SYSTEM ACCEPTANCE TESTING AND COMMISSIONING TURNOVER PACKAGE Sample Clauses

SYSTEM ACCEPTANCE TESTING AND COMMISSIONING TURNOVER PACKAGE. Interconnecting Party’s technical personnel, with the assistance of the equipment manufacturer(s) as needed, will perform a complete Commissioning of the DC and AC system equipment following Interconnecting Party’s rigorous Commissioning procedures. These Commissioning procedures shall include the tests outlined in this Exhibit as well as other standard tests, inspections, safety and quality checks for solar photovoltaic power plants of a similar size. All testing and Commissioning will be conducted in accordance with Interconnecting Party’s specifications. The system inverters will be Commissioned on site by a manufacturer’s representative or qualified technician and will confirm that the inverter can be operated locally per specification and that automatic operations such as wake-up and sleep routines, power tracking and fault detection responses occur as specified. Upon completion of each of the Commissioning procedures, Interconnecting Party’s technician or engineer will initial the Commissioning checklist or test result page to indicate that the test has been completed successfully. The results of string testing will be summarized and complete results will be provided in CD-ROM format. Documentation of all procedures and complete test results will be submitted to Company in hard copy and/or electronic format.
AutoNDA by SimpleDocs

Related to SYSTEM ACCEPTANCE TESTING AND COMMISSIONING TURNOVER PACKAGE

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • ACCEPTANCE TESTS 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract.

  • TESTING AND COMMISSIONING 24 Allow for a Lump Sum for testing and commissioning of the entire electrical installation, including the provision of Compliance Certificate. Item Carried to Collection R Section No. 4 Electrical Installation (Provisional) Bill No. 1 Electrical Installation COLLECTION Total Brought Forward from Page No. Carried to Final Summary 76 77 R Amount FINAL SUMMARY Section No Page No 1 Preliminaries 26 2 Alterations (Provisional) 30 3 External Works (Provisional) 73

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Construction Phase Services 3.1.1 – Basic Construction Services

Time is Money Join Law Insider Premium to draft better contracts faster.