Second specimen definition

Second specimen means a specimen that is sent to the Arizona State Laboratory for testing and recording of demographic information, after being collected:
Second specimen means a satisfactory specimen collected after a first specimen, on which the newborn screen- ing laboratory performs analyses to detect the presence of all of the disorders listed in R9-14-502(A) specimen that is sent to the screening laboratory for testing and recording of demographic information, after being collected:

Examples of Second specimen in a sentence

  • Second specimen with debond is tested by providing delamination as shown in Fig.2, Fig.3and Fig.5. Then to fine tune the load close to the failure and to capture load displacement response, third specimen is tested up to failure.

  • Testing should include a street canyon option for Wellington Road.

  • Figure 1b: Second specimen; note preparation artifact with nail overlying distal tip.The observation that children can regrow amputated fingertips has interested many researchers since this was first noted in the 1970s.

  • The applicant believes that failure to implement the proposed project will cause the current adult emergency department to continue to be congested.

  • Labeled as Post-transfusion 2 (after 24 hours):a) Second specimen are required post reaction, which are:- 8-10 mls of blood sample in EDTA tube- 10 mls of urine specimen for haemoglobinuria Important:The blood bag (with the remaining blood) and infusion set (with all attached labels) should be preserved for culture.

  • Second specimen does not belong to the type series at all!Now Sama (Sama et al., 2012) has accepted the infrasubspecific status of “var.

  • Second, specimen 6, with a 30 mm width gauge, but without glue coated edges, has been tested.

  • It is collected at the time of consultation, or as soon as the TB symptomatics is identified.✓ Second specimen or early morning specimen.

  • In addition to the financial benefits that children of EIA recipients miss due to their parent’s limited income, the negative per- ceptions surrounding savings and EIA policy prevent parents from teaching their children basic saving habits that could help these children to gain economic self- sufficiency.

  • The results of this series are illustrated in Table (3): Stress (Mpa)Specimen numberNumber of cycles(Nj)25* **A1, A1 , A1240000, 249000, 26000035* **A2, A2 , A2122000, 130000, 12800045* **A3, A3 , A351000, 49000, 4400055* **A4, A4 , A421000, 19000, 1800065* **A5, A5 , A55000, 5100, 540075* **A6, A6 , A61400, 1600, 2000* Second specimen, ** Third specimen at the same stress level.

Related to Second specimen

  • Substituted Specimen means a specimen with laboratory values that are so diminished that they are not consistent with oral fluid and which shall be deemed a violation of this policy, and shall be processed as if the test results were positive.

  • Plans and Specifications means the plans, drawings and specifications reasonably necessary to properly assess and review proposed Work prior to issuance of any approval that may be required under this Agreement;

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Split Specimen means a part of the oral fluid specimen in drug testing that is retained unopened for a confirmation test (if required) or in the event that the employee requests that it be tested following a verified positive test of the primary specimen or a verified Adulterated or Substituted Specimen test result.

  • Architect/Engineer or “A/E” means the Person identified in the Agreement responsible for providing professional design services and construction contract administration for the Project. The A/E shall be (1) a registered architect holding a license and certificate of authorization issued by the Ohio Architects Board pursuant to ORC Chapter 4703, (2) a landscape architect holding a license and certificate of authorization issued by the Ohio Landscape Architects Board pursuant to ORC Chapter 4703, or (3) a professional engineer or professional surveyor holding a license and certificate of authorization issued by the Ohio Engineers and Surveyors Board pursuant to ORC Chapter 4733. As used in the Agreement, the term A/E may include a criteria architect or engineer for a Design-Build project.

  • Certificate of Completion means the certificate of completion given by the Engineer-in-charge pursuant to clause 40 of these conditions;

  • Construction Completion Certificate means a document:

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Specimen means tissue, hair, or product of the human body capable of revealing the presence of drugs or their metabolites.

  • Standard Specifications means a compilation in book form of specifica- tions approved for general application and repetitive use;

  • Certificate of Substantial Completion means the certificate executed by the A/E, ODR and Contractor that documents to the best of A/E’s and ODR’s knowledge and understanding, Contractor’s sufficient completion of the work in accordance with the Contract, so as to be operational and fit for the use intended.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Punch List means the list of items, prepared in connection with the inspection of the Project by the Owner’s Representative or Architect in connection with Substantial Completion of the Work or a portion of the Work, which the Owner’s Representative or Architect has designated as remaining to be performed, completed or corrected before the Work will be accepted by the Owner.

  • Detailed Specifications means the specifications for materials and works as specified in PWD BSR/ issued under the authority of PWD/ or as implied/added to or superseded by the special conditions.

  • Architect means the person or other entity engaged by the PHA to perform architectural, engineering, design, and other services related to the work as provided for in the contract. When a PHA uses an engineer to act in this capacity, the terms “architect” and “engineer” shall be synonymous. The Architect shall serve as a technical representative of the Contracting Officer. The Architect’s authority is as set forth elsewhere in this contract.

  • Project Architect means the professional architect or engineer employed by the Owner as architect or engineer of record for the Project and its consultants.

  • TENDER SPECIFICATION means “Specific conditions, technical specifications, appendices, site information and drawing pertaining to the work in which the tenderers are required to submit their offer. Individual specification number will be assigned to each tender specification.

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).

  • Adulterated Specimen means a specimen that contains a substance that is not expected to be present in oral fluid, or contains a substance expected to be present but is at a concentration so high that it is not consistent with oral fluid.

  • Completion Schedule means the fulfilment of the Related Services by the Supplier in accordance with the terms and conditions set forth in the Contract;

  • Installation inspector means a person who, by reason of his knowledge of the physical sciences and the principles of engineering, acquired by a professional education and related practical experience, is qualified to supervise the installation of tank systems.

  • construction site means a workplace where construction work is being performed;

  • Architect/Engineer (A/E means a person registered as an architect pursuant to Tex. Occ. Code Ann., Ch. 1051, as a landscape architect pursuant to Tex. Occ. Code Ann., Ch. 1052, a person licensed as a professional engineer pursuant Tex. Occ. Code Ann., Ch. 1001, and/or a firm employed by Owner or Design-Build Contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.