Post Construction Monumentation Sample Clauses

Post Construction Monumentation. AKS shall verify the disturbance (or non-disturbance) of existing monuments previously documented and recorded under Task 1.4. A post-construction survey shall be recorded with Clackamas County following construction and shall include all monuments replaced during construction and the verified locations of undisturbed monuments. If any impacts to existing monuments occur, AKS shall submit a supplement for work necessary to reset all monuments disturbed during construction.
AutoNDA by SimpleDocs
Post Construction Monumentation. Provide post-construction survey monumentation for property pins that are disrupted by construction activities. Monumentation shall be documented per City approved standard format. Completion time: The Consulting Engineer hereby agrees to complete preliminary plans suitable for a public information meeting including easement and right-of-way descriptions and drawings (Task I) by September 30, 2014 and to complete all work necessary to and including preparation of final plans (Task II) by March 31, 2015. Affinis Corp. Supplemental Agreement Two Date: 12/4/2013 Client: Overland Park, KS Project: 000xx Xxxxxx (Metcalf to Nall) Exhibit B Made By: RBF Principal Project Sr. Project Project Design CADD Land Land Survey Crew Clerical LABOR DIRECT EXPENSES TOTAL Manager Engineer Engineer Technician II Technician II Surveyor II Surveyor I Member II COSTS ITEM COST FEE
Post Construction Monumentation. Provide post-construction survey monumentation for property pins that are disrupted by construction activities. Monumentation shall be documented per City approved standard format. Completion time: The Consulting Engineer hereby agrees to complete preliminary plans suitable for a public information meeting including easement and right-of-way descriptions and drawings (Task I) by December 31, 2014 and to complete all work necessary to and including preparation of final plans (Task II) by October 31, 2015. Affinis Corp. Date: 1/29/2014 Client: Overland Park, KS Contract Agreement Project: 000xx Xxxxxx (Xxxx to Mission) Exhibit B Made By: RBF Principal Project Sr. Project Project Design CADD Land Land Survey Crew Clerical LABOR DIRECT EXPENSES TOTAL Manager Engineer Engineer II Technician II Technician II Surveyor II Surveyor I Member II COSTS ITEM COST FEE Tasks $208.00 $165.00 $192.00 $135.00 $125.00 $80.00 $145.00 $95.00 $90.00 $70.00 TASK I. PRELIMINARY DESIGN

Related to Post Construction Monumentation

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Post-Construction Phase A. Upon written authorization from Owner during the Post-Construction Phase, Engineer shall:

  • DIRECT CONSTRUCTION COST Direct Construction Cost means the sum of the amounts that Contractor actually and necessarily incurs constructing the Project in strict compliance with the Construction Documents. Direct Construction Cost includes only the cost categories set forth in this Article and does not include the Pre-Construction Phase Fees or the Construction Phase Fees unless specifically noted. References in the UGSC to adjustments in “cost” or “costs” mean the Direct Construction Cost.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.

  • Construction and Maintenance There are on-going maintenance, renovation and construction projects taking place in and around the residences. The work typically takes place during regular business hours, but may begin earlier or extend into evenings or weekends. On-going construction or renovation projects will continue through midterm and final exam periods. The University will take measures to ensure that prudent construction practices are followed, but there may be noise, dust and temporary interruption of some services. Residents may be required to temporarily or permanently relocate to facilitate construction or renovation to their residence area. There will be no compensation or reduction to your residence fees due to disruption and/or relocation.

  • Special Construction If, after an order is placed, Xxxxxxx finds that third-party special construction services are needed to build, configure or install any additional facilities and/or equipment necessary for Verizon to provide Access service, Verizon will notify the Customer of any such special construction charges. If Customer does not accept the special construction charges, Customer may terminate the order(s) affected by the special construction charges, with no cancellation fee(s).

Time is Money Join Law Insider Premium to draft better contracts faster.