Sanitary Sewer Pump Station Sample Clauses

Sanitary Sewer Pump Station. During the course of the Project the Developer may be required to install sanitary sewer pump station serving a portion of the Project. The sanitary sewer pump station if installed, will be dedicated to public use and conveyed to the Township when the infrastructure it is complete and the pump station is operational.
AutoNDA by SimpleDocs
Sanitary Sewer Pump Station. In conjunction with the development of Phase 3A (but not otherwise), the Commercial Developer shall upgrade an existing sanitary sewer pump station on the City Lot, in the approximate location indicated on Exhibit E (the “Existing Pump Station”). By execution of this Amendment, the City hereby grants the Commercial Developer all easement rights, including but not limited to access, utility, and temporary construction easements, in and over the City Lot as may be necessary in order for the Existing Pump Station to be upgraded. The Commercial Developer shall pay all of the initial costs associated with the design and installation/upgrading of the Existing Pump Station (the “Pump Station Costs”), which costs shall be apportioned between the City, the Commercial Developer, and the Residential Developer based on Equivalent Residential Units (ERU) served, as follows:  City: 325 ERU 57%  Residential Developer: 155 ERU 27%  Commercial Developer: 92.4 ERU 16%  Total: 572.4 ERU 100% Upon completion of the Existing Pump Station to the reasonable satisfaction of the City, the Commercial Developer shall compile the Pump Station Costs and present the City with a detailed invoice setting forth said costs and the respective shares of the City and the Residential Developer related to same (based on the above percentages). Within thirty (30) days of the receipt of said invoice, the City shall reimburse the Commercial Developer for (i) its share of the Pump Station Costs, and (ii) the Residential Developer’s share of the Pump Station Costs (the “Residential Share”). As a condition precedent to the issuance of individual building permits for homes to be constructed within Phase 4, the Residential Developer shall reimburse the City a pre-determined portion of the Residential Share for each building permit issued, calculated by dividing the total Pump Station Costs by the total ERU served as shown above.

Related to Sanitary Sewer Pump Station

  • Sanitary Sewer Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all possible control as established or attained during preliminary survey, including but not limited to – section corners, property irons, intersection center-center irons, other set monuments ▪ benchmarks, including TBM set with preliminary survey ▪ center of manholes ▪ end of manhole stubs (when longer than five feet)

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Sanitary Facilities (as per Occupational Health and Safety [Building Industry] Regulations 1985)

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 xxxxx per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts. An adequately sized 3 phase “wye” wound step down transformer shall be provided to supply 208/120-volt, 3 phase power, for lighting, general service receptacles and dedicated computer based office equipment. Dedicated, isolated ground circuits shall be supplied from separate isolated ground power distribution panel(s). Lighting circuits shall be supplied from separate lighting panel(s). Panels shall have 20% spare capacity and be complete with 10% spare breakers of each size, but no less than 1 spare. No more than 4 duplex receptacles shall be connected to any single 20-amp dedicated isolated ground circuit or general service circuit.

Time is Money Join Law Insider Premium to draft better contracts faster.