Remedy Selection Decision Factors Sample Clauses

Remedy Selection Decision Factors. 6.2.1 Short- and Long-Term Effectiveness Each corrective measure alternative must be evaluated as to its effectiveness in protecting human health and the environment and meeting the corrective action objectives. Both short- and long-term components of effectiveness must be evaluated; short-term referring to the construction and implementation period, and long-term referring to the period after the remedial action is complete. Estimate approximately how much time it will take to implement each corrective measure alternative, how much time to see initial beneficial results, and how much time to achieve the corrective action objectives. The evaluation of short-term effectiveness must include possible threats to the safety of nearby communities, workers, and environmentally sensitive areas (e.g., oceans, wetlands) during construction of the corrective measure alternative. Factors to consider are fire, explosion, exposure to hazardous substances and potential threats associated with treatment, excavation, transportation and re-disposal or containment of waste material. The evaluation of long-term effectiveness must include possible threats to the safety of nearby communities workers, and environmentally sensitive areas (e.g., oceans, wetlands) during operation of the corrective measure alternative.
AutoNDA by SimpleDocs
Remedy Selection Decision Factors 

Related to Remedy Selection Decision Factors

  • SITE-BASED DECISION MAKING A. The District shall provide the training and staff development to support accountability/site- based decision-making activities. Teachers shall be given release time to attend these programs.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Technical Objections No grievance shall be defeated merely because of a technical error, other than time limitations in the processing of the grievance through the grievance procedure. To this end, an arbitrator shall have the power to waive formal procedural irregularities in the processing of the grievance in order to determine the real matter in dispute.

  • Desirable Selection Criteria 1. Possession of, or significant progression toward the attainment of a post graduate qualification in area of specialty.

  • Claims Review Methodology a. C laims Review Population. A description of the Population subject to the Quarterly Claims Review.‌

  • Quality-based Selection Services for assignments which the Bank agrees meet the requirements set forth in paragraph 3.2 of the Consultant Guidelines may be procured under contracts awarded on the basis of Quality-based Selection in accordance with the provisions of paragraphs 3.1 through 3.4 of the Consultant Guidelines.

  • Technical Objections to Grievance No grievance will be defeated or denied by any minor technical objection.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Construction Change Directive A written order prepared and issued by the District, the Construction Manager, and/or the Architect and signed by the District and the Architect, directing a change in the Work.

Time is Money Join Law Insider Premium to draft better contracts faster.