Seller’s Interconnection and Transmission Service Applications Sample Clauses

Seller’s Interconnection and Transmission Service Applications. Seller shall apply for and exercise diligence in obtaining a FERC-accepted interconnection agreement to interconnect the Generating Facility to the Transmission Provider’s electric system and any transmission, distribution or other service agreement required to transmit electric energy on the Transmission Provider’s electric system to the Delivery Point.
AutoNDA by SimpleDocs
Seller’s Interconnection and Transmission Service Applications. So long as the Delivery Point (Ivanpah substation) in effect as of the Effective Date has not been changed in accordance with Section 3.08, Seller shall neither withdraw the CAISO Queue Position that is to be used for the Generating Facility and this Agreement nor assign or transfer that CAISO Queue Position to any entity or for the benefit of any other power purchase and sale arrangement without the prior written consent of SCE if such assignment or transfer would preclude the use of the CAISO Queue Position for the full Contract Capacity of the Generating Facility. If the Delivery Point is modified in accordance with Section 3.08, Seller shall obtain a position in the CAISO queue for that Delivery Point for the Generating Facility and this Agreement and shall neither withdraw that CAISO queue position nor assign or transfer that CAISO queue position to any entity or for the benefit of any other power purchase and sale agreement without the prior written consent of The contents of this document are subject to restrictions on disclosure as set forth herein.
Seller’s Interconnection and Transmission Service Applications. Seller shall neither withdraw the CAISO Queue Position that is to be used for the Generating Facility and this Agreement, nor assign or transfer the CAISO Queue Position to any entity or for the benefit of any other power purchase and sale arrangement, without the prior written consent of SCE if such assignment or transfer would preclude the use of the CAISO Queue Position for the full Contract Capacity of the Generating Facility. Seller shall apply for and exercise diligence in obtaining a FERC-accepted interconnection agreement to interconnect the Generating Facility to the Transmission Provider’s electric system and any transmission, distribution or other service agreement required to transmit electric energy on the Transmission Provider’s electric system, solely to the extent required in accordance with the CAISO Tariff and SCE’s tariffs. The contents of this document are subject to restrictions on disclosure as set forth herein.

Related to Seller’s Interconnection and Transmission Service Applications

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Points of Interconnection and Trunk Types 2.1 Point(s) of Interconnection.

  • CONNECTING TRANSMISSION OWNER’S INTERCONNECTION FACILITIES As depicted on the one-line diagram in Attachment 3, the Connecting Transmission Owner’s Interconnection Facilities consist of the following constructed or installed between the POI and PCO, as well as metering and telecommunications located at the Xxxxxxxxx Solar Collector Substation.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Interconnection 2.1.10 Startup Testing and Commissioning

Time is Money Join Law Insider Premium to draft better contracts faster.