Energy efficiency improvement project definition

Energy efficiency improvement project means the
Energy efficiency improvement project means the installation or modification of one or more energy efficiency improvements that decrease or support the decrease of energy consumption or demand for energy through the use of efficiency technologies, products or activities and incidentals which are necessary, useful or desirable for any such improvements and which installation or modification has a useful life of not less than 10 years.
Energy efficiency improvement project means the installation or modification of [real property or the facilities or equipment on the real property that is designed to reduce the energy consumption of the real property.] one or more energy efficiency improvements and incidentals which are necessary, useful or desirable for any such improvements and which installation or modification has a useful life, as estimated by a governing body, of not less than 10 years.

Examples of Energy efficiency improvement project in a sentence

  • Type II: Energy efficiency improvement project activities that reduce energy consumption, on the supply and/or demand side, with a maximum energy saving of 60 GWh per year (or an appropriate equivalent) in any year of the crediting period.

  • The PPs may also use other conversion factors determined as per therequirements, but shall then justify why the chosen conversion factor is more appropriate to the project activity.♦ Type II: Energy efficiency improvement project activities that reduce energy consumption , on the supply and/or demand side, with a maximum output of 60 GWh per year (or an appropriate equivalent) in any year of the crediting period.

  • The PPs may also use other conversion factors determined as per the requirements, but shall then justify why the chosen conversion factor is more appropriate to the project activity.♦ Type II: Energy efficiency improvement project activities that reduce energy consumption , on the supply and/or demand side, with a maximum output of 60 GWh per year (or an appropriate equivalent) in any year of the crediting period.

  • The project includes the following sectoral scopes and project type – • Improved cookstoves – 3 (Energy demand); Type II - Energy efficiency improvement project.

  • Small-scale project type applicable to this generic CPA (according to Standard: CDM project standard for programmes of activities, vers.02.0)● Type II: Energy efficiency improvement project activities that reduce energy consumption, on the supply and/or demand side, with a maximum energy saving of 60 GWh per year (or an appropriate equivalent) in any year of the crediting period.

  • II) Energy efficiency improvement project activities which reduce energy con- sumption, on the supply and/or demand side, by up to the equivalent of 15 GWh per year; orIII)Other project activities that both reduce anthropogenic emissions by sources and directly emit less than 15 thousand tonnes (kt) of carbon diox- ide equivalent annually.12 These three types are interpreted by the EB as mutually exclusive.

  • YearImproved Cookstoves15,00025,00035,000410,000510,000610,000710,000 YearSolar Lighting systems1550,0002650,0003650,0004650,0005650,0006650,0007650,000 1.2 Sectoral Scope and Project Type The project includes the following sectoral scopes and project type – • Improved cookstoves – 3 (Energy demand); Type II - Energy efficiency improvement project.

  • Type (i): Renewable energy project activities with a maximum output capacity equivalent of up to 15 megawatts (or an appropriate equivalent); Type (ii): Energy efficiency improvement project activities which reduce energy consumption, on the supply and/or demand side, by up to the equivalent of 15 gigawatthoursshall not preclude other types of small -scale CDM project activities.

  • Whether the energy savings achieved through the Energy efficiency improvement project can be quantified without incurring any additional expenditure for the entire crediting period of 7-10 years.

  • Type II: Energy efficiency improvement project activities that reduce energy consumption, on the supply and/or demand side, with a maximum output of 60 GWh per year (or an appropriate equivalent) in any year of the crediting period.


More Definitions of Energy efficiency improvement project

Energy efficiency improvement project means an undertaking involving such activities including, but not limited to, improvement in maintenance or other practices, monitoring systems, specific processes, or new or improved technologies, in order to increase energy efficiency at a facility.
Energy efficiency improvement project means the installation or modification of one or more energy efficiency improvements and incidentals which are necessary, useful or desirable for any such improvements and which installation or modification has a useful life, as estimated by the Program Administrator based on industry best practice, of not
Energy efficiency improvement project means the installation or modification of one or more energy efficiency improvements that decrease or support the decrease of energy consumption or demand for energy through

Related to Energy efficiency improvement project

  • Energy efficiency improvement means equipment, devices, or materials intended to decrease energy consumption, including, but not limited to, all of the following:

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Energy efficiency project means an energy efficiency measure or combination of measures undertaken in accordance with a standard offer or market transformation program.

  • Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);

  • Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.

  • Development Project means a project for the development of land within a

  • Redevelopment project means any work or undertaking

  • Project Improvements means site improvements and facilities that are:

  • Needs Improvement the Educator’s performance on a standard or overall is below the requirements of a standard or overall, but is not considered to be unsatisfactory at this time. Improvement is necessary and expected.  Unsatisfactory: the Educator’s performance on a standard or overall has not significantly improved following a rating of needs improvement, or the Educator’s performance is consistently below the requirements of a standard or overall and is considered inadequate, or both.

  • Home improvement means the remodeling, altering,

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Quality Improvement means a focus on activities to improve performance above minimum standards and reasonably expected levels of performance, quality and practice.

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • Subprojects means more than one such Subproject.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Subproject means a development activity proposed by a Beneficiary under Part A.2 (d) of the Project and financed or to be financed through a Subproject Grant (as hereinafter defined) made out of the proceeds of the Development Credit;

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • Ongoing Project means a multi-year project undertaken by a Company in fulfilment of its CSR obligation having timelines not exceeding three years excluding the financial year in which it was commenced, and shall include such project that was initially not approved as a multi-year project but whose duration has been extended beyond one year by the board based on reasonable justification;

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Infrastructure project means any construction or acquisition of treatment works,

  • Site Improvements means any construction work on, or improvement to, streets, roads, parking facilities, sidewalks, drainage structures and utilities.

  • The Works/Project means the works to be executed or done under this contract.

  • Minimum Improvements means the acquisition of land and construction of a 64-unit market rate residential apartment building and related improvements. The Minimum Improvements are more fully depicted in Exhibit B, which is attached hereto and incorporated herein.