Non-Construction Costs definition

Non-Construction Costs means all costs, other than Construction Costs, incurred and to be incurred in constructing and operating the Project that are payable in whole or in part with proceeds of the Construction Facility, as more particularly described in the Budget.
Non-Construction Costs means those types of Costs that are not Construction Costs.
Non-Construction Costs means all costs, expenses and fees of any nature or type whatsoever (including financing costs, the cost of the Independent Certifier appointed in connection with the Project, but not including Construction Costs) properly incurred by Project Co in respect of the Project as set forth in the Financial Model, as reflected in column (E) of Table A1 for each period reflected thereon and as may be adjusted in accordance with the calculations set out in Section 2.2 (h) (ii) (B) and reflected in column (E-1) of Table B3.

Examples of Non-Construction Costs in a sentence

  • Non-Construction Costs After OHP has a fully executed Contract with Grantee, Property Owner, and Mortgage Lender, Grantee may submit a payment request for up to 20% of grant amount for non-construction costs such as acquisition documents, design drawings, plans, specifications, and administrative costs directly related to the Project.

  • We should marry without having any concerns.” Kesa Gozen told Moritoo of the conspiracy she planned out.

  • Land Costs)407,738,281Owner Insurance61,590,428TOTAL Non-Construction Costs$1,559,968,821Note: Non-Construction Costs as agreed with AEA based on typical similar projects.

  • Along the same lines, the federal prosecutor of Santa Fe, Alejandro G.

  • If the Member is credited by the Authority with paying Non-Construction Costs in excess of the Member’s Subscription Fee, the amount of the excess shall be applied as agreed to by the Authority and the Member.

  • Finding C: FEMA Improperly Overstated Non-Construction Costs as a Result of Overstating Base CostsThe Cost Estimating Format calculates non-construction costs (Parts B–H) as a percentage of the base cost (Part A).

  • Subject to the provisions of this Agreement, from time to time as work on the Project progresses, Lender shall make Construction Advances to Borrower, in an aggregate principal amount not to exceed the Budget, in the amounts specified in Section 8.4, for the purpose of paying Construction Costs and Non-Construction Costs incurred in connection with the Project.

  • February 1873 in Athol Township, Prince Edward County, Ontario,506 d.

  • That portion or all of any Member’s Subscription Fee that the Member is not credited by the Authority as having paid, shall be paid by the Member within ninety (90) days after the Authority determines the cumulative Non-Construction Costs for the applicable Construction Phase of the Water Treatment Facilities to which the Member is subscribing.

  • For example, if a Member wants a Reserved Capacity of 0.50 MGD of the 1.0 MGD Water Treatment Facilities (50%), and the cumulative Non-Construction Costs for the Reserved Capacity in the applicable Construction Phase are $300,000, the Member’s Subscription Fee will be $150,000.


More Definitions of Non-Construction Costs

Non-Construction Costs means the preliminary costs and Capital Support Costs associated with the acquisition, construction, reconstruction, replacement, remodeling, modification, alteration, enlargement, renovation, furnishing and refurnishing of the improvements listed in Section 4.55.300 B, including preventive capital maintenance and energy efficient capital improvements to the improvements listed in Section
Non-Construction Costs has the meaning given in Schedule 21 – Construction Period Payments.

Related to Non-Construction Costs

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Construction Costs means land costs, all costs paid to construct and complete the Improvements, as specified on Exhibit "B" attached hereto and made a part hereof.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Original construction ’ shall mean the first or initial construction

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Construction and demolition debris means and includes:

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Foreign construction material means a construction material other than a domestic construction material.

  • Construction Debt means debt incurred to fund (a) all or a portion of a Capital Improvement, (b) interest payments (including periodic net payments under related interest rate swap agreements) and related fees on other Construction Debt or (c) distributions (including incremental Incentive Distributions) on Construction Equity.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Interconnection Construction Service Agreement means the agreement entered into by an Interconnection Customer, Interconnected Transmission Owner and the Transmission Provider pursuant to Tariff, Part VI, Subpart B and in the form set forth in Tariff, Attachment P, relating to construction of Attachment Facilities, Network Upgrades, and/or Local Upgrades and coordination of the construction and interconnection of an associated Customer Facility. A separate Interconnection Construction Service Agreement will be executed with each Transmission Owner that is responsible for construction of any Attachment Facilities, Network Upgrades, or Local Upgrades associated with interconnection of a Customer Facility. Interconnection Customer:

  • Leasing Costs means, with respect to a particular Lease, all capital costs, expenses incurred for capital improvements, equipment, painting, decorating, partitioning and other items to satisfy the initial construction obligations of the landlord under such Lease (including any expenses incurred for architectural or engineering services in respect of the foregoing), “tenant allowances” in lieu of or as reimbursements for the foregoing items, payments made for purposes of satisfying or terminating the obligations of the tenant under such Lease to the landlord under another lease (i.e., lease buyout costs), relocation costs, temporary leasing costs, leasing commissions, brokerage commissions, legal, design and other professional fees and costs, in each case, to the extent the landlord is responsible for the payment of such cost or expense under the relevant Lease or any other agreement relating to such Lease.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Remediation Costs means the cost of any action taken to reduce the concentration of contaminants on, in or under the Eligible Property to permit a record of site condition to be filed in the Environmental Site Registry under section 168.4 of the Environmental Protection Act and the cost of complying with any certificate of property use issued under section 168.6 of the Environmental Protection Act, as further specified in the CIP.