Carried Forward to Summary of definition

Carried Forward to Summary of. Section No. 3 Page No 49 50 51 52 53 54 R Amount Item No BILL No.4 Quantity Rate STAND PIPES: EARTHWORKS
Carried Forward to Summary of. Section No. 3 49 50 51 52 53 54 R Amount Item No BILL No.4 Quantity Rate STAND PIPES: EARTHWORKS SITE CLEARANCE ETC 1 Allow for clearing the area of the site to be built upon of all grass, weeds, shrubs, trees with trunks not exceeding 200mm girth, debris, etc., including grubbing up all roots, scoffling up as required and cart away all vegetation and debris. m2 14 2 Stripping average 300mm thick layer of topsoil and stockpiling on site. m2 14
Carried Forward to Summary of. Section No. 3 38 39 40 41 42 43 44 45 46 R Amount Item No BILL NO.3 Quantity Rate ELEVATED TANKS EARTHWORKS (PROVISIONAL) Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior approval from the Architect. Nature of ground: The nature of the ground is assumed to be loose xxxxx material, therefore 'earth', but possibly interspersed with hard or soft rock. Carting away of excavated material: Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or, alternatively, from stock piles situated on the building site.

Examples of Carried Forward to Summary of in a sentence

  • Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section 2 Bill No. 5 Roof Coverings Etc.

  • Section No. 3 External Works (Provisional) Bill No. 1 Rain Water Tanks COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 3 33 34 35 36 R Amount Item No BILL NO.2 Quantity Rate BUFFER TANKS EARTHWORKS (PROVISIONAL) Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required.

  • Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section 2 Bill No. 11 Paintwork 71 R Amount SECTION SUMMARY - BUILDING WORKS Bill No Page No Earthworks (Provisional) 32 Concrete, Formwork and Reinforcement 37 Masonry 43 Waterproofing 46 Roof Coverings Etc.

  • Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section 2 Bill No. 11 Paintwork R Amount SECTION SUMMARY - BUILDING WORKS Bill No Page No Earthworks (Provisional) 31 Concrete, Formwork and Reinforcement 36 Masonry 42 Waterproofing 45 Roof Coverings Etc.

  • No 1 Carried to Collection R Section No. 3 External Works (Provisional) Bill No. 6 Tool Box COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 3 R Amount Item No BILL NO.


