Review Design Documents Sample Clauses

Review Design Documents. A. Attend periodic design meetings with Design Consultant and AWU to provide consultation on aspects of the design that will impact the budget, schedule and quality of the completed Project.
AutoNDA by SimpleDocs

Related to Review Design Documents

  • Design Documents Prepare and submit the following documents to the DAS - Records Management Office with a copy of the transmittal letter submitted to the respective Project Manager:

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Construction Documents Phase 2.2.1.5. Bidding or Negotiation Phase: 2.2.1.6. Construction Administration Phase

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Contractor’s Completion Documents Receive from Contractor, review, and transmit to Owner maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance required by the Construction Contract Documents, certificates of inspection, tests and approvals, and Shop Drawings, Samples, and other data. Receive from Contractor, review, and transmit to Owner the annotated record documents which are to be assembled by Contractor in accordance with the Construction Contract Documents to obtain final payment. The extent of Engineer’s review of record documents shall be to check that Contractor has submitted all pages.

  • REVIEW OF CONTRACT DOCUMENTS 4.2.1 The Contractor shall carefully study and compare the Contract Documents and shall immediately report in writing to the Architect and the State any error, inconsistency or omission he may discover. The Contractor shall not be liable to the State or the Architect for any damage resulting from any such errors, inconsistencies or omissions in the Contract Documents. The Contractor shall perform no portion of the Work at any time without Contract Documents or, where required, approved Shop Drawings, Product Data or Samples for such portion of the Work.

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner.

