Design Team Assumptions Sample Clauses

Design Team Assumptions. 11. Floor and Brace Framing within the cores for electrical rooms at Level 300 and above.
AutoNDA by SimpleDocs
Design Team Assumptions. 4. Four (4) each; positive pressure fans/blower units (two main units and two reserve units to provide redundancy) to include associated PVC/spiral seam ducting, flexible tubing, sensors/controls, differential pressure switches, connection to cushions, seals, etc. The planned location for these units is on the catwalk level.
Design Team Assumptions. 2. Permanent steel (compression struts and cable crossover connections) will have prime and interior finish paint per Specification Section 09 9123 of the Project Manual.
Design Team Assumptions. 6. The scope of precast walls is captured in the 100% GMP Estimate as detailed on Exhibit BP1.03.01
Design Team Assumptions. 11. The bowl ductwork scope included in the GMP is based on Exhibit 1.04.01.
Design Team Assumptions. 6. Panning under sanitary waste lines over food preparation areas are included in areas shown in Exhibit 1.07.03.
Design Team Assumptions. 1. Fire suppression spaced at 6’ o.c. is included surrounding the Al Davis Memorial Torch.
AutoNDA by SimpleDocs
Design Team Assumptions. 8. Miscellaneous solid plate metal panels at the following locations: retractable field pit fascia, horizontal soffits at VIP Level exterior entrances, horizontal soffits at Main Concourse exterior entrances, and horizontal soffit above operable / fixed panels on the North end of the stadium.
Design Team Assumptions. 8. Guide rail supports will be located within the 2-hour rated shaft enclosure.
Design Team Assumptions. 3. Drainage of the Field Tray draining directly into the Storm Drain system is included.
Time is Money Join Law Insider Premium to draft better contracts faster.