More Definitions of Carried Forward to Summary of

Carried Forward to Summary of. Section No. 2 Section No. 2 NEW BUILDINGS Bill No. 2 CARPENTRY AND JOINERY Completion of Lepelle Municipal Office 135 136 137 R Amount Item No SECTION NO. 2 Quantity Rate BILL NO. 7 CEILINGS, PARTITIONS AND ACCESS FLOORING PREAMBLES For preambles see "Construction Specifications - General Specification (PW371-A)" and "Construction Specifications - Particular Specification (PW371-B)" SUPPLEMENTARY PREAMBLES Descriptions Items described as "nailed" shall be deemed to be fixed with hardened steel nails or pins or shot pinned to brickwork or concrete Items described as "plugged" shall be deemed to include screwing to fibre, plastic or metal plugs at maximum 600mm centres, and where described as "bolted", these bolts have been given elsewhere Ceilings Unless otherwise described, ceilings shall be deemed to be horizontal Steel components All steel components for ceilings, partitions, etc are to be galvanised in accordance with SANS 121 Finishes to suspended ceilings All finishes to be applied at the factory during the manufacturing process and to be delivered on site "pre- finished" as described. No applying of finishes on site will be allowed Carried to Collection R Section No. 2 NEW BUILDINGS Bill No. 3 CEILINGS, PARTITIONS AND ACCESS FLOORING Completion of Lepelle Municipal Office Amount Fixing of electrical light fittings, diffusers, panels, etc. to suspended ceilings Electrical light fittings, diffusers, panels, etc. generally are "lay in" units of the same dimensions as the suspension grid described and allowance must be made accordingly for their support inclusive of any flexibility in setting out that may be required (ceiling panels have not been deducted and pricing is to take cognizance thereof) CEILING TIMBERS, BEADS, INSULATION, ETC Ceiling insulation 1 50mm Insulation closely fitted and laid on top of brandering between roof timbers, etc m2 752 Wrought meranti
Carried Forward to Summary of. Section No. 2 Bill No. 6 CARPENTRY & JOINERY Page No 49 50 51 52 R Amount Item No SECTION 2 Quantity Rate BILL NO. 7
Carried Forward to Summary of. Section No. 3 R Amount Item Quantity Rate Amount
Carried Forward to Summary of. Section No. 2 Section 2 Bill No. 1 Foundations (Provisional) Page No 162 163 164 165 R Amount Item No SECTION 2 Quantity Rate BILL NO. 2
Carried Forward to Summary of. Section No. 2 Section No. 2 NEW BUILDINGS Bill No. 4 CEILINGS, PARTITIONS AND ACCESS FLOORING Completion of Lepelle Municipal Office 142 143 144 145 R Amount Item No SECTION NO. 2 Quantity Rate BILL NO. 9 IRONMONGERY PREAMBLES For preambles see "Construction Specifications - General Specification (PW371-A)" and "Construction Specifications - Particular Specification (PW371-B)" SUPPLEMENTARY PREAMBLES Proprietary items Where applicable the manufacturers' names or product catalogue titles are given in sub-headings preceding the items Prices are to be based on the specific products/articles specified. If tenderers wish to offer alternative products/articles for certain items, these items are to be clearly marked and the alternative specification given with supporting brochures etc clarifying the features of the products/articles offered On request returnable samples are to be provided to the principal agent for consideration Preparation of door frames Descriptions for flush bolts, door closers, floor springs, etc. shall be deemed to include all necessary preparations to door frames to accommodate same "En-suite" locks All "en-suite" locks shall be ordered to operate in a dedicated master keyed and/or grand master keyed lock system as described HINGES, BOLTS, ETC Carried to Collection R Section No. 2 NEW BUILDINGS Bill No. 5 IRONMONGERY Completion of Lepelle Municipal Office Amount "Dorma" 1 DBC-SS-022 SS Adjustable roller bolt No 4 2 160mm DFB-SS-027 Flush bolt with heel No 2 3 300mm DFB-SS-028 Flush bolt with heel No 2 4 DWC-006 SS WC indicator with 79 mm turn knob for physically impaired 5 PHA3/S Three point locking panic bar for double door with door leaf up to 1000mm wide and maximum 2270mm high (2101.2104.2104.2201.PHX02.PHX04) Sets 3 6 SR 392 Size 2 door co-ordinator for door leaf widths than 800mm No 3 LOCKS "Dorma" 7 D032D SS Bathroom deadlock No 2 8 D036S SS Euro-profile cylinder sash lock No 21 9 D035S SS Bathroom sash lock No 1 10 D037D SS Euro-profile cylinder dead lock No 6 11 35mm D07735 SS Narrow stile heavy duty swivel deadlock No 1 "EN-SUITE" LOCKS The following locks are to be suitable for master and grand master key operation "Dorma"
Carried Forward to Summary of. Section No. 3 Page No 57 58 59 R Amount Item No BILL No.5 Quantity Rate RETICULATION AND FITTINGS EARTHWORKS Site clearance, etc.: 1 Allow for clearing of site of all vegatable matter, rubbish, etc.including small trees having a circumference of less than 200mm measured at a height of 1 000mm above ground level, that may be encountered and roughly level site to be built upon and carting away any debris to a site to be found by the contractor. m2 539 2 Strip average 200mm thick layer of topsoil and stockpile on site. m2 539
Carried Forward to Summary of. Section No. 2 Section No. 2 NEW BUILDINGS Bill No. 10 PAINTWORK Completion of Lepelle Municipal Office 177 178 179 R Amount Section No. 2 NEW BUILDINGS SECTION SUMMARY - NEW BUILDINGS Bill No Page No 2 CARPENTRY AND JOINERY 138 3 CEILINGS, PARTITIONS AND ACCESS FLOORING 143 4 IRONMONGERY 150 5 METALWORK 157 6 PLASTERING 162 7 TILING 166 8 PLUMBING AND DRAINAGE (PROVISIONAL) 175 9 GLAZING 176