Project Site Commissioning definition

Project Site Commissioning means those activities set out in Appendices D, K and Z of the GIMI Topsides Agreement as will be detailed in the Project Site Commissioning procedures developed by the Sub-Contractor;
Project Site Commissioning means those activities set out in Appendix D (Definition of Services/Division of Responsibility Table), Appendix K (Onsite Commissioning and Startup Plan and Schedule) and Appendix Z (Mechanical Completion and Startup Responsibilities) of the GIMI Topsides Agreement and leading up to Startup of each train of LNG and all the Equipment, the performance of the Performance Tests and ending at Final Acceptance as will be detailed in the Commissioning Protocol;

Examples of Project Site Commissioning in a sentence

  • The Owner shall perform the Project Site Commissioning with the assistance of the Contractor and of the Sub-Contractor.

  • Project Site Commissioning will commence when the Owner has issued the Ready for First Gas Certificate.

  • Owner shall be presented in a written report(s) produced and delivered by the Owner to the Sub-Contractor within five (5) Days of the completion of the relevant aspect of Project Site Commissioning.

Related to Project Site Commissioning

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Project Work means the work required to complete the Project.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).

  • Decommissioning means the measures taken at the end of a facility's operating life to assure the continued protection of the public from any residual radioactivity or other potential hazards present at a facility.

  • Project Common Areas as used in this Lease, shall mean the portion of the Project designated as such in the Site Plan. The Project Common Areas shall consist of all parking facilities, entrances and exits, driveways, exterior walkways, first-class landscaped and hardscaped areas which are generally consistent with the quality of landscaped and hardscaped areas of Comparable Buildings in existence as of the date of this Lease, open space areas and plazas on the real property comprising the Project. The term "BUILDING COMMON AREAS," as used in this Lease, shall mean the portions of the Common Areas located within any building in the Project not entirely leased by Tenant, which Building Common Areas shall be reasonably designated as such by Landlord. Notwithstanding the foregoing and subject to (i) Landlord's approval, which approval (as indicated in Section 29.4 below) shall not be unreasonably withheld or delayed, (ii) the CC&R's, and (iii) all terms of this Lease regarding Hazardous Materials, Tenant may install or locate such items as benches, patio tables, bike racks, above-ground generators, security cameras and the like (collectively, "MISCELLANEOUS COMMON AREA ITEMS") at Tenant's sole cost in the Common Areas or on the exterior of the Building, as applicable, provided that Tenant removes such items upon the expiration or earlier termination of this Lease and repairs any damage to the Common Areas or the exterior of the Building (as applicable) resulting from such removal. If Tenant fails to remove any Miscellaneous Common Area Item or to repair any damage resulting from such removal upon the expiration or earlier termination of this Lease, Landlord may do so and may charge Landlord's actual cost thereof to Tenant. The manner in which the Common Areas are maintained and operated shall be in accordance with a standard which is not less than that customarily followed in the operation and maintenance of first class mid-rise office buildings located within the University Towne Center (i.e., the area from two (2) blocks to the North of La Jolla Village Drive to two (2) blocks to the South of La Jolla Village Drive between the I-5 and I-805 freeways), Del Mar, Carmel Valley and Torrey Hills geographical areas, provided that Landlord shall manage, maintain and operate the same in a manner consistent with that of Comparable Buildings, and the use thereof shall be subject to such rules and regulations as Landlord reasonably may make from time to time. As used herein, "COMPARABLE BUILDINGS" shall mean the first class mid-rise office buildings (now existing or subsequently constructed) within the projects located within the University Towne Center, Del Mar, Carmel Valley and Torrey Hills geographical areas and having substantially similar characteristics to the Building pertaining to size, age, accessibility, design, quality, amenities and tenancies. Landlord reserves the right to make alterations or additions to, or to change the location of, elements of the Project and the Common Areas, provided that if any such changes might affect Tenant's use of the Premises (in other than an immaterial manner), Landlord obtains Tenant's prior written approval of any such alterations, additions and changes and such alterations, additions and changes do not unreasonably interfere with Tenant's access to the Premises. Except when and where Tenant's right of access is specifically excluded in this Lease, Tenant shall have the right of access to the Building and the parking facilities twenty-four (24) hours per day, seven (7) days per week during the Lease Term. PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems]

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Wastewater System means a system of wastewater collection, treatment,

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Power Plant means a facility for the generation of

  • construction site means a workplace where construction work is being performed;

  • Wastewater facilities means the structures, equipment, and processes required to collect, carry away, and treat domestic and industrial wastes and dispose of the effluent.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;

  • The Site, where applicable, means the designated project place(s) named in the bidding document.

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Plant Site (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as: