Construction, Operation, and Maintenance of Contractor’s Power System Sample Clauses

Construction, Operation, and Maintenance of Contractor’s Power System. The Contractor shall, and, if applicable, shall require each of its members or transmission agents to construct, operate, and maintain its power system in a manner which, as determined by Western, will not interfere with the operation of the system of Western or its transmission agents over which electric services are furnished to the Contractor under the contract, and in a manner which will coordinate with the protective relaying and other protective arrangements of the system(s) of Western or Western’s transmission agents. Western may reduce or discontinue furnishing services to the Contractor if, after notice by Western, the Contractor fails or refuses to make such changes as may be necessary to eliminate an unsatisfactory condition on the Contractors power system which is determined by Western to interfere significantly under current or probable conditions with any service supplied from the power system of Western or from the power system of a transmission agent of Western. Such a reduction or discontinuance of service will not relieve the Contractor of liability for any minimum charges provided for in the contract during the time said services are reduced or discontinued. Nothing in this Provision shall be construed to render Western liable in any manner for any claims, demands, costs, losses, causes of action, damages, or liability of any kind or nature arising out of or resulting from the construction, operation, or maintenance of the Contractors power system.
AutoNDA by SimpleDocs

Related to Construction, Operation, and Maintenance of Contractor’s Power System

  • Construction and Maintenance There are on-going maintenance, renovation and construction projects taking place in and around the residences. The work typically takes place during regular business hours, but may begin earlier or extend into evenings or weekends. On-going construction or renovation projects will continue through midterm and final exam periods. The University will take measures to ensure that prudent construction practices are followed, but there may be noise, dust and temporary interruption of some services. Residents may be required to temporarily or permanently relocate to facilitate construction or renovation to their residence area. There will be no compensation or reduction to your residence fees due to disruption and/or relocation.

  • Operation and Maintenance 17.1 O&M obligations of the Concessionaire

  • Repairs and Maintenance The Tenant shall (a) take good care of the Apartment and all equipment and fixtures in it; (b) promptly make all necessary repairs and replacements whenever the need results from the Tenant's act of neglect or the neglect of Tenant’s family members, guests, visitors or contractors (if consented to by Landlord); (c) keep the Apartment and any other part of the building used by the Tenant as clean and safe as possible; and (d) promptly notify the Landlord when there are conditions which need repair. Landlord shall have a reasonable amount of time to make repairs. Tenant shall be responsible for reimbursing the Landlord for the cost of any repairs that are not "normal wear and tear" repairs, any such costs shall be considered additional rent; (e) shall not attach to, hang from or place anything on the railings of the patio or deck; and ( f ) Tenant agrees not to install any partition walls. No outside contractor is authorized to perform any services at the Apartment or apartment complex unless approved in writing by a representative of the Landlord. If Tenant contracts for any such services without written consent of the Landlord, Tenant shall be wholly responsible for the payment for any such service and shall hold the Landlord harmless against any claim made by a contractor who performs any such service at the request of the Tenant. Tenant shall also be responsible for returning the apartment back to its original condition, or else shall be liable to the Landlord for the costs incurred for the Landlord to do so after Tenant vacates.

  • Installation and Maintenance Except for the bi‐directional and production metering equipment owned by the City, all equipment on Customer’s side of the delivery point, including the required disconnect device, shall be provided and maintained in satisfactory operating condition by Customer and shall remain the property and responsibility of the Customer. The City will bear no responsibility for the installation or maintenance of Customer’s equipment or for any damage to property as a result of any failure or malfunction thereof. The City shall not be liable, directly or indirectly for permitting or continuing to allow the interconnection of the Facility or for the acts or omissions of Customer or the failure or malfunction of any equipment of Customer that causes loss or injury, including death, to any party.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Operations and Maintenance Pursuant to Section 10.5 of this Agreement, Developer shall pay the reasonable expenses (including overheads) for the operation, maintenance, repair and replacement of Transmission Owner’s Attachment Facilities and incremental operating and maintenance expenses incurred in association with System Upgrade Facilities, if and to the extent provided for under Attachment S. For Transmission Owner’s Attachment Facilities, such expenses are calculated as follows:

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

  • Repair and Maintenance Except in the case of damage to or destruction of the Leased Premises, the Building, the Outside Areas or the Property caused by an act of God or other peril, in which case the provisions of Article 10 shall control, the parties shall have the following obligations and responsibilities with respect to the repair and maintenance of the Leased Premises, the Building, the Outside Areas, and the Property.

  • Installation, Inspection, and Maintenance The Contractor is responsible for installation and maintenance of the BMPs as a part of its Bid. The Design Professional shall obtain the services of a qualified testing laboratory to inspect the BMPs in accordance with the permits, the costs of such inspections to be borne by the Owner. In the event of Abnormal Weather Conditions or force majeure, the Contractor shall be compensated for re-installation of BMPs at established Unit Prices.