Examples of Burnley Tunnel in a sentence
Burnley Tunnel and that part of the Southern Link leading out of that Tunnel between the eastern portal of that Tunnel and Burnley Street.
Southern Link Section 5, between Punt Road and Burnley Street other than that part of the Southern Link leading out of the Burnley Tunnel between the eastern portal of that Tunnel and Burnley Street.
That the development will not cause changes to groundwater conditions that will result in adverse effect on the Burnley Tunnel.
Prior to the commencement of the development, excluding demolition works, an Engineering report from a suitably qualified Engineer outlining the design, management and construction techniques to be implement prior, during and following excavation to prevent any impact on the Burnley Tunnel is to be submitted to VicRoads and CityLink for approval.
That part of the Link road between Burnley Street and Punt Road and including that part of the Link road –(a) between Punt Road and the exit to Boulton Parade, other than the eastbound carriageways; and(b) comprising Boulton Parade, other than:(i) the eastbound carriageways between Burnley Street and Punt Road; and(ii) that part of the Link road being the Burnley Tunnel and that part of the Link road leading out of that Tunnel between the eastern portal of that Tunnel and Burnley Street.
To meet this obligation, Transurban Group has contracted several specialist organisations to monitor emissions of carbon monoxide, oxides of nitrogen and particulate matter from the Domain and Burnley Tunnel ventilation stacks.
In the prior period, the Burnley Tunnel commenced operations on 28 December 2000 and therefore only contributed to transaction volumes for half that period.Although transaction volumes for the six months ended 30 June 2002 were 7.1 per cent above the six months ended 30 June 2001, usage during the latter period was adversely impacted by the closure of the Burnley Tunnel in February 2001 and the subsequent repair works over the period from March to June.
Schematic of Burnley Tunnel showing use of recycled water to recharge groundwater (not to scale).less interactive and dynamic (Danziger, 2008).
However, Transurban and the TOJV are continuing discussions in an attempt to bring about a negotiated settlement on all matters in dispute between them.(b) Burnley TunnelA programme of enhancements to the arch toe of the Burnley Tunnel has been recommended by the TOJV.
The delays to the Completion of Southern Link have been caused by the need to undertake extensive remediation of the floor slabs of the Burnley Tunnel following the occurrence of several failures during testing of the floor in September1999.