Structural Excavation Sample Clauses

The Structural Excavation clause defines the requirements and procedures for digging and removing earth or rock to create spaces for building foundations and other structural elements. It typically outlines the depth, dimensions, and methods to be used, as well as safety measures and handling of unexpected site conditions such as groundwater or unstable soil. This clause ensures that excavation work is performed safely and according to design specifications, thereby preventing structural failures and minimizing construction risks.
Structural Excavation. 220.00 Site Drainage & Underground Utilities................... 250.00 Site Improvements....................................... 260.00 Landscaping............................................. 280.00 Precast Concrete Exterior Wall/Foundation Wall Systems.. 300.00 Foundations............................................. 310.00 Interior Concrete Slabs................................. 320.00 Building System......................................... 500.00 Miscellaneous & Ornamental Metals....................... 550.00 Building Insulation..................................... 730.00 Thermal & Moisture Protections.......................... 780.00 Exterior Doors, Frames & Hardware....................... 800.00 Specialty Doors......................................... 830.00 Office Finishes......................................... 900.00 Loading Dock Equipment (Levelers)....................... 1185.00 Plumbing................................................ 1500.00
Structural Excavation. Backfill

Related to Structural Excavation

  • Structural 3.4.1. Layout structural systems with dimensions and floor elevations. Identify structural systems (including pre-cast, structural steel with composite deck, structural steel bar joists); with preliminary sizing identified. 3.4.2. Identify foundation systems (including fill requirements, piles, caissons, spread footings); with preliminary sizing identified.

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Interior The insurance covers personal property normally contained in the vehicle and belonging to the owner of the vehicle or a member of his or her household. The insurance covers loss of, and damage to, the property if the damage occurs in connection with: - a compensable fire, theft, or vehicle damage - a sudden and unforeseen external event - theft by the renter - damage in connection with a traffic accident. The insurance does not apply to: - theft-prone property - cash and valuables - property belonging to the renter. - Personal movables must be kept locked in the vehicle. If the requirements are not met, the compensation may be reduced, or the deductible increased. See section

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;