Control of Sulfur Oxides (SOx) Emissions Sample Clauses

Control of Sulfur Oxides (SOx) Emissions. The Parties agree that based on a joint meeting with the Maricopa County Air Quality Department (“MCAQD”), that MCAQD will issue individual air quality permits to the Plant and the Processing Facility; however, the allowable total emission limitations will be shared between both facilities. These limitations will be established based on the potential to emit for the Plant only; which will allow the Plant to operate continuously in the event that the Project does not operate for twelve (12) months. The emissions limits for sulfur oxide (“SOx”) emissions is 91 tons per year (“tpy”) (twelve (12) month rolling total) and 18,500 pounds per month (“lbs/month”), and the Plant and the Processing Facility will add their SOx emissions together to determine compliance with these limits. The monthly SOx emissions should be calculated and then forwarded to Phoenix and the Developer to complete their respective monthly emission reports and the annual emission inventory. The flares of the Plant and the Processing Facility will be allowed to emit up to 88.76 tpy (twelve (12) month rolling total) and 18,129 lbs/month of SOx. The remaining 2.24 tpy and 3711 lbs/month of the permitted SOx emission limits will be for the remaining sources of SOx at the Plant. The Parties acknowledge that the total SOx emissions from both the Processing Facility and the Plant is a function of the volume of Biogas and Acid Phase Gas generated by the Plant and the hydrogen sulfide (“H2S”) concentration level of the Biogas and Acid Phase Gas, which is controlled by Phoenix through the addition of ferric chloride to the incoming sludge to the Plant. Therefore the Parties agree that Developer may rely on Phoenix’ operation of the Plant to regulate and reduce the Processing Facility’s SOx emissions. In recognition of these circumstances and conditions, to the extent allowed by law Phoenix shall (i) affirmatively take responsibility for all exceedances of SOX emissions from the Processing Facility, and either (ii) protect, defend, indemnify, and hold Developer, its directors, officers, employees, agents, representatives, co-ventures, tenants, contractors, and servants (the “Developer Indemnitees”), harmless from any and all costs, expenses, losses and liabilities that one or more Developer Indemnitees might incur relating to any exceedances of the Processing Facility’s SOx emissions or (iii) or otherwise fully compensate the Developer Indemnified Parties. If Phoenix does not comply in full with the i...
AutoNDA by SimpleDocs

Related to Control of Sulfur Oxides (SOx) Emissions

  • Dangerous Goods, Special Wastes, Pesticides and Harmful Substances Where employees are required to work with or are exposed to any dangerous good, special waste, pesticide or harmful substance, the Employer shall ensure that the employees are adequately trained in the identification, safe handling, use, storage, and/or disposal of same.

  • Non-Emergency Transportation Routine medical transportation to and from Medicaid-covered scheduled medical appointments is covered by the non-emergency medical transportation (NEMT) broker Medicaid program. This includes transportation via multi-passenger van services and common carriers such as public railways, buses, cabs, airlines, ambulance as appropriate, and private vehicle transportation by individuals. The NEMT broker must approve ambulance, multi-passenger van services, and transportation by common carriers. The MCO must inform enrollees of how to access non-emergency transportation as appropriate.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Unbundled Loop Concentration (ULC) System 2.5.1 BellSouth will provide to <<customer_name>> Unbundled Loop Concentration (ULC). Loop concentration systems in the central office concentrate the signals transmitted over local loops onto a digital loop carrier system. The concentration device is placed inside a BellSouth central office. BellSouth will offer ULC with a TR008 interface or a TR303 interface.

  • Infection Control Consistent with the Centers for Disease Control and Prevention Guideline for Infection Control in Health Care Personnel, and University Policy 3364-109-EH-603, the parties agree that all bargaining unit employees who come in contact with patients in the hospital or ambulatory care clinics will need to be vaccinated against influenza when flu season begins each fall. The influenza vaccine will be offered to all health care workers, including pregnant women, before the influenza season, unless otherwise medically contraindicated or it compromises sincerely held religious beliefs.

  • Compaction of surfaces 5 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density. m2 96

  • Cooperation on Preventing End User Fraud The Parties agree to cooperate fully with one another to investigate, minimize, prevent, and take corrective action in cases of fraud.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

Time is Money Join Law Insider Premium to draft better contracts faster.