Standard Drawings Sample Clauses

Standard Drawings. Use a moving operation only if the minimum speed maintained at all times is 3 mph with no stops that narrow or close a lane of travel. If the moving operation is progressing slower than 3 mph at any time, install a lane closure. Maintain the existing traffic pattern at all times, except in the immediate work zone where lane closures are allowed as determined by the Engineer. Refer to attached details and Standard Drawing No. 1101.02, 1101.03, 1101.04, 1101.05, 1101.11, 1110.01, 1110.02, 1115.01, 1130.01, 1135.01, 1145.01, 1150.01, 1165.01, and 1180.01 of the 2012 Roadway Standard Drawings when closing a lane of travel in a stationary work zone such as pavement patching resurfacing, or pavement marking removal. Properly ballasted cones and skinny drums may be used instead of drums. However, drums are required for the upstream taper portion of lane closures in all applications. The stationary work zone shall be a maximum of 1 mile in length at any given time on 2 Lane, 2 Way facilities unless otherwise approved by the Engineer. A pilot vehicle operation may be used in conjunction with flaggers and the appropriate pilot vehicle warning signing as directed by the Engineer. During periods of construction inactivity, return the traffic pattern to the existing alignment and remove or cover any work zone signs. When covering work zone signs, use an opaque material that prevents reading of the sign at night by a driver using high beam headlights. Use material, which does not damage the sign sheeting. Replace any obliterated markings as required by other sections of the 2012 Standard Specifications and the Engineer.
AutoNDA by SimpleDocs
Standard Drawings. 5.3.3.1 Civil - Sitework Standard Drawing - General Notes 26089-200-C0-0000-00005 00B
Standard Drawings. Xxx Xxxxxxxx Xxxxxxxx Xxxxxxxx, Xxx Xxxxx Xxxx, 0000, and CITY approved supplements thereto.
Standard Drawings. Drawings prepared by SCE showing the construction requirements of the Distribution Line Extension.
Standard Drawings. In addition to the standard drawings referenced in the specifications, the following standard drawings shall apply: Drawing Number Description TSC-B-1.5A Typical Signing Obstruction Within Work Area
Standard Drawings a) Select standard drawings applicable to the project from those provided by FBGPTRA ENGINEER. All standards should be obtained in an electronic format and comply with all CADD standards set forth by the FBGPTRA Engineer.

Related to Standard Drawings

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Interest Drawings If on any Distribution Date, after giving effect to the subordination provisions of this Agreement, the Subordination Agent shall not have sufficient funds for the payment of any amounts due and owing in respect of accrued interest on the Class A Certificates or the Class B Certificates (at the Stated Interest Rate for such Class of Certificates) (other than any amount of interest which was due and payable on the Class A Certificates or the Class B Certificates on such Distribution Date but which remains unpaid due to the failure of the Depositary to pay any amount of accrued interest on the Deposits on such Distribution Date), then, prior to 12:30 p.m. (New York City time) on such Distribution Date, (i) the Subordination Agent shall request a drawing (each such drawing, an “Interest Drawing”) under the Liquidity Facility with respect to such Class of Certificates in an amount equal to the lesser of (x) an amount sufficient to pay the amount of such accrued interest (at the applicable Stated Interest Rate for such Class of Certificates) and (y) the Available Amount under such Liquidity Facility, and shall pay such amount to the Trustee with respect to such Class of Certificates in payment of such accrued interest.

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.

  • Non-Extension Drawings If the Liquidity Facility is scheduled to expire on a date (the “Stated Expiration Date”) prior to the date that is 15 days after the Final Maturity Date with respect to the ACS Group Loans, then, no earlier than the 60th day and no later than the 30th day prior to the applicable Stated Expiration Date then in effect, the Administrative Agent shall request that the Liquidity Facility Provider extend the Stated Expiration Date until the earlier of (i) the date which is 15 days after the Final Maturity Date with respect to the ACS Group Loans and (ii) the date that is immediately preceding the 364th day occurring after the Stated Expiration Date then in effect (unless the obligations of the Liquidity Facility Provider under the Liquidity Facility are earlier terminated in accordance with the Liquidity Facility). If on or before the date which is 10 days prior to the Stated Expiration Date, (A) the Liquidity Facility shall not have been replaced in accordance with Section 3.10(d) hereof or (B) the Liquidity Facility Provider fails irrevocably and unconditionally to advise the Administrative Agent that such Stated Expiration Date then in effect shall be so extended (whether or not the Administrative Agent has in fact requested an extension), the Administrative Agent shall immediately, in accordance with the terms of the Liquidity Facility (a “Non-Extended Facility”), request a drawing under such Liquidity Facility (such drawing, a “Non-Extension Drawing”) for the Available Amount thereunder. Amounts drawn pursuant to a Non-Extension Drawing shall be deposited into the Liquidity Facility Reserve Account.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Final Working Drawings After the Final Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, Title 24 calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow all of Tenant’s Agents to bid on the work and to obtain all applicable permits (collectively, the ‘‘Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned, or delayed. Tenant shall supply Landlord with four (4) copies signed by Tenant of such Final Working Drawings, Landlord shall not unreasonably withhold, condition, or delay its approval of the Final Working Drawings. Landlord shall approve or reasonably EXHIBIT A disapprove of the Final Working Drawings within ten (10) business days after Landlord’s receipt thereof. If Landlord reasonably withholds its approval, Landlord shall provide Tenant with the specific reasons therefor.

