Commissioning Protocol definition

Commissioning Protocol has the meaning given to it in Article 4.1.2; "Completion Certificate" has the meaning given in Schedule 10;
Commissioning Protocol of the PB40ES PowerBuoy and mooring system The preliminary Commissioning Protocol for the PB40ES PowerBuoy and mooring system is attached to the Agreement as Annex X. The final Commissioning Protocol for the PB40ES PowerBuoy and mooring system shall be delivered by the CONTRACTOR to the CLIENT at least one month prior to the Scheduled date for commencement of the commissioning of the PB40ES PowerBuoy and mooring system.
Commissioning Protocol means a commissioning protocol developed by the Owner incorporating the Sub-Contractor's comments in accordance with Clause 28 of the GIMI Topsides Agreement which shall be consistent with the schedule for Commissioning contained in Appendix K (Onsite Commissioning and Startup Plan and Schedule) of the GIMI Topsides Agreement;

Examples of Commissioning Protocol in a sentence

  • The proper functioning of the Plant shall be checked during this Commissioning Period according to the Final Commissioning Protocol.

  • Each of the actions included in the Commissioning Protocol carried out during commissioning shall be recorded in the protocol or corresponding procedure, dated and signed by the person effecting the action and the person responsible for commissioning.

  • The CONTRACTOR shall deliver the Final Commissioning Protocol to the CLIENT that must contain at least the tests detailed in Annex X, at least [**] prior to the scheduled date of commencement commissioning.

  • The date of commissioning of the Project Facilities shall be the date on which such Commissioning Protocol is approved by the SPV (“Date of Commissioning’).

  • FINAL COMMISSIONING PROTOCOL Means the Commissioning Protocol delivered by the CONTRACTOR to the CLIENT at least one month prior to the scheduled date for commencement of the commissioning.

  • Users will also be asked to detail the methods used to apply the final sludge to soil.Upon sale of the biodigester installations, and associated accessories, the user will sign a Sales Contract, and upon commissioning, a Commissioning Protocol.

  • Tasks allocated: • If manure-fed biogas digester is purchased, users are responsible for recording the quantity of manure fed into the digester, and for ensuring that slurry is applied to agricultural land aerobically (following the training provided); • Maintain the operation of the biogas systems; • Correctly and accurately complete/provide information for completion of the Sales Contract and Commissioning Protocol.

  • Note that this is despite having an Independent Commissioning Protocol (Annexure XX) although it is not published on its website as required in terms of the Commissioning Regs.

  • During the fourth quarter of 2007, the SDA implemented a draft Commissioning Protocol, facilitated by NJIT, which provides architects and engineers with guidance in developing designs that meet the standards established in the 21st Century Schools Design Manual.

  • However, one of the broadcasters, e-tv, mentions “inflation” in its Commissioning Protocol (Annexure XX) while none of the SABC’s, StarSat’s nor DStv/M-Net’s Commissioning Protocols (Annexures XX and XX) mentions CPIX or the retail prices index3.


More Definitions of Commissioning Protocol

Commissioning Protocol shall have the meaning given in Clause 7.6(b)(ii) (Manuals and Protocols).
Commissioning Protocol has the meaning given to it in the PPA; "Confidential Information" has the meaning given to it in Article 13;
Commissioning Protocol means the protocol that ensures that technical and operational information meets the principles detailed at Schedule I - Particulars of Vessel and Schedule V – Minimum Test Requirements and allows the Vessel to be delivered in FSRU Mode and shall include, in reasonable detail, technical and operational information relevant to such testing. “Compliance Regulations” is defined in Clause 28.2(a). ​ ​ ​ ​ 12 ​ ​ ​ ​ ​ ​ ​
Commissioning Protocol means the testing, documentation and functional requirements as set out in Schedule P;
Commissioning Protocol has the meaning given to such term in Section l(c)(i) of Schedule 14.
Commissioning Protocol has the meaning given to it in the Charter Agreement.

Related to Commissioning Protocol

  • Protocol means, in respect of any category of object and associated rights to which this Convention applies, the Protocol in respect of that category of object and associated rights;

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Kyoto Protocol means the protocol to the UNFCCC adopted at the Third Conference of the Parties to the UNFCCC in Kyoto, Japan on 11 December 1997 as may be amended;

  • Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;

  • Training program means an NCA-approved Iowa college, the Iowa law enforcement academy or an Iowa hospital approved by the department to conduct emergency medical care training.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Aircraft Protocol means the official English language text of the Protocol to the Convention on International Interests in Mobile Equipment on Matters Specific to Aircraft Equipment, adopted on November 16, 2001, at a diplomatic conference in Cape Town, South Africa, and all amendments, supplements, and revisions thereto (and from and after the effective date of the Cape Town Treaty in the relevant country, means when referring to the Aircraft Protocol with respect to that country, the Aircraft Protocol as in effect in such country, unless otherwise indicated).

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.

  • Training Plan means the plan that outlines what training and assessment will be conducted off-the-job and what will be conducted on-the-job and how the Registered Training Organisation will assist in ensuring the integrity of both aspects of the training and assessment process.

  • Step therapy protocol means a protocol or program that establishes the specific

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • ERCOT Protocols means the document adopted by ERCOT, including any attachments or exhibits referenced in that document, as amended from time to time, that contains the scheduling, operating, planning, reliability, and settlement (including customer registration) policies, rules, guidelines, procedures, standards, and criteria of ERCOT. For the purposes of determining responsibilities and rights at a given time, the ERCOT Protocols, as amended in accordance with the change procedure(s) described in the ERCOT Protocols, in effect at the time of the performance or non-performance of an action, shall govern with respect to that action.

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Contractor System means the information and communications technology system used by the Contractor in performing the Services including the Software, the Contractor Equipment and related cabling (but excluding the Authority System).

  • Quality system means documented organizational procedures and policies: internal audits of those policies and procedures: management review and recommendation for quality improvement.”

  • Quality Surveillance Engineer / Inspector means any person appointed by or on behalf of the Purchaser to inspect or carry out quality surveillance on supplies, stores or work under the Contract or any person deputed by the Quality Surveillance Engineer for the said purpose.

  • Interconnection Study means any of the studies defined in the CAISO’s Tariff or any Transmission/Distribution Owner’s tariff that reflect methodology and costs to interconnect the Facility to the Transmission/Distribution Owner’s electric grid.

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.