  • Review Documents The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, Refer to Exhibit C: Document Distribution Matrix for the required number of documents required for each review stage. The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. UFirm/Position Classification UHourly Billing Rate Architecture – Huckabee Principal / Executive $250.00 Project Architect / Associate Principal $200.00 BIM Specialist $150.00 Project Leader $80.00 Project Engineer $200.00 Quality Control $100.00 Structural Leader $100.00 Engineer-in-Training $80.00 Intern / Draftsman $60.00 Administrative Staff $45.00 Urban Planner $150.00 Public Relations Consultant $150.00 Construction Observer $100.00 Design Architecture – Xxxxx Sports Principal $300.00 Senior Designer $200.00 Project Manager $160.00 Project Architect $130.00 Architect $110.00 Intern Architect $90.00 Interior Designer $100.00 MEP Engineering – Xxxxx DBR Partner $240.00 Project Manager $185.00 Senior Engineer $185.00 Senior Technology Designer $155.00 Engineer / Senior Designer $140.00 Senior Construction Administrator $140.00 Technology Designer $130.00 Commissioning Agent $130.00 Quality Assurance / Quality Control $130.00 Construction Administrator $110.00 Sustainability Advisor $110.00 Designer (M, E, P) $110.00 CADD Operator $65.00 Administrative Staff $60.00 Structural Engineering – JQ + Tsen Partner $240.00 Principal $210.00 Senior Project Manager $175.00 Engineering Technical Lead $190.00 Project Manager $155.00 Senior Project Engineer $135.00 Project Engineer $120.00 Senior Technician $110.00 Technician $90.00 Administrative Staff $75.00 Civil Engineering – Xxxxxxx Xxxx Principal $225.00 Associate Principal $200.00 Director $200.00 Senior Project Manager $150.00 Senior Project Coordinator $150.00 Project Manager $120.00 Project Coordinator $120.00 Project Engineer $95.00 Senior Technician $110.00 Technician $80.00 Drafter $75.00 Research Manager $80.00 Technical Assistant $50.00 Executive Assistant $85.00 Senior Administrative Assistant $80.00 Administrative Assistant $70.00 Expert Witness Testimony $350.00 Landscape Architecture – Xxxxxxx Xxxx Principal $225.00 Associate Principal $200.00 Director $200.00 Senior Project Manager $150.00 Project Manager $120.00 Project Landscape Architect $95.00 Landscape Designer $75.00 Drafter $75.00 Executive Assistant $85.00 Senior Administrative Assistant $80.00 Administrative Assistant $70.00 Expert Witness Testimony $350.00 Cost Consultant – Vermeleuns Principal $275.00 Associate Principal $245.00 Associate $215.00 Senior Project Manager $185.00 Senior Estimator $185.00 Estimator $125.00 Administrative Staff $125.00 Data/Telecommunications Consultant – Crux Technology + Security Design Project Principal $150.00 Project Manager $150.00 Quality Assurance $130.00 Design Support Services $130.00 Production / Drawing Support $90.00 Acoustical/Audio-Visual Consultant – BAi Principal $200.00 Technical Systems Specialist $150.00 Food Service Consultant – Xxxxx Design Solutions Project Administrator $175.00 Project Designer $155.00 Production Staff $125.00 Security Consultant – Crux Technology + Security Design Project Principal $150.00 Project Manager $150.00 Quality Assurance $130.00 Design Support Services $130.00 Production / Drawing Support $90.00 Fire & Life Safety Consultant – Xxxxxx Xxxxxx Director / Operation Manager $230.00 Senior Fire Protection Engineer $215.00 Senior Consultant $165.00 Consultant $150.00 Fire Protection Engineer $150.00 Associate $135.00 Roofing Consultant – Rooftech Expert Witness $250.00 Principal Engineer $150.00 Principal Architect $150.00 Senior Construction Consultant $150.00 Project Manager $150.00 Certified Infrared Themographer $150.00 Registered Roof Consultant $150.00 Laboratory Technician $125.00 CADD Designer I $115.00 CADD Designer II $95.00 Contract Administrator $100.00 Registered Roof Observer $75.00 Full-Time Registered Roof Observer $75.00 Clerical / Report Processor $60.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost‐ effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Memorial Stadium Renovation and Expansion Project Number: 04-3176 Brief Project Description: Additional Project Information: Construction Delivery Method: Competitive Sealed Proposal (CSP) Project Schedule/Phases/Milestones: See Attached Include BIM milestones, pre‐design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Existing Documentation May 12, 2016 May 25, 2016 Huckabee Planning / Programming May 12,2016 May 24,2016 Huckabee/Xxxxx/Owner Schematic Design May 25, 2016 July 29, 2016 Design Team Design Development July 29, 2016 October 14, 2016 Design Team SD/DD Coordination September 28, 2016 October 6, 2016 Design Team/Owner Construction Documents October 17, 2016 January 16, 2017 Design team Facility Data Review XXX XXX TBD Construction May 26,2017 July 2018 GC/Design Team/Owner KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone