepared showing erosion control methods for this site.


More Definitions of Stormwater site plan

Stormwater site plan means the comprehensive report containing all of the technical information and analysis necessary for regulatory agencies to evaluate a proposed new development or redevelopment project for compliance with stormwater requirements. Contents of the stormwater site plan will vary with the type and size of the project and individual site characteristics. It includes a construction stormwater pollution prevention plan (construction SWPPP) and a permanent stormwater control plan (PSCP). Guidance on preparing a stormwater site plan is contained in the manual.
Stormwater site plan means a plan which includes an Erosion and Sediment Control (ESC) Plan and/or a Permanent Stormwater Quality Control Plan (PSQCP). For small
Stormwater site plan means a plan which includes an Erosion and Sediment Control
Stormwater site plan means the comprehensive report containing all of the technical information and analysis necessary for regulatory agencies to evaluate a proposed new development or redevelopment project for compliance with stormwater requirements. Contents of the Stormwater Site Plan will vary with the type and size of the project, and individual site characteristics. It includes a Construction Stormwater Pollution Prevention Plan (Construction SWPPP) that must be submitted to and approved by the Washington Department of Ecology, and a Permanent Stormwater Control Plan (PSC Plan). Guidance on preparing a Stormwater Site Plan is contained in the Stormwater Manual, Chapter 3 of Volume I. Modified submittals of stormwater site plans are permitted as specified in the General Requirements.
Stormwater site plan means a plan that includes a SMP, TESCP, a PSQCP, and/or an SPESCP.
Stormwater site plan means a comprehensive report containing all of the technical information and analysis necessary for the city to evaluate a proposed new development or redevelopment project for compliance with stormwater requirements. Contents of the stormwater site plan will vary with the type and size of the project, and individual site characteristics.., but could include It includes and a temporary erosion and sediment control plan (TESCP) a Construction Stormwater Pollution Prevention Plan (Construction SWPPP), and a permanent stormwater control plan (PSCPlan).and/or a small parcel erosion and sediment control plan SPESCP.

Related to Stormwater site plan

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Stormwater means water resulting from precipitation (including rain and snow) that runs off the land’s surface, is transmitted to the subsurface, or is captured by separate storm sewers or other sewage or drainage facilities, or conveyed by snow removal equipment.

  • Wastewater System means a system of wastewater collection, treatment,

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Site Plan means a document or map that may be required by a county during a preliminary review preceding the issuance of a building permit to demonstrate that an owner's or developer's proposed development activity meets a land use requirement.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Utility easement means a right held by a facility operator to install, maintain, and access an underground facility or pipeline.

  • Drainage area means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.

  • Easement Area means the area of the servient lot marked on the survey-strata plan as being subject to the relevant easement; and

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Project Common Areas as used in this Lease, shall mean the portion of the Project designated as such in the Site Plan. The Project Common Areas shall consist of all parking facilities, entrances and exits, driveways, exterior walkways, first-class landscaped and hardscaped areas which are generally consistent with the quality of landscaped and hardscaped areas of Comparable Buildings in existence as of the date of this Lease, open space areas and plazas on the real property comprising the Project. The term "BUILDING COMMON AREAS," as used in this Lease, shall mean the portions of the Common Areas located within any building in the Project not entirely leased by Tenant, which Building Common Areas shall be reasonably designated as such by Landlord. Notwithstanding the foregoing and subject to (i) Landlord's approval, which approval (as indicated in Section 29.4 below) shall not be unreasonably withheld or delayed, (ii) the CC&R's, and (iii) all terms of this Lease regarding Hazardous Materials, Tenant may install or locate such items as benches, patio tables, bike racks, above-ground generators, security cameras and the like (collectively, "MISCELLANEOUS COMMON AREA ITEMS") at Tenant's sole cost in the Common Areas or on the exterior of the Building, as applicable, provided that Tenant removes such items upon the expiration or earlier termination of this Lease and repairs any damage to the Common Areas or the exterior of the Building (as applicable) resulting from such removal. If Tenant fails to remove any Miscellaneous Common Area Item or to repair any damage resulting from such removal upon the expiration or earlier termination of this Lease, Landlord may do so and may charge Landlord's actual cost thereof to Tenant. The manner in which the Common Areas are maintained and operated shall be in accordance with a standard which is not less than that customarily followed in the operation and maintenance of first class mid-rise office buildings located within the University Towne Center (i.e., the area from two (2) blocks to the North of La Jolla Village Drive to two (2) blocks to the South of La Jolla Village Drive between the I-5 and I-805 freeways), Del Mar, Carmel Valley and Torrey Hills geographical areas, provided that Landlord shall manage, maintain and operate the same in a manner consistent with that of Comparable Buildings, and the use thereof shall be subject to such rules and regulations as Landlord reasonably may make from time to time. As used herein, "COMPARABLE BUILDINGS" shall mean the first class mid-rise office buildings (now existing or subsequently constructed) within the projects located within the University Towne Center, Del Mar, Carmel Valley and Torrey Hills geographical areas and having substantially similar characteristics to the Building pertaining to size, age, accessibility, design, quality, amenities and tenancies. Landlord reserves the right to make alterations or additions to, or to change the location of, elements of the Project and the Common Areas, provided that if any such changes might affect Tenant's use of the Premises (in other than an immaterial manner), Landlord obtains Tenant's prior written approval of any such alterations, additions and changes and such alterations, additions and changes do not unreasonably interfere with Tenant's access to the Premises. Except when and where Tenant's right of access is specifically excluded in this Lease, Tenant shall have the right of access to the Building and the parking facilities twenty-four (24) hours per day, seven (7) days per week during the Lease Term. PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems]

  • Common Area means all areas and facilities within the Project that are not designated by Landlord for the exclusive use of Tenant or any other lessee or other occupant of the Project, including the parking areas, access and perimeter roads, pedestrian sidewalks, landscaped areas, trash enclosures, recreation areas and the like.

  • Common Areas is defined as all areas and facilities outside the Premises and within the exterior boundary line of the Industrial Center and interior utility raceways within the Premises that are provided and designated by the Lessor from time to time for the general non-exclusive use of Lessor, Lessee and other lessees of the Industrial Center and their respective employees, suppliers, shippers, customers, contractors and invitees, including parking areas, loading and unloading areas, trash areas, roadways, sidewalks, walkways, parkways, driveways and landscaped areas.

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • conservation area means any improved area within the boundaries of a redevelopment project area located within the territorial limits of the municipality in which 50% or more of the structures in the area have an age of 35 years or more. Such an area is not yet a blighted area but because of a combination of 3 or more of the following factors may be considered as a “conservation area”:

  • Water System or “water works” means all public facilities for securing, collecting, storing, pumping, treating, and distributing water.

  • Conservation easement means that term as defined in section 2140 of the natural resources and environmental protection act, 1994 PA 451, MCL 324.2140.

  • Storm water or wastewater collection system means piping, pumps, conduits, and any other equipment necessary to collect and transport the flow of surface water run-off resulting from precipitation, or domestic, commercial, or industrial wastewater to and from retention areas or any areas where treatment is designated to occur. The collection of storm water and wastewater does not include treatment except where incidental to conveyance.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Drainage system means one or more artificial ditches, tile drains or similar devices which collect surface runoff or groundwater and convey it to a point of discharge.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;