Power Curve Test definition

Power Curve Test has the meaning assigned to it in the Offshore TSA;
Power Curve Test means the test conducted in accordance with Section 10.8 to determine the output performance of the Wind Turbines.
Power Curve Test or "PCT" means the tests conducted pursuant to the Power Curve Test Procedures attached as Exhibit H to the Supply Agreement.

Examples of Power Curve Test in a sentence

  • In case of demonstrated under-performance after the completion of the tests, the Supplier will have a period of 30 days from receiving the final Power Curve Test results (or response from the IE to the aforementioned clarifications) to carry on modifications in order to attend one of the following conditions: Analysis of the causes of that non-compliance and implementation of the modifications on the turbines aimed to solve that under-performance.

  • The Supplier will provide the required support (i.e. drawings, access to Turbines, and necessary information to perform the Power Curve Test) during the Power Curve Test in those activities which require the intervention on the TWTs, at no cost.

  • The results of the Power Curve Test will be available for the Parties not later than two (2) months after the date of the test completion.

  • Prior to starting any measurement test the IE conducting the measurement test shall prepare and deliver a written test plan to the Parties that (i) identifies the TWT(s) and the final position for the reference met mast(s), including the corresponding free sector and site calibration requirements, and (ii) describes the type and characteristics of the measurement equipment and verification methodology that will be employed by the IE during and in connection with the Power Curve Test.

  • It will be aimed at the completion of representative measurement sectors which allows for the execution of the subsequent Power Curve Test in a reasonable amount of time.

  • The new IE designated to perform the Power Curve Test has to be in the list of agreed IEs. In case of success of the re-test, the rest of wind turbines of the wind farm will be reviewed and the defined modifications will be implemented in those wind turbines which would benefit from such modifications.

  • The Power Curve Test will start not later than six (6) months after Project Substantial Completion and no earlier than thirty (30) days after Project Substantial Completion, considered that the Owner shall communicate the intention to perform the Power Performance Test at least 8 weeks before the commencement of the Test.

  • The Power Curve Test shall be performed under normal operating conditions in accordance with the Power Curve Test Procedures.

  • Upon completion of such repairs and replacements, Supplier may (within 90 days of the failure of the second Power Curve Test) request Owner to conduct a third Power Curve Test.

  • JournalThe Outlook/Exchange journal can be used to save a call journal created by estos ProCall.Copies of the estos UCServer journal entries are made for this purpose in this journal either by mouse click or automatically.

Related to Power Curve Test

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Subproject means a specific water and/or sanitation Subproject financed or to be financed by a Subproject Grant (as hereinafter defined) provided from the proceeds of the Credit under Part C.1 of the Project;

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Incurrence Test means the incurrence test set out in Clause 12.1 (Incurrence Test).

  • Subprojects means more than one such Subproject.

  • Plant Test Date or "PTD" means the date acceptance testing is performed with CLEC. "Point of Interface", "Point of Interconnection," or "POI" is a demarcation between the networks of two (2) LECs (including a LEC and CLEC). The POI is that point where the exchange of traffic takes place.

  • Acceptable earned value management system means an earned value management system that generally complies with system criteria in paragraph (b) of this clause.

  • Cannabis testing facility means an entity registered by

  • Completion Rate means the percentage of an apprenticeship cohort who receives a certificate of apprenticeship completion within 1 year of the projected completion date. An apprenticeship cohort is the group of individual apprentices registered to a specific program during a 1 year time frame, except that a cohort does not include the apprentices whose apprenticeship agreement has been cancelled during the probationary period or who have transferred.

  • Final Completion Date means the date on which Final Completion occurs.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Measurement Point means the emission source for which continuous emission measurement systems (CEMS) are used for emission measurement, or the cross-section of a pipeline system for which the CO2 flow is determined using continuous measurement systems;

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.

  • Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.