Xxxxxxxx Xxxxxxxx Xxxxx Sports Xxxxx DBR JQ+Xxxx Xxxxxxx Xxxx (Civil) Xxxxxxx Xxxx (Landscape) Crux (data) Crux (security) XXX Xxxxx Xxxxxx Xxxxxx Xxxxxxxxx Xxxx Xxxxxx Xxxx Xxxxxx Xxxxxxx Xxxxxxxx Xxxxx Xxxxx Xxxx Xxxxxx Xxxxxx Xxxxxxxx Xxxxxx Xxxxxxxx Xxxx Xxxxxxxxxx Xxxx Xxxxxxxxxx Xxxxxxx Xxxxx Xxxxx Xxxxx Chi Do Xxxxx Xxxxxxx Project Leader BIM Spec. Designer MEP Civil Landscape Tech Security Acoustical Food Service Fire/Life Safe Cost Est. Houston Houston Atlanta Houston Dallas Dallas Dallas Ft Worth Ft Worth Xxxxxx Xxxxxx Xxxxxx S Xxxxxxx xxxxxxx@xxxxxxxx‐xxx.xxx xxxxxxx@huckabee‐xxx.xxx XXxxxxxx@xxxxx.xxx XXxxxx@xxxxxx.xxx xxxxxxx@xxxxx.xxx xxxxxxxxx@xxxx.xxx xxxxxxxxx@xxxx.xxx xxxxxxxxxxx@xxxxxxxxxxxxx.xxx xxxxxxxxxxx@xxxxxxxxxxxxx.xxx xxxxxx@xxxxxxxxx.xxx xxxxx@xxxxxxxxxxx.xxx xxx@xxxxxxxxxxxx.xxx xxxxxxxx@xxxxxxxxxx.xxx BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions – Huckabee-BIM Specialist-Xxxx Xxxxxx Upon delivery of existing documentation to Huckabee, the BIM specialist will construct a Revit model of the existing conditions, to the extent required for the completion of the project. Conditions will be field verified and the finished existing model will be delivered to Xxxxx for use as a design background. Design Authoring-Xxxxx-TBD Design Concept in Sketchup can begin based on approximations of existing conditions. From multiple design concepts, one will be chosen to carry into Schematic Design. Schematic Design will be based on actual existing conditions. The Schematic Design may combine the use of Revit and Sketchup to adequately convey the design intent while assuring accuracy and constructability Design Reviews-Owner-TBD The owner and Xxxxx will review the SD for design intent while Xxxxxxxx will review the SD with Xxxxx for adequacy of information to proceed into Design Development. The SD will be accurately scaled with appropriate consideration for Structural and Mechanical design before moving into Design Development. Space Tracking-Xxxxx-TBD/Huckabee-Project Leader-Xxxx Xxxxxx At the end of SD, upon transition to DD, and at the completion of DD, the model will be reviewed to assure continuing adherence to the space program for the project. Energy Analysis-Xxxxx DBR Daylighting Analysis-Xxxxx DBR Cost Estimation-Vermeulens 3D Coordination (design and construction)-Owner/Xxxxx/Huckabee Upon transition to DD, at the completion of DD, at 50% CD, and at any point a structural or mechanical issue impacts the design, the model will be reviewed to assure continuing adherence to the design intent. Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One‐Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type Arch Existing documentation Huckabee Upon completion Revit V16 .rvt Arch‐ Design/Conceptual Xxxxx Every two weeks Sketchup Arch‐ Design/Schematic Xxxxx Every two weeks Sketchup Arch‐Design Development Huckabee Every week Revit BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Huckabee & Xxxxx Revit v2016 Daily Interference Check Detect problems in the model where two building components are clashing including soft and hard Huckabee Navisworks Bi‐weekly Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Huckabee Revit v2016; Bluebeam Weekly Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non‐compliant elements and corrective action plans Huckabee Revit v2016 Weekly Other MODEL STRUCTURE File Naming Structure File Name Formatting <ProjectNumber>_<District>_<ProjectName>_<Discipline>_v16 Architectural Model 1754-01-01_TSU_MemorialStadiumReno_ARCH_v16 Structural Model 1754-01-01_TSU_MemorialStadiumReno_STRUC_v16 Mechanical Model 1754-01-01_TSU_MemorialStadiumReno_MECH_v16 Plumbing Model 1754-01-01_TSU_MemorialStadiumReno_PLUMB_v16 Fire Sprinkler Model 1754-01-01_TSU_MemorialStadiumReno_FIRE_v16 Electrical Model 1754-01-01_TSU_MemorialStadiumReno_ELEC_v16 Model Structure The single Architectural model will contain all architectural information, including interiors information as a part of the model. All other disciplines will be linked as separate models. The civil will be linked as a flattened CAD file, unless extreme site terrain warrants the development of a topographical surface. In that instance, the topography would be included in the architectural model. Measurement and Coordinate System BIM Project Location by Project Address through Internet Mapping Service. Shared Coordinates to be defined in architectural model and acquired by all consultant models. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/‐ 1/8” OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/‐ 1/8” OF ACTUAL SIZE AND LOCATION ACCURATE TO +/‐ [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes BIM models and CAD files coordination as required (max. weekly) .rvt v2016; .dwg v2016 ATTACHMENTS List any supporting information and attach. TAMUS/FPC Review Document Distribution Matrix

Time is Money Join Law Insider Premium to draft better contracts faster.