Service Line Tie-Over Sample Clauses

Service Line Tie-Over. Service line Tie-Overs are measured by the number of each size, material, and type installed. The types specified will either be short side service tie-over for those that do not require the crossing of a street or roadway; and long side service tie-over when the installation will span a roadway.
AutoNDA by SimpleDocs
Service Line Tie-Over. Service Line Tie-Overs will be paid for at the Contract Unit Price per each for each type (Long Side, or Short Side), size and material installed. Payment is full compensation for excavating, erosion control, backfilling, removing, and replacing pavement, testing and placing fittings, jointing, and connecting to the main, and providing other incidentals necessary to complete the Item. Payment will also include all work referenced in Section 665.3.05.A.6 of this specification and laying pipe in casing when required.
Service Line Tie-Over. Tie existing service line to new service line as shown on the plans or where approved by the Engineer or Project Coordinator. Install new pipe from the gas main to the final location of the Service Line Tie-Over or to points approved by the Engineer or Project Coordinator to connect with existing service lines on abutting property. Follow all relevant procedures set forth in the City of Louisville Gas System Standards and Specifications, current published edition.

Related to Service Line Tie-Over

  • Purchase Order Flip via Ariba Network (AN) The online process allows suppliers to submit invoices via the AN for catalog and non- catalog goods and services. Contractors have the ability to create an invoice directly from their Inbox in their AN account by simply “flipping” the purchase order into an invoice. This option does not require any special software or technical capabilities. For the purposes of this section, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider of MFMP the right and license to use, reproduce, transmit, distribute, and publicly display within the system the information outlined above. In addition, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider the right and license to reproduce and display within the system the Contractor’s trademarks, system marks, logos, trade dress, or other branding designation that identifies the products made available by the Contractor under the Contract.

  • Service Overview Contractor agrees to provide to the California Department of Health Care Services (DHCS) the services described herein.

  • Jointly Provided Switched Access Services 7.5.1 Jointly Provided Switched Access Service is described and governed by the FCC and state access Tariffs, Multiple Exchange Carrier Access Billing (MECAB) and Multiple Exchange Carrier Ordering and Design (MECOD) Guidelines and based on LERG routing, and is not modified by any provisions of this Agreement. Both Parties agree to comply with such guidelines. CenturyLink and CLEC agree that the originating, intermediate, and terminating LECs for switched access will cooperatively determine the Jointly Provided Switched Access arrangements in which all parties concur.

  • Coordination, Oversight and Monitoring of Service Providers As set forth in the Administrative Services Agreement between the Fund and CRMC, CRMC shall coordinate, monitor and oversee the activities performed by the Service Providers with which AFS contracts. AFS shall monitor Service Providers’ provision of services including the delivery of Customer account statements and all Fund-related material, including summary prospectuses and/or prospectuses, shareholder reports, and proxies.

  • Line Outage Costs Notwithstanding anything in the NYISO OATT to the contrary, the Connecting Transmission Owner may propose to recover line outage costs associated with the installation of Connecting Transmission Owner’s Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades on a case-by-case basis.

  • Scheduled Downtime For the purposes of this Agreement, Scheduled Downtime will mean those hours, as determined by us but which will not occur between the hours of 9:00 AM and 5:00 PM Pacific Time, Monday through Friday without your authorization or unless exigent circumstances exist, during which time we will perform scheduled maintenance or adjustments to the Environment. We will use our best efforts to provide you with at least twenty-four (24) hours of notice prior to scheduling Scheduled Downtime.

  • Cost of Repairs 54.1 Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the loss or damage arises from the Contractor's acts or omissions.

  • Agreement with Respect to Leased Data Processing Equipment (a) The Receiver hereby grants to the Assuming Bank an exclusive option for the period of ninety (90) days commencing the day after Bank Closing to accept an assignment from the Receiver of any or all Data Processing Leases to the extent that such Data Processing Leases can be assigned.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • End User Agreement This publication is distributed under the terms of Article 25fa of the Dutch Copyright Act. This article entitles the maker of a short scientific work funded either wholly or partially by Dutch public funds to make that work publicly available for no consideration following a reasonable period of time after the work was first published, provided that clear reference is made to the source of the first publication of the work. Research outputs of researchers employed by Dutch Universities that comply with the legal requirements of Article 25fa of the Dutch Copyright Act, are distributed online and free of cost or other barriers in institutional repositories. Research outputs are distributed six months after their first online publication in the original published version and with proper attribution to the source of the original publication. You are permitted to download and use the publication for personal purposes. All rights remain with the author(s) and/or copyrights owner(s) of this work. Any use of the publication other than authorised under this licence or copyright law is prohibited. If you believe that digital publication of certain material infringes any of your rights or (privacy) interests, please let the University Library know, stating your reasons. In case of a legitimate complaint, the University Library will, as a precaution, make the material inaccessible and/or remove it from the website. Please contact the University Library through email: xxxxxxxxx@xxx.xx.xx. You will be contacted as soon as possible. University Library Radboud University