  • Selection of Architect/Construction Drawings Tenant shall retain the architect/space planner designated by Tenant and reasonably approved by Landlord (the “Architect”) to prepare the “Construction Drawings,” as that term is defined in this Section 3.2. Tenant shall retain the engineering consultants selected by Tenant (the “Engineers”) to prepare all plans and engineering working drawings relating to the structural, mechanical, electrical, plumbing, HVAC, life safety, and sprinkler work in the Premises, which work is not part of the Base Building. The plans and drawings to be prepared by Architect and the Engineers hereunder shall be known collectively as the “Construction Drawings.” All Construction Drawings shall comply with the drawing format and specifications reasonably determined by Landlord, and shall be subject to Landlord’s approval. Tenant and Architect shall verify, in the field, the dimensions and conditions as shown on the relevant portions of the base building plans, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith. Landlord’s review of the Construction Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord’s review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Construction Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord or Landlord’s space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Construction Drawings, and Tenant’s waiver and indemnity set forth in the Lease shall specifically apply to the Construction Drawings.

  • Application of Interest Drawings Notwithstanding anything to the contrary contained in this Agreement, (i) all payments received by the Subordination Agent in respect of an Interest Drawing under the Class A Liquidity Facility and all amounts withdrawn by the Subordination Agent from the Class A Cash Collateral Account, and payable in each case to the Class A Certificateholders or the Class A Trustee, shall be promptly distributed to the Class A Trustee and (ii) all payments received by the Subordination Agent in respect of an Interest Drawing under the Class B Liquidity Facility and all amounts withdrawn by the Subordination Agent from the Class B Cash Collateral Account, and payable in each case to the Class B Certificateholders or the Class B Trustee, shall be promptly distributed to the Class B Trustee.

  • Downgrade Drawings (i) Each Liquidity Provider will promptly, but in any event within ten (10) days of the occurrence of a Downgrade Event with respect to it (the date of such occurrence, the “Downgrade Date”), deliver notice to the Subordination Agent and American of the occurrence of such Downgrade Event and the Downgrade Date therefor. After the occurrence of a Downgrade Event with respect to any Liquidity Provider, each Liquidity Facility provided by such Liquidity Provider shall become a “Downgraded Facility” on the thirty-fifth (35th) day after the related Downgrade Date, unless, not later than such thirty-fifth (35th) day (or, if earlier, the expiration date of such Downgraded Facility), the Rating Agency whose downgrading of such Liquidity Provider resulted in such Downgrade Event shall have provided a written confirmation to the effect that the occurrence of such Downgrade Event will not result in the downgrading, withdrawal or suspension of the ratings then issued by such Rating Agency of the related Class of Certificates. Notwithstanding the foregoing, if at any time after the occurrence of such Downgrade Event, such Liquidity Provider notifies the Subordination Agent in writing that no such confirmation will be provided by such Rating Agency, each Liquidity Facility provided by such Liquidity Provider shall become a Downgraded Facility as of the date of such notice to the Subordination Agent.

  • Agreement to Repay Letter of Credit Drawings (a) The Borrower agrees to reimburse each Issuing Lender, by making payment to the Administrative Agent in immediately available funds at the Payment Office, for any payment or disbursement made by such Issuing Lender under any Letter of Credit issued by it (each such amount, so paid until reimbursed by the Borrower, an “Unpaid Drawing”), by making payment in Dollars (in the case of all Dollar Denominated Letters of Credit), Euros (in the case of Euro Denominated Letters of Credit) or Sterling (in the case of Sterling Denominated Letters of Credit) not later than one Business Day following receipt by the Borrower of notice of such payment or disbursement (provided that no such notice shall be required to be given if a Default or an Event of Default under Section 11.05 shall have occurred and be continuing, in which case the Unpaid Drawing shall be due and payable immediately without presentment, demand, protest or notice of any kind (all of which are hereby waived by the Borrower)), with interest on the amount so paid or disbursed by such Issuing Lender, to the extent not reimbursed prior to 1:00 P.M. (New York City time) on the date of such payment or disbursement, from and including the date paid or disbursed to but excluding the date such Issuing Lender was reimbursed by the Borrower therefor at a rate per annum equal to the Base Rate as in effect from time to time plus the Applicable Margin as in effect from time to time for Revolving Loans that are maintained as Base Rate Loans; provided, however, to the extent such amounts are not reimbursed prior to 1:00 P.M. (New York time) on the third Business Day following notice to the Borrower by the Administrative Agent or the respective Issuing Lender of such payment or disbursement, interest shall thereafter accrue on the amounts so paid or disbursed by such Issuing Lender (and until reimbursed by the respective Account Party) at a rate per annum which shall be (x) in the case of Dollar Denominated Letters of Credit, Sterling Denominated Letters of Credit, the Base Rate in effect from time to time plus the Applicable Margin for Revolving Loans in each case maintained as Base Rate Loans, as in effect from time to time plus 2% and (y) in the case of Euro Denominated Letters of Credit, the Overnight Euro Rate in effect from time to time plus the Applicable Margin for Euro Denominated Loans as in effect from time to time plus any Mandatory Costs plus 2%, in each such case, with interest to be payable on demand, provided further, that it is understood and agreed, however, that the notices referred to above in this clause (a) and in the immediately preceding proviso shall not be required to be given if a Default or an Event of Default under Section 11.05 shall have occurred and be continuing (in which case the Unpaid Drawings shall be due and payable immediately without presentment, demand, protest or notice of any kind (all of which are hereby waived by each Credit Party) and shall bear interest at the rate provided in the foregoing proviso on and after the third Business Day following the respective Drawing). The respective Issuing Lender shall give the Borrower prompt notice of each Drawing under any Letter of Credit, provided that the failure to give, or any delay in giving, any such notice shall in no way affect, impair or diminish the Borrower’s obligations under this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.