WBMLP System Protection Tests Sample Clauses

WBMLP System Protection Tests. Perform CT and CT circuit polarity, ratio, insulation, excitation, continuity and burden tests for any CTs utilized for WBMLP interface protection requirements. • Perform VT and VT circuit polarity, ratio, insulation and continuity tests for any VTs utilized for WBMLP interface protection requirements. • Perform relay pick up and time delay tests for the actual settings to be utilized. • Perform functional circuit breaker trip testing from protective relays. • Perform relay in service test to verify proper phase rotation and magnitudes of currents and voltages. • Perform circuit breaker close interlock testing if applicable. • Perform paralleling and disconnection operation, including anti-islanding upon loss of the WBMLP interface. This can be simulated by opening a switch in series with the interface and verifying that the facility disconnects.
AutoNDA by SimpleDocs

Related to WBMLP System Protection Tests

  • Polygraph Tests The Employer agrees that polygraph or similar lie detector tests will not be used.

  • Health Tests At the time of employment, the Employer shall provide a Tuberculin skin test at no cost to the nurse. In the event of a positive reaction to this test, the Employer will provide a chest x-ray at no cost. Upon request, a routine blood examination and urinalysis will be provided at no cost to the nurse once each year.

  • Information Technology Accessibility Standards Any information technology related products or services purchased, used or maintained through this Grant must be compatible with the principles and goals contained in the Electronic and Information Technology Accessibility Standards adopted by the Architectural and Transportation Barriers Compliance Board under Section 508 of the federal Rehabilitation Act of 1973 (29 U.S.C. §794d), as amended. The federal Electronic and Information Technology Accessibility Standards can be found at: xxxx://xxx.xxxxxx-xxxxx.xxx/508.htm.

  • CONTRACT WORK HOURS AND SAFETY STANDARDS As per the Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708), where applicable, all Customer Purchase Orders in excess of ,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5). Under 40 U.S.C. 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Contractor Work Hours and Safety Standards Contractor shall ensure compliance with all safety and hourly requirements for employees, in accordance with federal, state, and County safety and health regulations and laws.

  • Contractor Requirements The Contractor shall—

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

Time is Money Join Law Insider Premium to draft better contracts faster.