Shutdown or Reconfiguration of Refinery Sample Clauses

Shutdown or Reconfiguration of Refinery. During any Renewal Term, ALON must deliver to HEP at least twelve months advance written notice of any planned shut down or reconfiguration (excluding planned maintenance turnarounds) of the Refinery or any portion of the Refinery that would reduce the Refinery’s output. ALON will use its commercially reasonable efforts to mitigate any reduction in the Minimum Volume Commitment that would result from such a shut down or reconfiguration. If ALON shuts down or reconfigures the Refinery or any portion of the Refinery (excluding planned maintenance turnarounds) and reasonably believes in good faith that such shutdown or reconfiguration will jeopardize its ability to satisfy the Minimum Volume Commitment, then within 90 days of the delivery of the written notice of the planned shut down or reconfiguration, ALON shall (i) propose a new Minimum Volume Commitment, such that the ratio of the volumes of Refined Products to be transported on the Refined Product Pipelines following such shut down or reconfiguration to the anticipated production level of the Refinery following the shut down or reconfiguration will be approximately equal to the ratio of the original volumes of Refined Products transported on the Refined Product Pipelines under this Agreement to the original production level of the Refinery under this Agreement and (ii) propose the date on which the new Minimum Volume Commitment shall take effect. Unless objected to by HEP within 60 days of receipt by HEP of such proposal, such new Minimum Volume Commitment shall become effective as of the date proposed by ALON. To the extent that HEP does not agree with ALON’s proposal, any changes in ALON’s obligations under this Agreement, or the date on which such changes take effect, the parties will negotiate in good faith to resolve such disagreement within 30 days of notice thereof by HEP. In the event the parties are unable to resolve such disagreement(s) within such time period, the new Minimum Volume Commitment shall be determined by binding arbitration in accordance with Section 21(g) of this Agreement and the arbitrators shall consider the factors set forth in this Section 10(a) in resolving such disagreement. The provisions of this Section 10(a) shall only apply during a Renewal Term and do not apply to the Initial Term of this Agreement.
AutoNDA by SimpleDocs

Related to Shutdown or Reconfiguration of Refinery

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • FABRICATION Making up data or results and recording or reporting them.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where EveryCall has requested an Unbundled Loop and BellSouth uses Integrated Digital Loop Carrier (IDLC) systems to provide the local service to the end user and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to EveryCall. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for EveryCall (e.g. hairpinning):

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

Time is Money Join Law Insider Premium to draft better contracts faster.