CAISO Grid definition

CAISO Grid means the system of transmission lines and associated facilities of the Participating Transmission Owners that have been placed under the CAISO’s operational control.
CAISO Grid means the system of transmission lines and associated facilities that have been placed under the CAISO’s operational control.
CAISO Grid has the same meaning as “CAISO Controlled Grid” as defined in the CAISO Tariff.

Examples of CAISO Grid in a sentence

  • The Energy Delivery Point shall be the PNode at the Project’s first point of interface with the CAISO Grid (as described and set forth in the single-line diagram of grid interconnection attached hereto as Appendix 1.3.1).

  • During the Delivery Period, Charging Energy for the Energy Storage System may be provided by the Generation Facility or from the CAISO Grid, at Buyer’s election.

  • On and after Initial Synchronization of the Facility to the CAISO Grid, Seller shall not authorize or designate any other party to act as the Facility’s Scheduling Coordinator, nor shall Seller perform for its own benefit the duties of Scheduling Coordinator, and Seller shall not revoke Buyer’s authorization to act as the Facility’s Scheduling Coordinator unless agreed to by Buyer.

  • Upon Initial Synchronization of the Facility to the CAISO Grid, Buyer shall be the Scheduling Coordinator or designate a qualified third party to provide Scheduling Coordinator services with the CAISO for the Facility for both the delivery and the receipt of the Facility Energy, and if applicable, the Test Energy, at the Delivery Point.


More Definitions of CAISO Grid

CAISO Grid means the system of transmission lines and associated facilities of the Participating Transmission Owners that have been placed under the CAISO’s operational control.has the same meaning as “CAISO Controlled Grid” as defined in the CAISO Tariff.
CAISO Grid means the system of transmission lines and associated facilities of the Participating Transmission Owner that have been placed under the CAISO’s operational control.

Related to CAISO Grid

  • CAISO Tariff means the California Independent System Operator Corporation Operating Agreement and Tariff, including the rules, protocols, procedures and standards attached thereto, as the same may be amended or modified from time to time and approved by the FERC.

  • CAISO means the California Independent System Operator Corporation or any successor entity performing similar functions.

  • Renewable Energy Standard means the minimum renewable energy capacity portfolio, if applicable, and the renewable energy credit portfolio required to be achieved under section 28 or former section 27.

  • PJM EIS GATS means the PJM Environmental Information Services, Inc. Generation Attribute Tracking System.

  • Transmission System Operator means a natural or legal person responsible for operating, ensuring the maintenance of and, if necessary, developing the transmission system in a given area and, where applicable, its interconnections with other systems, and for ensuring the long-term ability of the system to meet reasonable demands for the transmission of electricity;

  • 911 system means the set of network, database and customer premise equipment (CPE) components required to provide 911 service.

  • Network Resource shall have the meaning as provided in the NYISO OATT, for such resources located in New York, and the meaning as provided in the PJM OATT, for such resources located in PJM.

  • energy management system means a set of interrelated or interacting elements of a plan which sets an energy efficiency objective and a strategy to achieve that objective;

  • Energy efficiency measure means equipment, devices, or materials intended to decrease energy consumption, including, but not limited to, upgrades to a building envelope such as insulation and glazing; improvements in heating, ventilating and cooling systems; automated energy control systems; improved lighting, including daylighting; energy‑recovery systems; combined heat and power systems; or another utility cost‑savings measure approved by the governing body.

  • CAISO-Approved Meter means any revenue quality, electric energy measurement meter furnished by Seller, that (a) is designed, manufactured and installed in accordance with the CAISO’s metering requirements, or, to the extent that the CAISO’s metering requirements do not apply, Prudent Electrical Practices, and (b) includes all of the associated metering transformers and related appurtenances that are required in order to measure the net electric energy output from the Generating Facility.

  • NERC means the North American Electric Reliability Corporation.

  • Transportation network company means a company or organization facilitating and/or providing transportation services using a computer or digital application or platform to connect or match passengers with drivers for compensation or a fee.

  • Local Utility Services XOOM is an independent retail marketer of natural gas & electricity and is not affiliated with your local utility. Your local utility will continue to deliver your gas, read your meter, send your bill, and make necessary repairs. Your local utility will also respond to emergencies and provide other basic utility services as required. XOOM is not an agent of your local utility and your utility will not be liable for any of XOOM’s acts, omissions, or representations. Price:Your rate for gas purchases will be a fixed price of $0.4490 per therm, plus taxes and fees, if applicable, and a monthly administrative fee of $2.99. You will continue to be responsible for all charges assessed by your local utility for all services it provides, including any other fees or taxes specifically associated with services it continues to provide during the term of this Agreement, including transportation charges payable for Core Aggregation Service.