Development plan of the project Sample Clauses

Development plan of the project. According to the development and utilisation plan in 2016, the project planned to use water pumps to extract brine at the site of the Lakkor Tso Salt Lake, and to build a salt pan on the east bank of the salt lake. The brine would be transported to the salt pan through pipes to obtain concentrated lithium brine after solar evaporation. The brine would then be transported to Golmud by vehicles. Lithium carbonate (and potassium fertiliser) would be produced in the Golmud Zangqing Industrial Park with a scale of 10,000 tonnes per year. After on-site investigations, technical and experimental studies, external technical experts and the Company’s technical team came to the view that the construction scale of the project has significant room for expansion. There is also a possibility of major adjustments to the mining process and technology. A more environmentally friendly and economical hybrid process combining “adsorption method + membrane process” can be adopted, i.e., the brine extracted from the salt lake will directly return to the lake area after adsorbing lithium ions. The lithium-containing eluate will go through a series of process including saturation and impurity removal (removing calcium, magnesium and boron) to produce and prepare for lithium products. This process is mature, with low implementation difficulties and a short construction period. If the hybrid process combining “adsorption method + membrane process” is adopted, the planned output of Phase 1 of the project will be adjusted to 20,000 tonnes of lithium carbonate per year, and the output is planned to raise to 50,000 tonnes of lithium carbonate per year after Phase 2 has completed construction and commenced production. It is expected that the project has better economic efficiency than the original plan. After the completion of the acquisition, the Company will decide the specific development plan according to salt lake development policies in Tibet. The Company may also implement the approved plan first, while beginning feasibility study, approval and construction of the new plan. In general, the future construction plan will be determined according to the principle of being beneficial to environmental protection, full utilisation of resources, and maximisation of economic and social benefits.
AutoNDA by SimpleDocs

Related to Development plan of the project

  • Development of the Project 4.1 TSP's obligations in development of the Project: Subject to the terms and conditions of this Agreement, the TSP at its own cost and expense shall observe, comply with, perform, undertake and be responsible:

  • Development of the Property Except as modified by this Agreement, the Development and the Property will be developed in accordance with all applicable local, state, and federal regulations, including but not limited to the City’s ordinances and the zoning regulations applicable to the Property, and such amendments to City ordinances and regulations that that may be applied to the Development and the Property under Chapter 245, Texas Local Government Code, and good engineering practices (the “Applicable Regulations”). If there is a conflict between the Applicable Regulations and the Development Standards, the Development Standards shall control.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • PROFESSIONAL DEVELOPMENT AND EDUCATIONAL IMPROVEMENT A. The Board agrees to implement the following:

  • Development Program A. Development activities to be undertaken (Please break activities into subunits with the date of completion of major milestones)

  • Project Implementation 2. The Borrower shall:

  • Development Work Do, or cause to be done, such development and other work as may be reasonably necessary to protect from diminution and production capacity of the Mortgaged Property and each producing well thereon.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Construction Activities Please list all major construction activities, both planned and completed, to be performed by Seller or the EPC Contractor. Activity EPC Contractor / Subcontractor Completion Date __/__/____ (expected / actual) __/__/____ (expected / actual)

Time is Money Join Law Insider Premium to draft better contracts faster.