ACCEPTANCE OF DEFECTIVE MATERIAL OR WORK Sample Clauses

ACCEPTANCE OF DEFECTIVE MATERIAL OR WORK. Instead of a direction under Clause 30.3 or 30.4, the Superintendent may notify the Contractor that the Principal elects to accept the material or work notwithstanding that it is Lihir Gold Limited Contract No LGL-MO-0107 Provision of Geothermal Coring Services Part III: General Conditions of Contract not in accordance with the Contract. In that event the resulting increase or decrease in the value to the Principal of the Works and any other loss suffered by the Principal shall be valued under Clause 40.5.
AutoNDA by SimpleDocs
ACCEPTANCE OF DEFECTIVE MATERIAL OR WORK. No amendment.

Related to ACCEPTANCE OF DEFECTIVE MATERIAL OR WORK

  • ACCEPTANCE OF DEFECTIVE OR NON-CONFORMING WORK 13.3.1 The State may accept defective or nonconforming Work pursuant to Paragraph 13.2.1

  • Defective Work Work that, for any reason, is not in compliance with the Contract Documents. Defective Work is usually identified in a Notice of Non-Compliant Work.

  • ACCEPTANCE OF NONCONFORMING WORK If the Owner prefers to accept Work that is not in accordance with the requirements of the Contract Documents, the Owner may do so instead of requiring its removal and correction, in which case the Contract Sum will be reduced as appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made.

  • Defective Product Seller must guarantee a return for all defective products. a) Goods rejected by Buyer for whatever reason shall be held, transported and/or stored at Seller’s sole expense. Seller shall promptly reimburse Buyer for any such expenses. B) Defective product purchase COD will be returned COD to Seller or COD check will be cancelled, at Buyer’s discretion. c) Seller is responsible for all costs associated RoHS noncompliance returns and will accept a full return for all parts not meeting RoHS compliance criteria if necessary. d) Seller is 100% responsible for all monetary and/or rework costs associated with product failures in addition to any further cost whatsoever associated with product failures. e) If suspect parts/counterfeit parts are furnished under this agreement such parts shall be impounded by Buyer. Buyer may provide a sample batch Supplier for verification and authentication. In addition, Buyer reserves the right to send such items to the appropriate manufacturer and appropriate authorities for investigation. f) Seller shall be liable for all costs relating to impound, investigation, removal, or replacement of suspect/counterfeit parts.

  • Notice of Defects If, based on Consulting Engineer/Architect's involvement during the construction phase, Consulting Engineer/Architect observes or otherwise becomes aware of any defect in the work, he shall give prompt written notice to City of such defects and their approximate location on the Project. However, Consulting Engineer/Architect shall not have control over or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions, inspections and programs in connection with the work, since these are solely the Contractor's responsibility under the contract for construction. Consulting Engineer/Architect shall not be responsible for the Contractor's schedules or failure to carry out the work in accordance with the Contract Documents. Consulting Engineer/Architect shall not have control over or charge of acts or omissions of the Contractor, Contractor's subcontractors, or their agents or employees.

  • OTHER WORK 14.1 Owner may perform other work related to the Project at the site by Owner’s own forces, have other work performed by utility owners or let other direct contracts. If the fact that such other work is to be performed is not noted in the Contract Documents, written notice thereof will be given to Construction Contractor prior to starting any such other work. If Construction Contractor believes that such performance will involve additional expense to Construction Contractor or require additional time, Construction Contractor shall send written notice of that fact to Owner and Design Professional within seven (7) calendar days of being notified of the other work. If Construction Contractor fails to send the above required seven (7) calendar days’ notice, Construction Contractor will be deemed to have waived any rights it otherwise may have had to seek an extension to the Contract Time or adjustment to the Contract Amount.

  • CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK 8.1 The Contractor shall be responsible for ensuring that no asbestos containing materials or work is included within the scope of the Work. The Contractor shall take whatever measures it deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement.

  • Rejection of Work Using the Notice of Non-Conforming Work procedures outlined in the General Conditions, the Design Professional shall reject work that does not comply with the requirements of the Contract Documents or that does not comply with the applicable laws and codes. The Design Professional shall have authority to order testing of the Work, as is provided in the Contract Documents or as otherwise required in its judgment, whether such work is fabricated, installed, or completed.

  • Warranty Work Failure by the Contractor to take corrective action within twenty four (24) hours after personal or telephonic notice by the County's OC Public Works on items affecting essential use of the facility, safety or the preservation of property, and within ten (10) calendar days following written notice on other deficiencies, will result in the County taking whatever corrective action it deems necessary. All costs resulting from such action by the County will be claimed against Contractor or, if necessary, the Contractor's Performance Bond.

  • No Additional Work or Material No claim for additional services, not specifically provided in this contract, performed or furnished by the contractor, will be allowed, nor may the contractor do any work or furnish any material not covered by the contract unless the work or material is ordered in writing by the Project Director and approved by the Agency Head.